06-039 (6) 6. -37
SAGE ENGINEERING AND CONTRACTING, INC.
DESIGN-BUILD DEVELOPMENT, ARCf11TECTURALENGFN€ERING,-AND•COASTRUCTION MANAGEMENT
December 5th, 20I 3
OEC - 9 20(3
LOUIS Hasbrouck, Building Commissione EtectL—nc
City of Northampton
2 12 Main Street
Northampton, Ma 0I OGO
RE:Zoe Senior Retirement Community, 345 Haydenville Road, Northampton, Ma
SAGE Project No. 0482
City of Northampton Building Permit No: BP-2013-1 095
Dear Mr. Hasbrouck:
On behalf of Chakalos Investments, Inc., please find the enclosed Construction Control
Field Inspection Report dated 12-05-13 as required by The 2009 International
Building Code and the Massachusetts State Amendment to the 2009 International
Building Code for your reference on the existing project in progress named above.
We are available at your convenience to review the inspection reports, answer any
questions or concerns you may encounter regarding this project.
Sincerely,
Elias-Dimitr�s Nikoladis
Junior Engineer
SAGE ENGINEERING*CONTRACTING, INC.
199 SERVISTAR INDUSTRIAL WAY-SUITE 2
WESTFI ELD, MASSACHUSETTS 0 1 085
TEL: 413-562-4884 co FAX: 413-562-4899
PAGE 1 OF 1 www.sage-IIc.com
CONSTRUCTION CONTROL FIELD INSPECTION REPORT
Project: Zoe Senior Retirement Community
SAGE ENGINEERING&CONTRACTING, INC. Job Location: 345 Haydenville Road
199 SERVISTAR INDUSTRIAL WAY,SUITE 2 Northampton, MA 01060
UVESTFIELD, MASSACHUSETTS 01085 Inspection Date: 12-05-2013
(413)562-4884 Time: 09:00 AM to 11:00 AM
Sage Job Number: 0482-04-13
Building Permit No: BP-2013-1095
WEATHER: Light drizzle,34°
EST.%OF COMPLETION: 18%
CONSTRUCTION SUPERVISOR: Ed Fortini,Sage Engineering&Contracting, Inc.
PRESENT AT SITE
-Sage Engineering&Contracting, Inc.
-Waldo Construction(Site Sub Contractor)
-McCain and Sons(Plumbing Sub Contractor)
-Gustafson Electric(Electrical Sub Contractor)
-Warehouse Mechanical(Fire Protection Sub Contractor)
-Staruk Inc.(Framing Sub Contractor)
Equipment:
-Komatsu CK 35 -Storage Container
-Lull 844C -Mobile Office Trailer
-(3)Portable Restroom Facilities -JLG Lift RSC-600
-Cat 312 Excavator -Sage Storage Trailer
WORK IN PROGRESS
- 3'floor rough framing of bearing walls and partition walls west of gridline 6.5
- 3rd floor deck is being installed west of gridline 6.5
- Rough electric on 1r floor east of gridline 6.5
- Rough plumbing 1'floor east of gridline 6.5 in kitchen area
- Rough plumbing 1 rd floor west of gridline 6.5
- Fire protection rough 1 rd floor east of gridline 6.5
Fire caulking 2nd floor east of gridline 6.5
- Sheet rock is being installed 3rd floor east of gridline 6.5
- Poly vapor barrier is being installed 3rd floor east of gridline 6.5
Soundboard is being installed 3rd floor east of gridline 6.5
- Temporary heaters are being installed east of gridline 6.5
- Fiberglass batt insulation on 2"d floor east of gridline 6.5
WORK COMPLETED SINCE PREVIOUS INSPECTION
- 1St and 2"d floor rough framing of bearing walls and partition walls west of gridline 6.5
- Rough plumbing 2" and 3rd floor east of gridline 6.5
- Fire caulking 2" floor east of gridline 6.5
- Rough electric on 2"d and 3rd floors east of gridline 6.5
- Spray foam insulation 1st,2nd and 3rd floor east of gridline 6.5
Fiberglass batt insulation 3"d floor east of gridline 6.5
- Fire protection rough 2nd and 3rd floors east of gridline 6.5
- Pavement base course is being installed
OBSERVATIONS
Work in Progress Is In Compliance With Plans&Specifications.
INFORMATION OR ACTION REQUIRED
Ci
COMMENTS
-It was observed that long trusses spanning the dining vl ` 4`e i
9 P 9 9 wir � eetmg bearing area requirements. An additional
header was desi•ned and installed.
INSPECTION BY: �� > ENGINE -
1s� ti41±� ikolaidis r P.
DATE: _:,06 • -2013