Loading...
24C-019 (8) Planning - Decision City of Northampton Hearing No.: PLN-2014-0049 Date: May 30, 2014 approved by the Northampton DPW. Such measures must be implemented during construction. 6. The southerly Massasoit Street Parking Lot gate shall only be open for buses or trucks and when a YMCA staff person is standing at the gate to open and shut the gate for such vehicles. 7. The driveway with at the Massasoit Street Parking Lot entrance shall be no wider than 24 feet wide where it crosses the city's right-of-way, with a wider flare at the intersection with the road,with the southerly side of the driveway lined up with the southerly side of Fifth Avenue. 8. With the narrower parking lot driveway,the Massasoit Street crosswalk shall be moved as far south as possible on the north side of Fifth Avenue. 9.Prior to any other work shown on the site plans,the upper roots of the specimen tree at the northeast corner of Massasoit/Fifth shall be exposed in accordance with the Arborist's recommendations.If the roots are within the thresholds recommended by the Arborist,the work can proceed. If the tree would be damaged,based on the Arborlst's recommendation,then field changes may be approved by the Director of Planning and Sustainability. 10. Crosswalk details and advance signage,including warning triangles and signage,shall be in compliance with DPW standard crosswalk details and shall be installed by the applicant. 11. The articulated concrete peninsula within the parking lot shall be replaced with pavement markings including a striped line on the westerly half of the parking lot exit and the words"Do Not Enter." These lines and words shall be maintained and replaced by the YMCA to maintain high visibility. 12. The areas where no parking is allowed within the parking lane on the northeasterly side of the new Massasoit Street crosswalk,the southerly side Prospect Street immediately west of Massasoit Street and the area adjacent to the rear parking lot entrance shall be painted with striped lines symbolizing FINDINGS: Planning Board voted'to approve the site plan for the YMCA at 286 Prospect Street(Map ID 24C-19)for a new parking lot on Prospect Street site improvements to and adjacent to the YMCA's Massasoit Street Parking Lot and other related site work as indicated above. The Board found that the criteria in section 11.6 had been met A)The requested use protects adjoining premises against seriously detrimental uses. The use is not changing,but the additional parking lot access and changes will improve conditions. Additional landscaping will be added to buffer the parking lot along Massasoit St, the additional parking will also alleviate pressures of parking on-street in the vicinity. B. The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets. The main parking lot entry driveway will be reduced in width to 24'and a crosswalk across Massasoit will be added to address pedestrian safety at this access and assist in slowing vehicular traffic. A secondary access to the large lot will be restricted to bus use only during the summer time and alleviate safety hazards. (3)Access by nonmotorized means is being accommodated with existing facilities such as bike racks,sidewalk connections from the building to the street. C. The site will function harmoniously in relation to other structures and open spaces to the natural landscape,existing buildings and other community assets in the area as it relates to landscaping,drainage,sight lines,building orientation,massing, egress,and setbacks.. D. The requested use will not overload,and will mitigate adverse impacts on,the City's resources,including the effect on the City's water supply and distribution system,sanitary and storm sewage collection and treatment systems,fire protection,streets and schools. F. Compliance with the following technical performance standards: (1) Curb cuts onto streets shall be minimized and maintained as existing from side streets. (2) Pedestrian,bicycle and vehicular traffic movement on site must be separated,to the extent possible. