Loading...
35-261 (3) FOR CONSTRUCTION Ground WEEB& Module Clamp R "' Unirac Solarmount oro�\acK ,- Rail w/L-foot i5M Green Fasten Flashing: 32 Taugwonk Spur,Al2 2 Stonginton,CT 06378 ECO-GFI-BLK-812 With Phone(860)535-3370 �G0 Sr Module(TYP.) —__.� ECO CP-SQ Compression Bracket Fax(413)683-2225 Pspra� �6 O G' Rooftop -% 5/16"x 3.5"S.S. Lag Bolt GRID-TIED "Ra�cers� w/2.5" Minimum Penetration PHOTOVOLTAIC SYSTEM X b t Sealed w/Approved Sealant 7.700kW DC @ STC RO G. SIDOTI, MIKE 56 W PARSONS LN. FLORENCE, MA 01062 Project# 10215077 1 Attachment Profile Attachment Detail DESIGNER: DKN REVIEWER: CR VERSION DATE. 2014-09-19 20"Max 20" Max REVISIONS Roof Framing PV Module Rail Overhang Rail Splice Rail Overhang # By Date Notes ,t 2 Roof tt tt tt '; tt Attachment s a Anchors located 5 on alternate roof s framing members Stagger splice locations Min of 2 supports -- - ---------r -- ^' - _ within the each row of modules on either side of splice 48"Max with a max spacing of 60" Anchor Spacin SolarMount Rail s Staggered Attachment Detail T Rail S lice Detail 3 NTS NTS X °o C3 PV Module m Roof Framing WEEBLug SS Washer UniRac L-Foot w/ z Unistrut Sub ;; ;; ;; Ground Wire &Nut Q Unistrut Spring Nuts Rail ;; ;; Unirac Rail t SS Bolt it t Anchors located 0 on alternate roof framing members SS FlatE SolarMount Rail Washer SS Bolt VARIES 48" Max Anchor Spacin DETAILS Sub-Structure Attachment Detail Groundin Lu & Rail 5 Not to Scale V Scale: N.T.S. PV-A03 FOR CONSTRUCTION PV ARRAY 1 - MECHANICAL LOADS \ Array Area: 518.1 ft- Total Photovoltaic Dead Load: 3.34 psf Array Weight: 1731.0 Ibs Avg. Dead Load per Anchor: 24.0 Ibs Anchor Qty.: 72 32 Taugwonk Spur,Al2 Design Values by Roof Zone: Corner Egde Interior Stonginton,CT 06378 Max. UniRac Rail Span: 60 in. O.C. 60 in. O.C. 60 in. O.C. Phone s3 Fax(4113}3)683-2225 Max. UniRac Rail Cantilever: 20 in. ...O.C. 20 in. O.C. 20 in. O.C. Adjusted Anchor Span: 48 in. O.C. 48 in. O.C. 48 in. O.C. GRID-TIED ........................... ........................... I.......................... PHOTOVOLTAIC SYSTEM Downforce Point Load: 379.0 lbs 379.0 Ibs 379.0 Ibs ........................... ........................... ....................... Uplift Point Load: -353.2 Ibs -231.1 Ibs -122.2 Ibs 7.7001kW DC @ STC Minimum Anchor Strength: 707 lbs SIDOTI, MIKE Average Safety Factor: 4.53 VERTICAL RAILS AND 56 W PARSONS LN. UNISTRUT SUB-STRUCTURE FLORENCE, MA 01062 REQUIRED FOR ALL Project# 10215077 LANDSCAPE MODULES DESIGNER: DKN 40'-7" ((** REVIEWER: CR VERSION DATE. 2014-09-19 -10" REVISIONS 33'-5" # By Date Notes z -_lam �__ -.A k E 3 3-3„ 4 - — _ 5 1 a F= A { I � 15'-5" +-----'*------------ --- -- *------r---- ----j'— —�-----+-- -�----- �- f i d ----+F-- ---*----- -------------- °----� --- — —a: — — ^+-----+ d m LL z 37' Q Total Quantity of Attachments=72 Roof Zones are defined by dimension, a= 3.0 ft. Maximum Allowable Cantilever for UniRac Rail is Y3 the Maximum Rail Span Racking and Attachment: UniRac SolarMount with Eco-Fasten Green-Fasten with CP-SQ-Slotted Bracket and Aluminum Flashing attached with 5/16"x 3-1/2" Lag Bolt, Hex Head, 18-8 SSs °A E 3116"= 1"-0" All Dimensions shown are to module edges, including 1 in. Spacing between Modules required when using the Top Clamp Method. The Rails Extend 3 in. Beyond the module edge. N MODULE LAYOUT UniRac Requires one thermal expansion gap for every run of rail greater than 40' Array Installed according to the UniRac SolarMount Code-Compliant Installation Manual ver. 227.3, W Pub 110616-1cc,June 2011 E Attachment Locations, If shown, are approximate. Final adjustment of attachment location may be PV-A02 necessary depending on field conditions.All attachments are staggered amongst the framing members. S FOR CONSTRUCTION Equipment Location: Exterior R -,S r =t (E) Utilty Mete (E)Single Family Dwelling Equipment Location: Interior (E) Main Service Panel- POI (N) PV Production Meter/Monitor 32 Taugwonk Spur,Al2 (N) PV AC Combiner Panel Stonginton,CT 06378 Phone(860)535-3370 •. Fax(413)683-2225 .