29-209 (2) V
yllNS6ftfIj Ito fIIU
DEPARTMENT Oil AUIGDINO INSPECTIONS
INSPECTOR 212 Main Street ' Nfunioipal Building
Northampton, Mass, 01000
AS A HOMEOWNER I UNDERSTAND THAT I MAY APPLY FOR AND RECEIVE
A BUILDING PERMIT FOR A HOME OR ADDLTION I INTEND TO LIVE IN,
I ALSO UNDERSTAND THAT I AM RESPONSIBLE FOR KNOWING THE STATE
BUILDING CODE AND ZONING ORDINANCE OF THE CI'T'Y OF NORTHAMPTON,
BEING A.HOhiMINER AND NOT A PROFESSIONAL CONTRACTOR IN NO WAY
ABSOLVES ME OF ANY RESPONSIBILITY TO INSURE THAT ALL FACFTS
OF THE RULES AND REGULATIONS ARE COMPLIED WITH .
ti
r"
n „ /
70.00' -
LOT 37
� 0
� O
S PC�,�/t E✓EL
WuJD�,.A,MC
\t
IZ w
-7 glr
N
ACREBF�OOK DRIVE
Issued By Northampton Conservation Commission
Signature(s)
i
i
This Order must be signed by a majority of the Conservation Commission.
On this 25th day of March 19 91 before me
personally appeared David Gengler to me known to be the
person described in and who executed the foregoing instrument and acknowled eg d that he!she executed
the same as his/her free act and deed. SPAYM M,JIM
NOTARY PUBLIC
W.tOMMIGGION SPIRES JAN. I&YW
Notary Public My commission expires
The applicant,the owner.any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be
done.or any ten residents of the city or town in which such land is located,are hereby notified of their right to request the Department of
Environmental Protection to issue a Superseding Order,providing the request is made by certified mail or hand delivery to the Department.
with the appropriate filing fee and Fee Transmittal Form as provided in 310 CMR 10.03(7),within ten days from the sate of issuance of this
Determination.A copy of the request shall at the same time oe sent by certified mail or hand oeffvery to the Conservation Commission
and the aDoficant.
a
Detach on dotted line and submit to the Northampton Conservation Comm. prior to commencement of work.
.................................._..................................................................._................................................................._..._............_...................
To Northampton Conservation Commission Issuing Autnority
Please oe advised that the Order of Conditions for the protect at 88 Acrebrook Drive, Florence
Nor am ton,
=iie Nwnber 246— 285 ras been recorded at the Reoisty of ampPSV re Mount y and
has been noted in the cram of title of the affected property in accornance with General Condition 8 on 3/26/ 19 91.
.
It recorded land, the instrument number which identifies trus Rai=zon is
It registered land, me document number which identifies this transaction is
Accucant
r
thereof shall contain language substantially as follows: "This property may be subject
to the Northampton Wetlands Protection Ordinance, the Wetlands Protection Act, an Order
of Conditions, and/or a Determination of applicability from the Northampton
Conservation Commission";
22) Any fill used in this project shall be clean fill, including soil, gravel, rock, and
loam. The applicant is prohibited from using demolition materials, asphalt, large
chunks of concrete, tree stumps and limbs, and general refuse;
23) The contractor is responsible with the applicant and property owner for any violation
and the penalties under the law for such violation. While all activities regulated by
this Order are being performed and during the construction phase for this project, an
on-site foreman, or project engineer, shall have a copy of this permit at the site, be
familiar with the conditions of this permit, and adhere to such conditions. A copy of
the plans and Order must always be on-site and in all excavating machinery when work
is being performed;
24) All required permits must be obtained from the Planning Board, Zoning Board, Department
of Public Works, & Building Inspector prior to the start of this project and all
permits must be complied with. Army Corps of Engineers 404 permits and Water Quality
Certifications must be obtained prior to the start of projects involving fill within
wetlands;
25) Upon completion of the project, the Applicant shall submit a statement that all work
has been done in conformance with the provisions of the approved Order of Conditions
and request a Certificate of Compliance. (if checked) Statement shall be by a
Professional Engineer or by a Wetlands Consultant who has been approved by the
Commission:
[ ] YES [X ] NO
26) (if checked) An "As Built" plan shall be included with the project engineer's
statement, detailing the post-development conditions of the site: [ ]YES [XJ NO.
27) Pool chemicals must be stored in water-tight building.
28) No fill may be brought onto sight, except sand to support the pool.
29) Lawn cannot be extended beyond the area shown on the plans.
30) The wetland line shown on plans is not accurate and not accepted.
(speccond 2/13/91)
Plans:
TITLE DATED SIGNED & STAMPED BY: ON FILE:
88 Acrebrook Site Plan Cons. Comm.
Cons. Comm.
Cons. Comm.
Cons. Comm.
Cons. Comm.
