Loading...
35-040 33 SYLVESTER RD (4) s r Sic, •Ma{,� A.: f 3� s k .'. 3,� c r r , y c s � 4Sx i4 , fill IN p 4'4. M E� - s +x ir, ...E r.. ` :�: 10. Do any signs exist on the property? YES NO IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: 11. Will the construction activity disturb (clearing, grading, excava ton, or fitting)over 1 acre or is it part of a common plan of development tha will disturb over 1 acre? YES NO 'Al,I y e7 s(,,^e IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Department EXISTING PROPOSED REQUIRED BY ZONING Lot Size /0 AeAer c?r, /614tie 0, 3 7 Frontage C f r,fii t s yj Setbacks Front t S'J, c Side L: (d: R: L: � R: l(, L: R: Rear Building Height Building Square Footage / OG: i� F.,-r %Open Space: (lot area L9 k1 fr 7)f minus building It paved Q '7 parking #of Parking Spaces #of Loading Docks Fill: (volume Et location) �. yd e 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: �� Applicant's Signature NOTE:Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health,Conservation Commission, Historic and Architectural Boards,Department of Public Works and other applicable permit granting authorities. W:\Documents\FORMS\original\Building-Inspector\Zoning-Permit-Application-passive.doc 8/4/2004 gal Please type or print—alHin-fo-r—m-abon and return this form to the Building Inspector's Office with the$15filingfee (check or money order)payable to the City ofNorthampton 1 Name of Applicant: tl; 1Y O/Z 7A,4--719--701 -}/O ' ��� ��^ Id K3--_Sj 3' Owner of Address: 3-5-/ —Telephone: -' Status of Applicant:- Owner ----- -----' Purchaser-------~^~^`------~~'^' .`~p~^' �3 '� 4. Job Location: ~-- -~ In Elm Street District In Central Business District (TO BE FILLEDTN By THE BUILDING DEPARTMENT) 5. Existing Use of Structure/Property: ��� � ^�^~ e 6. Description of Proposed Use/Work/Pn4ect/Occupatiun: .(Use additional sheets ifnecessaq/): 7. Attached Plans: Sketch Plan __£�� SicePian Engineered/Surveyed Plans 8' Has a Special Permit/Variance/Rnding ever been issued for/on the site? NO DON7 KNOW YE5 |F YES, date issued: IF YES: Was the permit recorded at the Registry ofDeeds? ��—� NO DON7KNOYY YES IF YES: enter Book Page and/or Dncumenc# 9.Does the site contain a brook, body of water orwetlands? NO DONTKNOVV YES IF YES, has a permit been or need to be obtained from the Conservation Commission? ~� Needs to be obtained Obtained , date issued: � � �� �� 'v��/� r� ' �t� ������� �/ - (Form Continues on Other Side) 112 e W:mwmvnts\FOmmomuumuTmming-Inspector\Zonizg-rermm-App|mati^u-passwv.doo 8/4/2004 File#MP'--2008-0086 APPLICANT/CONTACT PERSON City of Northampton-Office of Planning&Development ADDRESS/PHONE 210 Main Street () 587-1265 () PROPERTY Or THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM ILLED OUT ee Building Permit Filled out Fee Paid Tweof Construction: ZPA-CONSTRUCT 4 UNIT OPEN SPACE RESIDENTIAL DEVELOPMENT (CLUSTER) New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTI�N HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PR�TED: Approved {/Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER: § Intermediate Project: Site Plan AND/OR 00 S ecial Permit with Site Plan Major Project:_�/Site Plan AND/ORpecial Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health _Permit from Conservation Commission Permit from CB Architecture Committee Permit fro in Street Commission _JPermit DPW Storm Water Management 1 200 Signature of Building Official bate Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact the Office of Planning&Development for more information.