• • GRID-TIED A SYSTEM j: •; ° 7.700kW DC @ STC SIDOTI, MIKE . d .....•• _ 56 W PARSONS LN. : . :L.•. °.�, '.,'a�' __ - - 1- FLORENCE, MA 01062 � Project# 10215077 ♦ d: . ♦ • ,♦ .� d'• d DESIGNER: DKN ♦ .. ..,.. _— — - — REVIEWER - R EVIEWER CR AA A • . ♦; VERSION DATE. 2014-09-19 • ♦ •• •. • REVISIONS ... °. •: • ' •, . • # By Date Notes 2 �'.. "A•. i 3 d' (N) PV Array ,a 4 •' •. 28 Solarworld Plus SW 275 Mono Black Modules 28 Enphase Energy M250-60-2LL-S22 Micro-Inverters 151 _:,•a'.. •' Asphalt/Comp. Shingle Roof : 2"X 8" Rafters @ 16"O.C. Pitch:24° ° Azimuth:175' (E) Driveway •: ° ' t , h e 0 .4. y .i• A Q ' AA • 4 o d ♦. 1/16"= 1'-0" ♦' d : .. rr SITE PLAN W Parsons Ln W E S PV-A01 090 IA VW 'U01 we1410N FOR CONSTRUCTION seen$u!ey�ZlZ Grid-Tied Photovoltaic System WOU4,lEdeu6uuip!!% G DC Rating: I oldwi UON 10 !0. 7700 kW I QS' � Sidoti, Mike 32 Taugwonk Spur,Al2 56 W Parsons Ln. Stonginton,CT 06378 Florence, MA 01062 Phone 53 Fax(4113)3)683-22225 225 Jurisdiction: City of Northampton GRID-TIED Sheet List PHOTOVOLTAIC SYSTEM Sheet No. Sheet Title 7.700kW DC @ STC Scope of Work: General Notes: PV-000 COVER SIDOTI, MIKE RGS Energy shall install a 7.700 kW Grid-tied Photovoltaic("PV") System 1. System follows any/all Fire Code Setbacks per Ordinances of the City PV-A01 SITE PLAN 56 W PARSONS LN. totaling(28)Solarworld Plus SW 275 Mono Black Modules with(28) Enphase Of Northampton. FLORENCE, MA 01062 Energy M250-60-2LL-S22 Micro- Inverter(s). The Modules shall be flush 2. All projects will comply with the Ordinances of the City of PV-A02 MODULE LAYOUT Project# 10215077 mounted on the asphalt/comp. shingle roof and interconnected via load side Northampton. PV-A03 DETAILS DESIGNER: DKN breaker connection. 3. Construction Hours: 7am-8pm Monday-Friday, 9am-8pm Saturday, No time on Sunday or legal Holidays. PV-A04 MATERIALS REVIEWER: CR 4. Product Data Sheets shall be included. PV-E01 ELECTRICAL DIAGRAM VERSION DATE 2014-09-19 Equipment Specifications: 5. Rooftop penetrations shall be completed and sealed per code by a Module: (28)Solarworld Plus SW 275 Mono Black licensed contractor. PV-E02 SYSTEM CALCS REVISIONS Inverter 1: (28)Enphase Energy M250-60-2LL-S22 6. All Photovoltaic modules shall be tested and listed by a recognized # By Date Notes Racking: UniRac ShcarMount laboratory. PV-G01 SIGNAGE Attachment Flushing: Eco-Fasten Green-Fasten with 7. Certifications shall include UL1703, IEC61646, IEC61730. CP-SQ-Slotted Bracket and Aluminum Flashing 8. A continuous ground shall be provided for the Array and for all 2 Photovoltaic Equipment. 3 9. DC Wiring shall be run in metal conduit or raceways within enclosed 4 Roof Specifications: spaces in a building. Roof 1: 10. Conduit,Wire systems and Raceways shall be located as close as s Asphalt/Comp. Shingle possible to ridges, hips, and outside walls. 2((Single Layer) 11. Conduit between Sub Arrays and to DC Combiners/Disconnects shall x 8" Rafters 16" use guidelines that minimize the total amount of conduit by taking the O.C. shortest path. Pitch: 24° 1 Azimuth: 175° 12. Space Requirements for electrical equipment shall comply with NEC Array Size: 28 Modules Article 110. 13. Equipment grounding shall be sized in accordance with Table Site Specifications: 250.122. 14. Connectors that are not readily accessible and that are used in the Occupancy: II circuits operating at or over 30V AC or DC shall require a tool for Design Wind'Speed: 90 MPH g opening and are required to be marked"Do not disconnect under Exposure Category: B load"or"Not for current interrupting", per 690.33(c)&(e). Mean Roof Height; 25 ft 15. All signage to be placed in accordance with local building code. Ground Snow Load: 40 PSF (Reducible) 16. Signs or Directories shall be attached to the electrical equipment or Adj. Roof Snow Load: 30.8 PSF located adjacent to the identified equipment. N 17. Signs should be of sufficient durability to withstand the environment. ° All Work to be in Compliance with: 18. Any plaques shall be metal or plastic with engraved or machine 2014 