Special Conditions:
13) All construction areas shall be restored to original condition or better upon
completion of the project, including vegetation;
14) No area within the 100 year floodplain, any wetland, or area within 100 feet of a
wetland or 40 feet of a 100 year floodplain, as defined in 310 CMR 10, and Chapter 24,
shall be permissible disposal sites, unless such areas are specifically approved by the
Commission;
15) Excavated material and topsoil stockpiles shall be located and stabilized so as to
minimize washing into wetland areas or waterways;
16) Adequate measures shall be taken to prevent erosion and siltation of all disturbed
areas, and shall be implemented prior to any construction. Sedimentation and erosion
control devices shall be placed according to standards set in the U.S.D.A. Soil
Conservation Service, "Guidelines for Soil and Water Conservation in Urbanizing Areas
of Massachusetts". Placement shall be directed at the site by the project engineer in
order to accomplish maximum control of erosion and ensure than no eroded materials will
reach wetland resource areas. Hay bales must be staked. Silt fencing must be placed
in a dug trench with sufficient porosity to allow detained water to pass while trapping
suspended sediments;
17) The areas of construction shall remain in a stable condition at the close of each
construction day. Erosion controls shall be inspected at this time, and maintained or
reinforced to meet specifications in the plans and this order;
18) This Order of Conditions shall apply to any successor in interest or successor in
control;
19) Members and agents of the Conservation Commission shall have the right to enter and
inspect the premises to evaluate compliance with the Conditions and to require the
submittal of any data deemed necessary for that evaluation;
20) The Applicant shall notify the Commission, in writing, as to the date that work will
be commencing on the project. Said notification must be received by the Commission no
sooner than ten (10) days and no later than five (5) day's prior to the commencement of
the approved activity;
21) The owner of the property described in this Order must advise any potential buyer of
the property that any construction upon or alteration to said property, including brush
clearance, may require action by the Northampton Conservation Commission and any
instrument conveying any or all of the owner's interest in said property or any portion
5-3A
<1�
Therefore. the Northampton Conservation Comm. finds that the following conditions ars
necessary, in accorcance with the Performance Standards set forth in the regulations, to protect those inter-
ests checked above.The Conservation Commission orders that all work shall be performed
in accorcance with said conditions and with the Notice of Intent referenced above.To the extent that the fol-
lowing conditions modify or differ from the plans,specifications or other proposals submitted with the Notice
of Intent. the conditions shall control.
General Conditions
1 . Failure to comply with all conditions stated herein, and with all related statutes and other regulatory meas-
ures, shall be deemed cause to revoke or modify this Order.
2. This Order does not grant any property rights or any exclusive privileges:it does not authorize any injury
to pnvate property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state or local statutes, ordinances.by-laws or regulations.
4. The work authorized hereunder shall be completed within three years from the date cf this Order unless
either of the following apply:
(a) the work is a maintenance dredging project as provided for in the Act:or
(b) the time for completion has been extended to a specified date more than three years,but less than
five years,from the date of issuance and both that date and the special circumstances warranting
the extended time period are set forth in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill,containing no trash,refuse,rubbish or de-
bris, including but not limited to lumber, bricks, piaster, wire,lath,paper, cardboard, pipe, tires,ashes,
refrigerators,motor vehicles or parts of any of the foregoing.
7. No work snail be undertaken until all administrative appeal periods from this Order have elapsed or, if
such an appeal has been filed, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located,within the chain of title of the affected property. In the
case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the lane upon which the proposed work is to be done.In the case of registered land. the
Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which
the proposed work is to be done.The recording information shall be submitted to the Comma Gsi on
on the form at the end of this Order prior to commencement of the work.
9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size
bearing the words, "Massachusetts Department of Environmental Protection,
Fie Number 246' 285
10. Where the Department of Environmental Protection is requested to make a determination and to issue
a Superseding Order, the Conservation Commission shall be a parry to all agency proceedings and
hearings before the Department.
11 . Upon completion of the work described herein. the applicant shall forthwith request in writing that a
Certificate of Compliance be issued stating that the work has been satisfactorily completed.
