Loading...
11A-071 (9) - ' .. rl HIH Wright Duilders Inc. i 3 iv`� U j EB " 5 Industrial Dr. Northampton, MA p10W D..EFT O F$;�1 C E IGL ros iZi7r^ iS A dG:�1 • M�MQ�ANpUM To: building Inspector ' From: Ed plander 2/71 Date: 2-12-96 c It has been over two months since we first inquired about the process to have a residence not previously certified for occupant' made legal b means of inspection and subsequent compliant measures. Has a protocol been established? We need to move forward with our project. Please contact us at your earliest con vienience. Thank you. //i --o7 04.ammo, t" ,J 4t (lit of Nortimntpton —* l assachusetts - DEPARTMENT OF BUILDING INSPECTIONS INSPECTOR 212 Main Street • Municipal Building 7C1 M=SVe Northampton, Mass. 01060 Wright Builders 115 Industrial Drive Northampton, MA 01060 Feb 15, 1996 To: Ed Olander RE: Fax Dated 2/12/96 Dear Mr. Olander, Your fax was received on Feb 13 , 1996 in regards to a dwelling unit that does not have a Certificate of Occupancy. The issue was being discussed by former Building Commissioner, Frank Sienkiewicz and former City Solicitor, Kathy Fallon, at that time it was my understanding that they were trying to resolve the legal issues surrounding inspection of work that is concealed and should have but never was inspected. I was also under the impression that these were issues that they resolved with you before their departure from city government. Needless to say I was surprised by your fax and the tone in which you worded the fax. I will attempt to resolve the issues surrounding this problem and will be in touch with you with regards to this matter. Sincerely, Ant ony Patin Building Commissioner City of Northampton