National Electrical Code(NEC) printed letters, or electro-plating, in a red background with white " 2009 International Residential Code(IRC) lettering, a minimum of 3/8"height and all capital letters. { 2009 International Building Code(IBC) 2012 International Fire Code(IFC) 2012 Uniform Mechanical Code(UMC) N ° 2012 Uniform Plumbing Code(UPC) MA 780 CMR,8th Edition -including 211 revisions to Tables R301.2(4)&R301.2(5) € 4 E N/A 14/ ASCE/ANSI 7-05 Minimum Design Loads for Buildings and Other � � Structures COVER As amended and adopted by City of Northampton g SF f ° 3 GREENFASTEN'"" PRODUCT GUIDE - GF-1 z ,I F American Wood Council Lag Bolt Pull-Out Values e Lag pull-out (withdrawal) capacities (lbs) in typical roof lumber (ASD) " Lag screw specifications . ' Specific t 5/16"shaft* Gravity per inch thread depth Douglas Fir,Larch .50 266 Douglas Fir,South .46 235 3 Engelmann Spruce,lodgepole Pine .46 235 (MSR 1650 f&higher) ` Hem,Fir,Redwod (close grain) .43 212 Hem,Fir(North) .46 235 Southern Pine 55 307 Thread y Depth o Spruce,Pine,Fir .42 205 v Spruce,Pine,Fir .50 266 " (E of 2 million PSI and higher grades of MSR and MEL) y Ln Ln co ul 5 t � R co xt e ro w � O _ . Sec.6-1 `1 twv Nk GREENFASTEN TI PRODUCT GUIDE - GF-I Specifications PART I -GENERAL 1.3 SUBMITTAL B. Fasteners (may be supplied by others)to be ! A. Submit manufacturer's written specifications. compatible with chosen roof application and {& I.I SUMMARY B. Submit standard product cut sheets. meet specified pull out values as shown in load ff A. WORK INCLUDES test data. 41 ; C. Submit installation instructions. 1. GreenFasten solar attachment bracket that * D. Submit product specific load test data,showing C. Base flashing is.032 gauge aluminum embossed attaches directly to the roof deck. }� ultimate and allowable load values. to accept EPDM bushing. 2. Provide appropriate bracket and fasteners p i for the roof system. D. Bushing is EPDM. 1.4 QUALITYASSURANCE f B. RELATED SECTIONS Installer to be experienced in the installation of E. Stainless steel bonded washer is 302 stainless I.Section 07600:Flashing and Sheet Metal specified roofing material and snowguards for no less and EPDM. 2.Section 07500:Roofing than 5 years in the area of the project. s 3.Division I:Administrative and procedural 2.3 FINISH-Mill Finish requirements 1.5 DELIVERY/STORAGE/HANDLING A. Bracket is mill finish aluminum 4.Division7:Thermal and Moisture Protection Inspect material upon delivery.Notify manufacturer = a ; B. Base flashing (choose one) it} within 24 hours of any missing or defective items.Keep 1.2 SYSTEM DESCRIPTION � material dry,covered,and off the ground until installed. I.Mill Finish A. COMPONENTS: +� w cons 1. GreenFasten system consists of aluminum 2.Black-kynar painted v y PART 2 - PRODUCTS flashing with integral EPDM bushing and one 3.Dark Bronze kynar painted 3 bonded stainless steel and EPDM washer. v 2.1 MANUFACTURER 2. Fasteners EcoFasten Solar° PART 3 - EXECUTION A.To be of metal compatible with aluminum 289 Harrel St.Morrisville,VT 05661 GreenFasten components. (877) 859-3947 3.1 EXAMINATION B.Fasteners should be selected for www.ecofastensolar.com. A. Substrate:Inspect structure on which brackets compatibility with the roof deck. - t # v are to be installed and verify that it will withstand tw C.Fastener strength should exceed or be equal 2.2- MATERIALS any additional loading that it may incurred.Notify 4 g to that of the allowable load of the system. A. Attachment Bracket General Contractor of any deficiencies before 4 See test data at www.ecofastensolar.com r fJ v 6000 Series Aluminum (choose one) installing EcoFasten Solar brackets. 3. Sealant(if required by roof manufacturer): E B. Verify that roofing material has been installed �} E to be roof manufacturer approved. I. F- F o correctly prior to installing solar attachment brackets. v 2. L-101-3" 4. Aluminum attachment bracket t 3. L-102-3" r B. DESIGN REQUIREMENTS: 4. CP-R 3.2 INSTALLATION 5. CP-S A. Comply with architectural drawings and . Bracket spacing to be recommended by Q project engineer's recommendations for location project engineer. 