Loading...
July 15, 2013 Minutes MCENTRALBUSINESSARCHITECTURECOMMITTEE INUTES OF J15,2013 ULY CCC210MS,N ITY OUNCIL HAMBERS AIN T ORTHAMPTON  Chair, Aelan Tierney  Vice Chair, Joe Blumenthal  Bruce Kriviskey  Rick Klein  Barry Steeves  Bob Walker Staff: Planning Director, Wayne Feiden  Senior Planner, Carolyn Misch 7:00 PM No Public Comment Tristram Metcalfe for alterations to fire Aelan Tierney opened the public hearing with the request for escape, rooftop solar and other changes, 184 Main St, Northampton Map ID 31D-161. Metcalfe presented the proposal and distributed a revised plan dated July 10 showing modifications to the rear fire escape. He clarified that there would be no ladder and no fire shutters because they have opted to install sprinklers over the windows instead. Metcalfe described the intent to place a solar farm and vegetable garden on the roof. The PV panels need to be elevated somewhat off the roof for cooling and away from the snow loads. Rick Klein asked if they had had designed greater carrying loads within the building to offset the roof load of the solar panels. Metcalfe confirmed that they had made it strong enough to carry live loads on the roof as well. He noted it was a 10 KW design. Klein asked if the property boundary was accurately surveyed to confirm they could build the fire escape and elevator shaft within the property and without blocking the alley. Tris noted that they had confirmed the boundaries and were within them. He also confirmed they had a PV engineer design the roof top trellis. Bob Walker clarified that there were three aspects of the application that needed approval: Fire Escape, Elevator, roof top mechanicals-trellis for PV. He noted that he had no issues with the fire escape but felt the other two components did not meet the criteria as shown to comply with the design guidelines. Joe Blumenthal asked why the elevator was shown if there was no immediate plan to construct it. Mead stated she would put that in ideally within a year or more. Aelan Tierney asked if the fire escape stairs would work with the elevator shaft as drawn? She suggested that the elevator shaft should have the same decorative band continued from the main building around the new element. She also noted that the concept for installation of roof top solar was positive but the way it was designed overpowers the rest of the building and therefore is inconsistent with the design guidelines. A less visible structure might be approvable. Bruce Kriviskey concurred. Rick Klein stated he was unsure that the roof could support the soils necessary to create a viable rooftop garden. Bob Walker reiterated that the rooftop structure projected too far above the roof plane. Tierney asked about window replacements. Metcalf described windows that would be replaced in kind with what is existing. There was a discussion fo the exterior banding not shown on the plans. Metcalfe confirmed that there would be no change to the exterior façade. Upon motion by Joe Blumenthal and second by Bob Walker the Committee voted unanimously to close the hearing and issue a permit with conditions: the surface of the structure would not change, there would be no elevator and no pergola /solar structure. Board discussed next meeting date. Upon motion by Joe Blumenthal and second by Bruce Kriviskey the board voted unanimously to approve the minutes of 5-22-13 7:50 Adjourn. .