1 2. The work snail conform to the following plans and special conditions:
5-2
310 CM—rl 10.99
Form 5 246-285 I
+�-• (to os wavoao by 0EP1
�=
Commonwealth CiryiTown Northampton
- of Massachusetts
Applicant Adams
Order of Conditions
Massachusetts Wetlands Protection Act
G.L. c. 131 , §40 AND THE
NORTHAMPTON WETLANDS PROTECTION ORDINANCE
From Northampton Conservation Commission
To Hugh and Mary Beth Adams Same
(Name of Applicant) (Name of property owner)
88 Acrebrook Drive
Address Florence. MA 01 060 Address Same
This Order is issued and delivered as follows:
by hand delivery to applicant or representative on (cate)
3 by certified mail, return receipt requested on March 26, 1991 (date)
This project is located at 88 Acrebrook Drive, Florence
Northampton, MA
The property is recorded at the Registry of Hampshire County
Book 2837 Page 199
Certificate(if registered)
The Notice of Intent for this project was filed on March 16, 1991 ' (date)
The public hearing was closed on March 26, 1991 (date)
Findings
The Northampton cnnsPr17qtjnn Commissinn has reviewed the above-referenced Notice of
Intent and plans and nas neid a public hearing on the project. Based on the information availaele to the
Conservation Commission at this time.the Commission has determined that
the area on which the oreoosed work is to be done is significant to the following interests in accorcance with
the Presumptions of Significance set forth in the regulations for each Area,Subject to Protection Under the
Act(check as appropriate):
❑ Pubiic water supply ® Flood control ❑ Land containing she(ffish
❑ Private water supply 91 Storm damage prevention ❑ Fisheries
❑ Ground water supply ® Prevention of pollution ❑ Protection of wildlife habitat
Total Filing Fee Submitted $55 (+$35) State Share $15
City/Town Share $40 (+$35) (1/2 fee in excess of S25)
Total Refund Due S 0 CityfTown Portion S 0 State Portion S 0
V/z total) ('/z total)
Effective 11/10/89 �'1
Da;� Filed ------_-- File No
IO2d:C21G Pi'�7Z�d7`1' 1tP1�T :CC7�'nTON � -'
Z 011?21q Orcl nancce i:i.on 10 , 2
1. , Name nf;'i•ntol.i.ca»t. ;
- - `- !—►' 1?y 1J� � /c��f� J
?:ddr. e s s ; -- -- Telephone :
hon
- p -2
2 , Owner. 0f Propert:v -
A `1'e l e ph one
3 , Status of A.nnl_.i,cant: ; Ae5rDI;mer Contract Purchaser
Less0C'. _— Other (expla n : )
A , Pa r. cel :Cdent. fi.cat_.0n ; Zon.i.ng Map Sheet _ r Parcel>r �Q ,
Zoning Districts) _ 12 1Z
Street Address $ EQQ t2eapK D/Z
5 , Compliance' with Zoni.nu ; i xi.sti.ny Proposed
Use of Structure/Property
Size of Structure (sq , ft , )
Building height
Building Coverage
Setbacks - front TT 1"
I
- ,side
fa - rearA /7lJ`
Lot Size
},J:Outage
Floor Area Ratio
o
Open Space —_---^
Parking Spaces --�
Loading Spaces -- ---
signs -
Fill (volume & location) —
6., narrative Descr).nti.on of P 000sed work Pro sct ; (Use
addit ' 6 al huts ir.' necessary)
7 , Attached Plans ; Sketch Plan Site Plan
S . Certification ; :t hereby certify that the 'ih�Pormation, contained
herein is true and accurate to the best of my knowledge ,
91 ,r
• Date ; A.pplicant ' s Signature ; '
THIS SECTION~FOR OFFICIAL USE ONLY : _ - _ y � `"
tr- Approved as presented
Denied as presented
Reason for Denial ;
Signature of BLiild.i.ng :inspector r __ Dade 4 �7
Olw,II
1�
tv b O�
a
O
CIQ
'» Z
d O
�o �
Zoning
Miscellaneous Additions,Repairs,Alterations,etc. Tel.No. Alterations
go NORTHAMPTON, MASS. 19 Additions
APPLICATION FOR PERMIT TO ALTER Repair
/t i_ Garage
1. Location A a L'6 R o a« Q i➢L_ Lot No.
2. Owners name Hu 0� S Y U-'t� / 0..M Address g\\ C 2 P P_oQ L �ia
3. Builders name To y �L A2 PCnt s Address�l AO'C W ST. in l C aP �', a
Mass.Construction Supervisor's License No. Expiration Date
4. Addition !- p
5. Alteration ti �T A l i ATs 1tJ d z 46y a (5 R u u�d t o0
6. New Porch
7. Is existing building to be demolished?
8. Repair after the fire
9. Garage No.of cars Size
10. Method of heating
11. Distance to lot lines
12. Type of roof
13. Siding house
14. Estimated cost:- "—
I v.
The undersigned certifies that the above statements are true to the best of his, her
knowledge and belief.
Signature of responsible applicant
Remarks
PflIN, _TaSNOP
Y
M �y ;. � � ,roar, AOi- Q, n � a /A,- O � v� ►+~•� O p�.►
r r p
p 'n O C ,'�' � b 7 C CA v saesee'�0
""s ray, e••r ' .� .... O ro W
C CY ro ro ro � 0 0 C" 'O Y O H
ti o o a In ro ro
CA
o o o -• �-* r* o c �C
c V1 ro rA ro �'• � ' p �J H ►'3
o ' o :r x
CD
to ID b va
C M in
' CA cn
to
P• '
a �v
Z- n
ro
CO) cn
� Q a �
ro
�7 OT7 � b
ro �• o• o f-9. C ro o O C
CA
d �• a v�• �Oj p f9 O UQ
l'-� fV � a "r "�7'• G Q f�D W y d
tz Z
p C/1