6. SL 102-6- P'ro en g -71-7 " 00 2. Install a minimum of one fastener assembly 7. 7-101 of system.Comply with Manufacturer's written 3. It is important to design new structures or 8. Custom installation instructions for installation and layout. '�# ) o assess existing structures to make sure that they can withstand retained loads. v 1. O V Lij Sec.5-1 fE�! ? 1 GREENFASTENT" PRODUCT GUIDE — GF-I Bracket Options - CP-SQ b 4S � � r .375-.008 O pia� � v -� 2.000 .025 — w Q, g% Z u 2 -{- .000_.025 1 E 3.3 ! yg3 fi U rn t co s , Y .371 ,010 1 HRU Ln .875 .010 X 82 NEAR SID E 'S4A (C It L Q Compression Plate 2" X 2" Mill Aluminum Sec.4-4 °#$3 i Rey GREENFASTEN ' PRODUCT GUIDE - GF-I 1 GF I- L 812 f rye }, � f 4, f t '4 8.00U- .005 --�.- R,38 •- .032 {{[[ 3 K L i KiW 88 .01 a X. .30-.011 12.00.7 .1 25 } g� : - 3.00 - .125 4.00- ':.125 - F- ►- '1b' - 01 .. - .L _ .0 r � Ln co co co N a Finish Options o BLK= Matte Black u BRZ= Medium Bronze MLL= Mill Finish Sec.4-2 im ((( GREENFASTEN T11 PRODUCT GUIDE - GF-I Exploded Product View q , V IF �v V 3 Jg, w $ ` N F A � �►° c .. o `° x IN co MM°: I '` .;=s O vn -A s C rs *Note:Numbers correspond with B.O.M,Sec.3-1 Secl -I b 4 4 r TM ee, te, PRODUCT GUIDE 0 1 R', { r '} Gteetlf3Sten GF- Contents (tided roductView�-Sec. 1 § 'q: $ �1 lr if bn 'I st u A J{ G/\r1.1 L.. Bill of Materials—Sec.3 t a :✓ LAshee s Sec. �f { .d t S.r 0e0 IC4 IbC1S—S& rJ j 3 l fag Bolt.PUII-0utValue -�5ec.6 A ; a F �. #+,gy Lea(cTest'Sec. ! $kr � r fi l S a s i i- `4 1 - t } # S F ., t'1 Sol are A - g F 5 Camjnitted Eo the Support of Renewable Energy ::8UNIRAC . . . - . . . . - - SolarMount Beams Part No. 310132C, 310132C-B, 310168C, 310168C-B, 310168D 310208C, 310208C-B, 310240C,310240C-B, 310240D, 410144M, 410168M, 410204M,410240M Properties Units SolarMount SolarMount HD Beam Height in 2.5 3.0 Approximate Weight(per linear ft) plf 0.811 1.271 Total Cross Sectional Area in 0.676 1.059 Section Modulus(X-Axis) in3 0.353 0.898 Section Modulus(Y Axis) in 0.113 0.221 Moment of Inertia(X-Axis) in 0.464 1.450 Moment of Inertia(Y Axis) in 0.044 0.267 Radius of Gyration(X-Axis) in 0.289 1.170 Radius of Gyration(Y Axis) in 0.254 0.502 SLOT FOR T-BOLT OR 1.728 SLOT FOR T-BOLT OR 14" HEX HEAD SCREW %"HEX HEAD SCREW-7 2X SLOT FOR SLOT FOR L.A BOTTOM CLIP 2.500 BOTTOM CLIP rh 3.000 SLOT FOR T A01" HEX BOLT 3/8 SLOT FOR 1.385 3/8" HEX BOLT .387.75 1.207 Y Y 1.875 A ►X w SolarMount Beam SolarMount HD Beam Dimensions specified in inches unless noted SolarMount Beam Connection Hardware SolarMount L-Foot Part No. 304000C, 304000D • L-Foot material: One of the following extruded aluminum alloys:6005- T5,6105-T5,6061-T6 • Ultimate tensile: 38ksi,Yield: 35 ksi • Finish: Clear or Dark Anodized • L-Foot weight:varies based on height:-0.215 Ibs(98g) • Allowable and design loads are valid when components are Bea assembled with SolarMount series beams according to authorized Bolt UNIRAC documents L-Foot For the beam to L-Foot connection: •Assemble with one ASTM F593 W-16 hex head screw and one errated ASTM F594'/a'serrated flange nut Flange Nu •Use anti-seize and tighten to 30 ft-Ibs of torque • Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third-party test Y results from an IAS accredited laboratory NOTE: Loads are given for the L-Foot to beam connection only; be ~X sure to check load limits for standoff, lag screw,or other attachment method Applied Load Average Safety Design Resistance sxva,rcc.a Direction Ultimate Allowable Load Factor Load Factor, `Ne`6t Ibs(N) Ibs(N) FS Ibs(N) cp Sliding,Z+ 1766 7856 755 3356 2.34 1141 5077 0.646 Tension,Y+ 1859(8269) 707(3144) , 2.63 1069(4755) 0.575 Dimensions specified in inches unless noted Compression,Y- 3258(14492) 1 1325(5893) 2.46 1 2004(8913) 1 0.615 Traverse,X± 1 486(2162) 213(949) 1 2.28 323(1436) 1 0.664 - , . . . - - . UNIRAC SolarMount Mid Clamp Part No.302101 C,302101 D,302103C,302104D, 302105D,302106D • Mid clamp material: One of the following