Loading...
35-046 (15) 2 - Further, it should be noted that I have reviewed the plan of the extensive remodeling for the structure, which plan was designed by Joseph Beatty and dated May 20, 1994. The plan provides for moving certain floor, rebuilding the kitchen area and Partitions on the first ceiling and roof structure, and installingacertain,dormerslat the rearnoffther building. I can approve the remodeling plan as shown by Mr. Beatt y, of a laminated ceiling joist construction indicated as "TJI 9/including the use 2" resident joists." It should be noted that the second story space will be prepared ial is structurally designed to accommodate occupancy at a future date. Respectfully submitted, Donald N. Weinle PE Massachusetts Professional Engineer No. 9246 "'p".t p of* DONALD NICHOLAS a d WEINLE ^� 9246 aNAI E��' ��// PERMIT P ICA O C C S PAGE'' PLOT `1w ZONE -5� DATE ZONING FORM-APPLICATION PERMIT 2 . 3 . OW 4 . 3 SE PLAN 5 . NEW CONSTRUCTION 6 CURB CUT 7 WATER S 8 REMODELINQ INTERIOR 9 . ADDITION 0 . ACCES ORY STRUCTURE 11 . SIGN / AWNING 2 , PERMIT FEE CHECK ONLY - MONEY ORDER I 3 . SPECIAL PgRMIT REQUIRED WITH DEED IF APPLICABLE 4 . UNDER SEC SECIION 127 - CMR 780 5 . FORM 6 . FILL COMMENTS : a ti b W June 7, 1994 Remodeling E.D. Prontowitz and D.R. Gueydan Dad, Northampton, Massachusetts L I have today visited the site of a dwelling located -on, Massachusetts, which structure is to be remodeled as follows: iced the site on June 7, 1994, in company with Mr. Joseph Beatty, itectural designer of the project. my visit and inspection, I noted a failure in the rear foundation 11 which caused the rear wall to bow into the building about inches. The foundation wall appears to be 8-inch concrete block construction, which I estimate to be about 40 years old. Except the bowing into the building failure, the foundation, including footing and concrete floor slab, app 3. At the rear of the first floor, there appears to be a failure at the ceiling level near the center of the house. 6. In the attic there appears to be a distortion of the roof structure, which is supported by 2-inch by 6-inch rafters, 24 inch on center. 7. The ridge line shows a measure of distortion in horizontal alignment. In light of my inspection, it is my opinion that the failure in the founda- tion wall was due to excessive pressure of roof caused resultaofgdistor- drainage in the rear of the dwelling. of the rear wall and tion of the back wall foundation, reflecting the bowing inadequate support of the excessive snow load. In conversation with Mr. Beatty, he has assured me that failures in the present structure will be adequately addressed in the remodeling program. i�- > ? n n ^. Z III ^ Ln .7 X Z m Zoning Miscellaneous Additions,Repairs,Alterations,etc. Tel.No. Alterations ✓ NORTHAMPTON, MASS. 1 9 Additions APPLICATION FOR PERMIT TO ALTER Repair Garage 1. Location 9 5 0,2, Q� Lot No. &rte/ 2. Owner's name D// e- e-ti r �c c G/ u e d e-,/ Address 9 to S 9 U 3. Builder's namet�r/a-/ 5 1,09—'041 a 5A/ Address 57 -SO 4e T'I S 77 �cz s T`iQ/n�Toti Mass.Construction Supervisor's License No. a.5 Expiration Date 4. Addition 5. Alteration �/4k�tiq oa o�� 1 re �ro- t.�q , C o/NS�5 77'Ney o ��r/y cr a,✓ 6� e2 r 6. New Porch ��tt 7. Is existing building to be demolished? DN�`/ C cl r o r Uri MG e- 8. Repair after the fire XV" 9. Garage 1 e S No.of cars 0 Size �° �- 10. Method of heating 11. Distance to lot lines �roNT a 7 7- eQ 1^ l V3 12. Type of roof 4s T c) <�S 13. Siding house 14. Estimated cos The undersigned certifies that the above statements are true to the best of his, her knowl ge d belief. Signature of responsible app,icanl Remarks l cr /o ►- �eNov �oN,S ChzoU�- 2 ��15 /n� / CiJ� e /tiS�l2'� To ' /� �2T� 5 o h r ecT o�c,✓��T�.v ��OC� rO���ht , t-aG cl S&-lhcvUG To arvclIeGel, 0/!Yl;PQ—1 ✓�sys one atv ✓rev-1 TO ,Uecv wlvC�CtiS�l��oors �l/lil/ yl sial-1 c, /yslQ`/ec� 4q� J, r -wet A-.) V-/ Co e-Fe-11 2- /- r � i Date Filed �1 C/ 0026 File No. ZO ING PERMIT APPLICATION 1. Name of Applicant:_ €«.v�-s _D. �RovoA/X;r Z Y-6/4.•V Address: 9�,3- Rf' �Y ,�d,�� a/Ifpers/.gR�PTar✓,/7?.9. Telephone: J 5/ 2 . Owner of Property: recc.UX-SC �b. .P-RDy,0. ,ZrZ AA10 _dn.?,v=ZcCF ,q< CiU0-yo4v Address: 96s' ! lr.y,t/ Ro.av ;/l1,0.er/fy�Ply.