Date Of Test: 12/10/2013
Client Schneider Plumbing & Heating
Site Address: 88 Washington Ave
Northampton, MA 01060
Test Performed By: Matt Turcotte
Job#: DT-053
Duct Pressurization Test Results
Type of Test Performed: Post-Construction, leakage to outside (8%)
Duct System 1 (basement)
Conditioned Floor Area: 1055 sq ft
Duct Flow at 25 Pa: 30 CFM
Duct Leakage: 2.84 CFM per 100 sq ft of conditioned floor area
TEST RESULT : PASS
Duct System 2(attic)
Conditioned Floor Area: 942 sq ft
Duct Flow at 25 Pa: 36 CFM
Duct Leakage: 3.82 CFM per 100 sq ft of conditioned floor area
TEST RESULT: PASS
Duct System 2 (utility closet)
Conditioned Floor Area: 882 sq ft
Duct Flow at 25 Pa: 70 CFM
Duct Leakage: 7.94 CFM per 100 sq ft of conditioned floor area
TEST RESULT: PASS
Notes on Area Tested and/or Testing Conditions:
2009 IECC Minimum Requirements, per Section 403.2.2
Mid-Construction Test,total leakage without air handler<4 CFM per 100 sq ft of conditioned floor arc
Mid-Construction Test,total leakage with air handler< 6 CFM per 100 sq ft of conditioned floor area
Post-Construction Test, leakage to the outdoors< 8 CFM per 100 sq ft of conditioned floor area
Post-Construction Test, total leakage < 12 CFM per 100 sq ft of conditioned floor area