extruded aluminum rra Bolt Mid alloys:6005-T5, 6105-T5, 6061-T6 la a Nu Clamp Ultimate tensile: 38ksi,Yield: 35 ksi Finish: Clear or Dark Anodized Mid clamp weight: 0.050 Ibs(23g) ~` Allowable and design loads are valid when components are assembled according to authorized UNIRAC documents Values represent the allowable and design load capacity of a single mid clamp assembly when used with a SolarMount series beam to retain a module in the direction indicated • Assemble mid clamp with one Unirac'/4"-20 T-bolt and one'/4"-20 ASTM F594 serrated flange nut Beam Use anti-seize and tighten to 10 ft-Ibs of torque • Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- party test results from an IAS accredited laboratory Applied Load Average Allowable Safety Design Resistance 3-00DTAKt Direction Ultimate Load Factor, Load Factor, wrwfeN MOMS �' Ibs(N) Ibs(N) FS Ibs(N) 0 Tension,Y+ 2020(8987) 891 (3963) 2.27 1348(5994) 0.667 - -- - Transverse,Z± 520(2313) 229(1017) 2.27 346(1539) 0.665 Y Sliding,X± 1194(5312) 1 490(2179) 1 2.44 1 741 (3295) 0.620 W Dimensions specified in inches unless noted SolarMount End Clamp Part No.302001C,302002C,302002D,302003C, 302003D,302004C,302004D,302005C,302005D, 302006C,302006D,302007D,302008C,302008D, 302009C,302009D,302010C,302011C,302012C End clamp material: One of the following extruded aluminum r o alloys:6005-T5, 6105-T5, 6061-T6 ft Ultimate tensile: 38ksi,Yield:35 ksi !rag 0 Finish: Clear or Dark Anodized • End clamp weight:varies based on height: —0.058 Ibs (26g) �.►' r'"� d Clamp Allowable and design loads are valid when components are ✓'` Serrated assembled according to authorized UNIRAC documents Flange Nut Values represent the allowable and design load capacity of a single end clamp assembly when used with a SolarMount series beam to retain a module in the direction indicated • Assemble with one Unirac'/4"-20 T-bolt and one'/4"-20 ASTM F594 Bea serrated flange nut — Use anti-seize and tighten to 10 ft-Ibs of torque Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- Y party test results from an IAS accredited laboratory A Modules must be installed at least 1.5 in from either end of a beam ►X Applied Load Average Allowable Safety Design Resistance Direction Ultimate Load Factor, Loads Factor, Ibs(N) Ibs(N) FS Ibs(N) m W� Tension,Y+ 1321 (5876) 529(2352) 2.50 800(3557) 0.605 r+oomn.c T"CC"O Transverse,Z± 63(279) 14(61) 4.58 21 (92) 0.330 Dimensions specified in inches unless-Hated Sliding,X± 142(630) 1 52(231) 2.72 1 79(349) 1 0.555 a own . . . - . . . . - - SolarMount Technical Datasheet Pub 110818-ltd V1.0 August 2011 SolarMount Module Connection Hardware.................................................................. 1 BottomUp Module Clip.................................................................................................1 MidClamp ....................................................................................................................2 EndClamp....................................................................................................................2 SolarMount Beam Connection Hardware......................................................................3 L-Foot...........................................................................................................................3 SolarMountBeams..........................................................................................................4 SolarMount Module Connection Hardware SolarMount Bottom Up Module Clip Part No. 302000C Washer Bottom Up Clip material: One of the following extruded aluminum Bottom ut (hidden..s alloys:6005-T5, 6105-T5, 6061-T6 UPC no Ultimate tensile: 38ksi,Yield: 35 ksi Finish: Clear Anodized • Bottom Up Clip weight:—0.031 Ibs(14g) Beam 1- olt Allowable and design loads are valid when components are assembled with SolarMount series beams according to authorized UNIRAC documents Assemble with one%"-20 ASTM F593 bolt, one'/<"-20 ASTM F594 serrated flange nut, and one%"flat washer e Use anti-seize and tighten to 10 