Loading...
35-269 (13) Conditions: Driveway Permit In lieu of plan approved by City Engineer I agree to the following added conditions: 1) I will contact the Department of Public Works and have an inspector check and approve the graded gravel base prior to paving to insure compliance with slope and location; 2) I further agree that if in the inspections any of the permit conditions are not met that I will at no expense to the City remove and replace the driveway as directed by the City Engineer. By: Petitioner NOTE: The Public Works Department recommends that you provide a plan showing the proposed driveway with grades and location in the future to avoid possible expense which you will incur by not getting approval of actual plans in advance. "' CITY OF NORTHAMPTON, MASS. March 1, 1988 THE BOARD OF PUBLIC WORKS The undersigned respectfully petiition your honorable body for Permission to install driveway at lot A, Turkey Hill. Road Fifteen (15) foot maximum width at the street line. Gutter drainage not to be disturbed. All drainage shall be directed off the driveway surface to adjacent land and not on the existing roadway. Driveway surface to be paved if the grade of the proposed driveway exceeds 3% or more. _ Fred Mailloux s, z 15 West Farms Road 6-4152 Proposed Location Inspected by: Gus O'Grady Gravel Base Grade Inspected by: Final Approval: THE BOARD OF PUBLIC WORKS Voted that petition be granted. Paul 0. Hadsel, Director of Public Works/ City Engineer (SUBJECT TO ATTACHED CONDITION 1 & 2)