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 51112014 511512014 61512014 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 51812014 81212014 512212014 61512014 611912014 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 51812014 5122/2014 512212014 513012014 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 511512014 812012014 8/20/2014 MEMBERS PRESENT: VOTE: Alan Verson votes to Grant Dan Felten votes to Grant John Lutz votes to Grant Debin Bruce votes to Grant GeoTMS®2014 Des Lauriers Municipal Solutions,Inc. Planning - Decision City of Northampton Hearing No.: PLN-2014-0049 Date: May 29, 2014 APPLICATION TYPE: SUBMISSION DATE: I I IIIIIIII III II PB Major Site Plan 512912014 IIIIIIIIIII 1111111 II I II IIIIIIIIIII Applicant's Name: Owner's Name: 2014 000112 NAME: NAME: Bk: 11684Pg: 182 Page: 1 of 3 HAMPSHIRE REGIONAL YMCA HAMPSHIRE REGIONAL YOUNG MEN'S CHRI Recorded: 07/01/2014 11:46 AM ADDRESS: ADDRESS: 286 PROSPECT ST 286 PROSPECT ST TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: NORTHAMPTON MA 01060 NORTHAMPTON MA 01060 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: 413 584-7086 EMAIL ADDRESS: EMAIL ADDRESS: Site Information: Surveyor's Name: STREET NO.: J SITE ZONING: COMPANY NAME: 286 PROSPECT ST URB(85)1URA(15)1 TOWN: ACTION TAKEN: ADDRESS: NORTHAMPTON MA 01060 Approved With Conditions MAP: BLOCK: LOT: MAP DATE: SECTION OF BYLAW: 24C 019 001 Chpt.350-'11:Site Plan Approval TOWN: STATE: ZIP CODE: Book: Page: 1455 079 PHONE NO.: FAX NO.: EMAIL : '� ADDRESS ; % I,I I�-�; � NATURE OF PROPOSED WORK: ZPA- ADD 25 EMPLOYEE PARKING SPACES { HARDSHIP: I+� l MAY 3 0 2014 CONDITION OF APPROVAL: S + 1) The work shall be done in accordance with the most recent site plans and reports filed wifh-the Office. `— r of Planning and Sustainability,as those plans are amended in accordance with this perr��t.STN,'1?;I 080 a.Hampshire Regional YMCA Parking Addition L Layout-Sheet L1,4115114 last amended 512212014 ii. Grading,Drainage,and Planting-Sheet L2,4115114 last amended 512112014 Iii.Details-Sheet L3,dated 4115114 last amended 512112014 iv.Lighting Plan-Sheet L4 dated May 5,1014 b.Reports by David Hawkins,BCMA, CTSP, Consulting Arborist, with the Director of Planning and Sustainability authorized to permit field changes to ensure consistency with the Arborist's recommendations. L Email dated May 12, 2014 titled"YMCA Crosswalk and Handicap Ramp" ii.Report dated May 4,2014 titled"Tree Assessment and Impact Report:Northampton YMCA Parking Lot Installation." 2. The above plans shall be revised or amended and be approved by the Director of Planning and Sustainability when they meet that standard prior to any work on the site and prior to this Site Plan Approval being recorded at the Registry of Deeds. 3.Prior to the start of construction, the applicant must provide evidence of that their Stormwater Management, Operation,Inspection,and Maintenance Agreement that defined and ensures long term maintenance of the proposed stormwater system has been approved by the Northampton Department of Public works. 4.Prior to construction of the infiltration trench,a Registered Professional Engineer or Certified Soil Evaluator shall complete a soil investigation to confirm the soil conditions and determine the estimated-seasonal high groundwater in the areas of the infiltration system. A vertical separation of at least two feet between the bottom of the infiltration trench and the estimated seasonal high groundwater is required. If the required two feet of separation does not exist or the soil conditions differ from those described in the application and drainage calculations,the infiltration system must be redesigned and approved by the Director of Planning and Sustainability,as the Planning Board's agent as a field change. 5.Prior to construction,the applicant must provide evidence that their soil erosion and sedimentation control measures to mitigate the discharge of pollutants to the municipal stormwater system has been GeoTMS®2014 Des Lauriers Municipal Solutions,Inc. File#MP-2014-0012 APPLICANT/CONTACT PERSON Berkshire Design Group ADDRESS/PHONE 4 Allen Place (413)582-7000 PROPERTY LOCATION 286 PROSPECT ST MAP 24C PARCEL 019 001 ZONE URB(85)/URA(15)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Tyyeof Construction: ZPA- ADD 25 EMPLOYEE PARKING SPACES New Construction Non Structural interior renovations Addition to Existing Accessory Structure — Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THEYOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON IN RMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER : § Intermediate Project: Site Plan AND/OR Special Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management C Z / Signatu e of Building officiaf Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning&Development for more information.