ft-Ibs of torque Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- - `— party test results from an IAS accredited laboratory • Module edge must be fully supported by the beam * NOTE ON WASHER: Install washer on bolt head side of assembly. DO NOT install washer under serrated flange nut Applied Load Average Allowable Safety Design Resistance Direction Ultimate Load Factor, Load Factor, r r Ibs(N) Ibs(N) FS Ibs(N) m t '24 Tension,Y+ 1566(6967) 686(3052) 2.28 1038(4615) 0.662 Y r Transverse,X± 1128(5019) 329(1463) 3.43 497(2213) 0.441 G Sliding,Z± ) 66 292 27(119) 2.44 41 (181) 0.619 ( Dimensions specified in inches unless noted a Sunmodule;,IplusSW275monoblack PERFORMANCE UNDER STANDARD TEST CONDITIONS(STC)' PERFORMANCE AT 800 W/m',NOCT,AM 1.5 Maximum power Pl,, 275 Wp Maximum power P11- 203.1 Wp Open circuit voltage V 39.4 V Open circuit voltage V 35.7 V Maximum power point voltage V 31.0 V Maximum power point voltage V 281 V Short circuit current I m 9.58A Short circuit current I 7.75 A Maximum power point current lumv 8.94A Maximum power point current 7.22 A 'sTC 1000 W/oP,2S"C AM M, Minor reduction in efficiency under partial load conditions at 25'C at 200 W/m',100% 1)M(.aswing tolerar'ice(1;,,,,)traceable toltlV Rheinland:+/-26(TOV Power Controlled). (+/-2%)of the STC efficiency(1000 W/m')is achieved. THERMAL CHARACTERISTICS COMPONENT MATERIALS Cells per module 60 NOCT 48'C Cep type Mono crystalline TC 1 0.04%/'C Cell dimensions 6.14 in x 6.14 in(156 mm x 156 mm) TCvo, -0.30%/°C Front Tempered glass(EN 12150) TCP -0.45%/-C Frame Black anodized aluminum Operating temperature -40°C to 85'C Weight 46.7 Ibs(21.2 kg) SYSTEM INTEGRATION PARAMETERS 1000 W/m' Maximum system voltage SC 11 1000 V - Max.system voltage USA NEC 600 V 800 W/ms. Maximum reverse current 16 A -- Number of bypass diodes 3 g 600 W/mz 113 psf downward UL Design Loads' Two rail system 64 psf upward 400 W/m2 170 psf downward 75 UL Design Loads' Three rail system 64 psf upward f - 200 W/mz 113 psf downward IEC Design Loads` Two rail system 100 W/m2 50 psf upward 'Please referto the Sunmodule installation instructions forthe details associated with .... ..,.__ _._- __. .-....... .. these load cases. Module wltage[V] V« ADDITIONAL DATA J--x4 37.44(951)- Powersorting' O Wp/+5 Wp 1-Box IP65 Module leads PV wire per UL4703 with MC4 connectors 11.33(288) Module efficiency 16,10% Fire rating(UL 790) Class C Glass Low iron tempered with ARC 41.30(1050) Version 0.6 15.3 2.5 t VERSION 2.5 FRAME 65.94(1675) bottom orn mounting Compatible with both"Top-Down" holes and"Bottom"mounting methods N Jr Grounding Locations: N 4 corners of the frame D 4locations along the length of the module in the extended flanget 1.34 34 x4 T4.20(107)1 1.22(31) 39.41(1001) -1 fAll units provided are imperial.SI units provided in parentheses. SolarWorld AG reserves the right to make specification changes without notice, SW-01-6025US 02-2014 a vi Y r 4,,a .� r�s ,< r � a�i� ,�..✓ y5ryx + a r ti �r h s s ynsmS�F A� � �'^G✓d� t 6y 1 ,s;� g"T"W" ,RIM e .r x s A& i TUV Power controlled: a ToVHh.1M d# Lowest measuring tolerance in industry e ���00000�°,A, w Every component is tested to meet 3 times IEC requirements J Designed to withstand heavy accumulations of snow and ice J Sunmodule Plus: Positive performance tolerance J 25-year linear performance warranty and 10-year product warranty J Glass with anti-reflective coating World-class quality Q.OfMd.MC 61213 + a •nn mono n.umn s •8a/a!y t*aled,:..3113p Fully-automated production lines and seamless monitoring of the process and material p�E r,4dk,n.�.a,. 3$g •oednd,c hiepmcdnn •Blowlnp sa,M realelant fj rt;vn._..�e�q Rowa,fmlrollwrl ensure the quality that the company sets as its benchmark for its sites worldwide. SolarWorld Plus-Sorting PFRFpRMANCF.TFS 0 Plus-Sorting guarantees highest system efficiency.SolarWorld only delivers modules that �" M�TRE3'STA"T P�iOTOVOITAiC PRODt)CT C US have greater than or equal to the nameplate rated power. Ut-1703 25 years linear performance guarantee and extension of product warranty to 10 years IS014001 SolarWorld guarantees a maximum performance degression of 0.7%p.a.in the course of C E FE-11 L Certified Ai 25years,a significant added value compared to the two-phase warranties common in the industry.In addition,SolarWorld is offering a product warranty,which has been extended to 10 years.