�i I/V#, Telephone: /' O.Q 6 C1 3 . Status of Applicant: /Owner Contract Purchaser Lessee Other (explain: ) 4 . Parcel Identification: Zoning Map Sheet# 5� Parcel# 5/1 , Zoning District(s) (include ove lays) Street Address (oS , Required 5 . Existinq Proposed by Zoning Use of Structure/Property --,.?CE (if project is only interior work,, skip to #6) �� Building height f %Bldg. Coverage (Footprint) 6 7c- o Setbacks�7%;4- - front or 1h,NCs J - side L: t�/ ' R:, ` L: R:�, -< rear Lot size /d3 xa�v /1sn Frontage Ids / Floor Area Ratio I& Z, , , . %Open Space (Lot area minus building and parking) Parking Spaces Loading Signs Fill (volume & location) 6 . Narrative Descri t/ion of Proposed Work/Project: (Use additional sheets if necessary) T 1� b. 'To 7•X e Qq rry T o-P- lolly c-,f d rL7-� C'Xt, T/,a da le 2--e-/ e .0 "o J- a su 3 e f.iv / r ' a e-o e e, e 7. Attached Plans: Sketch Plan Site Plan 8 . Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. ter/ Date: Applicants Signature:F C/ - - — — — — — — - - L THIS SECTION FOR OFFICIA USE ONLY: ✓Approved as presented/based on information presented Denied as presented--Reason: Special' Permit and/or Site Plan Required: finding Req ' ed' Var�iiance Required: _ rz J' ! S gnature of Building _.. or � ate NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health,Conservation Commission, Department of Public Works and other applicable permit granting outhoritlos. �. do .►� < �, s• Ln Ln CD 8 rn ,<a• °, 0 5 (D °° a °► ° d1 RIA o ag r► t b a 5• � � � o n g � $ d � ao � � �' ao15 o 0 . 5 �' o w (D 1�0y�� I..r• W Co Ali OUR ob vo o O p PV Fl- rtrt (DrT c (DN Di O NW n eD y o r tz X o• o o l� tJQ N UQ 2. 1 0• 5 0 Q S CrQ o ►�l r0 ff o o wi `'-r/ � .My � .7' 7 D .S• �" vii � r7 y � � � V � 6a o 5y ® VQ 0 ti f. " f O ka� 5 Kno v JUT M1 �- 49 Or 4 Pon . low y t 4 ,?`k Y ti s'r Allow a �' . On to rot, WAT zmkk woo , Owe O W O O r r K3. O s CZ NJ . �s. ON ° (D z y Gd r' r. cn . g owe cr rA S ca 5G ~' o nR mrt [ FIB �l a k< oN dq m Q6 5 5 5 S a mho o' c' ° o o ' � Q• � �' Q' � � � W N r-+ A " 5 d50 Oq W It ►y 4 n W o N n M " v o' o 0 Now* �c � do ..ITI O z LTI O to) /1 Q' s. 0 O l 1 A p p 00 cr °, �. s � r) 003 rt 3 UyQ O C c � P Or (7 n no a c) n o CD d CD ul WOO s � � oo C, � � ga`� Di un m o0.0 b n CA 00i m O O M PIV CD N td s .ti W bd C7� . o o 9 A�e o 5, as p o Z ON QC N tz 5 pi M C 'p0 c� w R • o 0' �' Q cr [� W N N n Ncya b s j I j I os• `° p g o ey -fl o vo Sao o ao �. N c� Ln �. °moo D : b CJ1 cv S� - S ' z m DONALD N. WEi1QX Civil Engineer and Land Surveyor Westfield, Massachusetts Reg. No. 4935 June 7, 1994 Reg. No. 9246 Re: Residence Remodeling E.D. Prontowitz and D.R. Gueydan 965 Ryan Road, Northampton, Massachusetts To Whom It May Concern: This is to certify that I have today visited the site of a dwelling located at 965 Ryan Road, Northampton, Massachusetts, which structure is to be remodeled and otherwise repaired. I can offer as follows: ' 1. I visited the site on June 7, 1994, in company with Mr. Joseph Beatty, ,. architectural designer of the project. �r 2. In my visit and inspection, I noted a failure in the rear foundation wall which caused the rear wall to bow into the building about 6 inches. 3. The foundation wall appears to be 8-inch concrete block construction, which I estimate to be about 40 years old. 4. Except the bowing into the building failure, the foundation, including footing and concrete floor slab, appear to be sound. 5. At the rear of the first floor, there appears to be a failure at the ceiling level near the center of the house. 6. In the attic there appears to be a distortion of the roof structure, which is supported by 2-inch by 6-inch rafters, 24 inch on center. 7. The ridge line shows a measure of distortion in horizontal alignment. In light of my inspection, it is my opinion that the failure in the founda- tion wall was due to excessive pressure of frost action caused by inadequate drainage in the rear of the dwelling. The roof failure was a result of distor- tion of the back wall foundation, reflecting the bowing of the rear wall and inadequate support of the excessive snow load. In conversation with Mr. Beatty, he has assured me that failures in the present structure will be adequately addressed in the remodeling program. i.