Loading...
31A-279 (3) Schneider Plumbing&Heat 413-268-9487 p.2 3 1/4 _ /75-) 30 West Pomeroy Lane Amherst, MA 01002 '4 Phone: 413-835-5162 POWERHOUSE Email: matt.turcotte@gmail.com Site Information Date Of Test: 12/10/2013 Client Schneider Plumbing & Heating Site Address: 88 Washington Ave Northampton, MA 01060 Test Performed By: Matt Turcotte Job#: DT-053 Duct Pressurization Test Results Type of Test Performed: Post-Construction, leakage to outside (8%) Duct System 1 (basement) Conditioned Floor Area: 1055 sq ft Duct Flow at 25 Pa: 30 CFM Duct Leakage: 2.84 CFM per 100 sq ft of conditioned floor area TEST RESULT : PASS Duct System 2(attic) Conditioned Floor Area: 942 sq ft Duct Flow at 25 Pa: 36 CFM Duct Leakage: 3.82 CFM per 100 sq ft of conditioned floor area TEST RESULT: PASS Duct System 2 (utility closet) Conditioned Floor Area: 882 sq ft Duct Flow at 25 Pa: 70 CFM Duct Leakage: 7.94 CFM per 100 sq ft of conditioned floor area TEST RESULT: PASS Notes on Area Tested and/or Testing Conditions: 2009 IECC Minimum Requirements, per Section 403.2.2 Mid-Construction Test,total leakage without air handler<4 CFM per 100 sq ft of conditioned floor arc Mid-Construction Test,total leakage with air handler< 6 CFM per 100 sq ft of conditioned floor area Post-Construction Test, leakage to the outdoors< 8 CFM per 100 sq ft of conditioned floor area Post-Construction Test, total leakage < 12 CFM per 100 sq ft of conditioned floor area