* *in accordance with the applicable SolarWorld Limited Warranty at purchase. www.solarworld.com/warranty SOLARWORLD 11-._� solarworld.com We turn sunlight into power. September 10, 2014 To: Code Enforcement Division From: James A. Marx, Jr. P.E. Re: Engineer Statement for Sidoti Residence, 56 W Parsons Ln., Florence, MA - Solar Roof Mount Installation I have verified the adequacy and structural integrity of the existing Main Roof 1 (one layer shingles): 2" x 8" rafters at 24" c-c., having roof slope distance approx. 15'-5" with rafter span 13'-0", pitch 24 deg.; for mounting of solar panels and their installation will satisfy the structural roof framing design-loading requirements of the Massachusetts building code—780 CMR Residential Code 8th Ed. For the installation of the solar mounting, the Unirac Solarmount rails will be anchored to the rafters with L-foot supports with Eco-Fasten Green-Fasten and CP-SQ Bracket located on the center of the rafters and will be securely fastened to the rafters at 48" max. sp. with 5/16"x 3 1/2" SS lag bolts. The mounting system has been designed for wind speed criteria of 90 mph Exp. B and ground snow criteria of 40 psf. All attachments are staggered amongst framing members. The Photovoltaic system and the mounting assemblies will comply with the applicable sections of the Residential Code and loading requirements of roof-mounted collectors. Thereby, I endorse the solar panel installation and certify this design to be structurally adequate. Sincerely, C1 James A. Marx, Jr. c� Professional Engineer MA 36365 Q, 10 High Mountain Road Ringwood,NJ 07456 cc: RGS Energy RGS Clean P.—,Bright Savings. Property Owner Consent Form Owner: 1' ,Kt. Address: 5 � \,J, Rrs a,s L,) Town: r1ur.l.A C.k State: ALA Zip: a ( 06 ? Phone: Y (3 5 Cl/ 6 9�,-o I hereby give permission to RGS Energy and their representatives to pull the required permits for a solar installation on my property. A 2 Property ner Date 32'I augwonk Spur.A 12,Stonington,CT 06378 tcl.860 535.3370 fax 413.683.2225 The Commonwealth of Massachusetts Department of'Industrial Accidents Office of-Investigations 600 Washington Street QV Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual): Alteris Renewables, Inc. dba RGS Energy Address: 32 Taugwonk Spur, Unit A-12 City/State/Zip: Stonington, CT 06378 Phone #: (860)535-3370 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 120 4. ❑ I am a general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. t 2• ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. workers' comp. insurance. 9. ❑Building addition [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4),and we have no 12.❑Roof repairs insurance required.] t employees. [No workers' 13.0 Other solar panels comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. 1 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and.job site information. Insurance Company Name: Zurich American Insurance Co. _ Policy#or Self-ins. Lic.#: WC5852405 Expiration Date: 01/01/2015 Job Site Address: 56 W Parsons Lane City/State/Zip: Florence, MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify nder he pains and penalties of perjury that the information provided above is true and correct. Si=nature: v�-'LX Date: Zle Phone#: (860) 535-3370 Of Fcial use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 7 8.1 Licensed Construction Supervisor: Not Applicable ❑ N_ame of License Holder Gary Beals 101487 License Number 61 urnpike Road,Ashby, MA 01431 11/7/14 Addr44 Expiration Date 978-855-8568 Signatur Telephone 8.Restlstered Home improvement Contractor: Not Applicable ❑ Alteris Renewables dba RGS Energy 162709 Company Name Registration Number 32 Taugwonk