Loading...
32A-152 (16) CMI/StructurevEnvlronmental Engineering P.O-Box 881,Wendell,MA 01379 talhax (97 544-8000 j November 25, 1997 �- r EP[G�06 Fred Meyer Kohl Construction Campus Drive Hadley,MA Fred I have examined the pleoemeM of the HVAC unit on the roof of 5-7 Strong Rreat,Northampton,MA According to a fax received from you on 10/17197 the proposed unft Walghs 803 ft. K the unit is installed dirodly over one of the steel i-beams and is aligned with its longed yngth parallel to the beam,no additional framing w1ll be required to support the unit. If you have any questions,please do not hesitate to call. Sincerely, Robert Leet, P.E ROBERTT. r. LEFT r STRUCTURAL, 38942 �s1t:