Spur,A-12, Stonington,CT 06378 4/6/15 Addr s Expiration Date 0 ZQ Telephone 860-535-3370 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 0 No...... ❑ 11. - Home Owner Exemution The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House F—] Addition F-1 Replacement Windows Alteration(s) EJ Roofing El Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [[:J Siding[0] Other[0] solar Brief Description of Proposed Work: Installation of a TAW roof mounted solar­,,y using 28 SolarWorld SW275 Mono modules.2R Lnphasc M250-60-21,1--S22 micro inverters&all associalcd cicct,ic;d wo k' Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x _No Plans Attached Roll -Sheet 6a, If New house and or addition to existing housina, complete the following: a. Use of building :One Family X Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes X No. Is construction within 100 yr. floodplain Yes X No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? X Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Mike Sidoti as Owner of the subject property hereby authorize Alteris Renewables dba RGS Energy to act on my behalf,in all matters relative to work authorized by this building permit application. see signed authorization form attached q12 Signature of Owner ate Alteris Renewables dba RGS Energy as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Kim Hendel Print Na e 1 �/ Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DON'T KNOW Q YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW O YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Cady Department only SEp 3 Q 20 City of Northampton Statusa#Pamli Building Department Ctt1a`c)ttttivewy l~'erratt Gas lnspeM 212 Main Street Sersy - Electric,plumbing MA 01060 Northampton, Room 100 1atptel( �t ' Northampton, MA 01060 Twatof.; t1< n ` phone 413-587-1240 Fax 413-587-1272 � l Qthrst rr�„� APPLICATION TO CONSTRUCT,ALTER,REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 56 W Parsons Lane Map Lot Unit Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Mike Sidoti 56 W Parsons Lane, Florence, MA 01062 Name(Print) Current Mailing Address: see signed authorization form attached 413-341-6980 Telephone Signature 2.2 Authorized Agent: Alteris Renewables dba 't-6 I 32 Taugwonk Spur,A-12,Stonington, CT 06378 Name(Print) 1 Current Mailing Address: 860-535-3370 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 7,000 (a)Building Permit Fee 2. Electrical 26,000 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) 33,000 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date File# BP-2015-0367 APPLICANT/CONTACT PERSON REAL GOODS SOLAR INC ADDRESS/PHONE 32 TAUGWONK SPUR RD UNIT Al2 STONINGTON (860)535-3370 Q PROPERTY LOCATION 56 WEST PARSONS LN MAP 35 PARCEL 261 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildin Permit Filled out Fee Paid Typeof Construction: INSTALL 7.7KW ROOF MOUNTED SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 101487 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORM ION PRESENTED: proved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay �{ S tgff atu Buildi g 6 fficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 56 WEST PARSONS LN BP-2015-0367 GIs COMMONWEALTH OF MASSACHUSETTS M i Block: 35 -261 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL e.142A) Cate-ory: SOLAR PANELS BUILDING PERMIT Permit# BP-2015-0367 Project# JS-2015-000663 Est. Cost: $33000.00 Fee: .S 198.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: REAL GOODS SOLAR INC 101487 Lot Size(sq. ft.): 46609.20 Owner: O'REILLY JOHN &PATRICIA ANN R Zo 11 lngL Applicant: REAL GOODS SOLAR INC AT. 56 WEST PARSONS LN Applicant Address: Phone: Insurance: 32 "T'AUGWONK SPUR RD UNIT Al2 (860) 535-3370 0 Workers Compensation STONINGTONCT06378 ISSUED ON.101212014 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL 7.7KW ROOF MOUNTED SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: Fee"Type: Date Paid: Amount: Building 10/2/2014 0:00:00 $198.00 212 Main Street, Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner