Randolph Place storm drain to Historic Mill River 32C-163 WetlandsNotice of intent 7?row-/6
Under the
Massachusetts Wetlands Protection Act, G.L. c. 131, §40
and
Application for a Department of the Army Permit
Part I: General Information
1. Location: Street Address West
Lot Number
2. Project: Type
drainage outfall into Old Mill River.
of stone rip -rap
headwall.
3. Registry: County
Certificate (If Registered Land)
Board of Public Works
Address
Commonwealth
of Massachusetts
on stream bed to
of Pleas
old railroad bed
Inst
1
Description
Construction
Applicant
Address 125 Locust
Richard Boyle
5: Property Owner
Northampton Street, Eastham
Almer Huntley, Jr. Assoc. Inc.
DEGE File No.
(To be provided by OEGE)
CitylTown
Applicant ^f Eul,l i r 14
of headwall and
lacement
control possible erosion in immediate area around
Current Boo
Page
Tel 586 -1850
Te1 527-1580
T -7444
6. Representative
125 Pleasant Street, Northampton
Address
7. Have the Conservation Commission and the DEGE Regional Office each been sent, by certified mail or
hand delivery, 2 copies of completed Notice of Intent, with supporting p lans and documents?
Yes Ca No
L
L_
approvals required by local by-law been obtained?
Have an obtainable permits, variances and
Yes NO 0 None required by local by -law
9. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L c. 131, §40A or G.L
c. 130, §105? Yes No]
10. List all plans and supporting documents submitted with this Notice of Intent.
Identifying Title, Date
Number /Letter
A Cross Country Sta. 0+77 to
L_
Locus
11. Check those resource areas within which work is proposed:
(a) (I Buffer Zone
(b) Inland:
0 Bank'
Bordering Vegetated Wetland'
0 Land Under Water Body Waterway*
(c) Coastal:
Land Under the Ocean'
Coastal Beach*
0
Obtained:
Barrier Beach
Rocky Intertidal Shore'
Land Under Salt Pond'
Fish Run'
Applied For:
Calculation sheets and plan
Erosion Control Diagrams
1 Designated Port Area
Coastal Dune
Coastal Bank
Salt Marsh'
Land Containing Shellfish'
Land Subject to Flooding,
Bordering
Isolated
3 -2
Not Applied For
sta. 0 +40, Oct. 1983
Soil conservation map, borings, and soil description
200 scale of project locus
'Likely to involve U.S. Army Corps of Engineers concurrent jurisdiction. See General Instructions for
Completing Notice of Intent.
Part II: Site Description
Indicate which of the following information has been provided (on a plan, in narrative description or calcula-
tions) to clearly, completely and accurately describe existing site conditions.
Identifying
Number /Letter
(of plan, narrative
or calculations)
E
A B
A B
A
Man -made Features:
'Structures (such as buildings, piers, towers and headwalls)
Drainage and flood control facilities at the site and immediately off the site, including
culverts and open channels (with inverts), dams and dikes
Subsurface sewage disposal systems
Underground utilities
4 Roadways and parking areas
A Property boundaries, easements and rights -of -way
Other
Part III: Work Description
Indicate which of the following information has been provided (on a plan, in narrative description or calcula-
tions) to clearly, completely and accurately describe work proposed within each of the resource areas
checked in Part I, item 11 above.
Identifying
Number /Letter
(of plan, narrative
or calculations)
A
A
A
A &E
F C
*See below
Natural Features:
SoRS
Vegetation
Topography
Open water bodies (including ponds and lakes)
Flowing water bodies (including streams and rivers)
Public and private surface water and ground water supplies on or within 100 feet of site
Maximum annual ground water elevations with dates and Location of test
Boundaries of resource areas checked under Part I, item 11 above
Other
Planview and Cross Section of:
Structures (such as buildings, piers, towers and headwalls)
Drainage and flood control facilities, including culverts and open channels (with inverts),
darns and dikes
Subsurface sewage disposal systems underground utilities
Filling, dredging and excavating, indicating volume and composition of material
Compensatory storage areas, where required in accordance with Part III, Section 10:57
(4) of the regulations
Other
Point Source Discharge
Description of characteristics of discharge from point source (both closed and open
channel), when point of discharge falls within resource area checked under Part I, item
1 1 above, as supported by standard engineering calculations, data and plans, including
*None required. Rip -rap
but not limited to the following:
and headwall w ill not
1
Coastal Resource Area Type:
O Inland Land under water wa
Proposed headwall will have a velosity reduction structure
located between the pipe opening and the actual edge of the
River channel. Location of the proposed headwall was
chosen because of a natural cove in the existing bank. This
cove as shown on document "A" will be used for the installation
of the headwall and the necessary bank rip -rap to protect the
existing bank and river bottom from future erosion and
iltation.
Identifying number or letter
of support documents
1. Delineation of the drainage area contributing to the point of discharge; F c
2. Pre and post- development peak run-off from the drainage area, at the point of discharge, for at least the
10 -year and 100 -year frequency storm;
3. Pre and post development rate of infiltration contributing to the resource area checked under Part l, item
11 above;
4. Estimated water quality characteristics of pre- and post development run -off at the point of discharge.
Water quality characteristics should not change. Discharge presently entering
Part IV: Mitigating Measures Mill River downstream.
1. Clearly, completely and accurately describe, with reference to supporting plans and calculations where
necessary:
(a) AU measures and designs proposed to meet the performance standards set forth under each re-
source area specified in Part II or Part III of the regulations; or
(b) why the presumptions set forth under each resource area specified in Part II or Part III of the regula-
tions do not apply.
Coastal Resource Area Type:
Inland Bank
Proposed headwall entering bank in an existing cove in the ban
Area to be disturbed exhibits signs of previous dumping.and
filling. Bank above and below headwall will be excavated_
and faced w;th stone rip -rap back to their original grade.
Siltation checks and ponds will_ be established to control
siltation immediately down stream of proposed work area and
work will proceed according to the attached recommended work
pro'cedure and /or as instructed by the Engineer.
Identifying number or letter
of support documents
k.
r
D Inland
0 Coastal Resource Area Type:
Coastal Resource Area Type Bordered Sy 100-Foot Discretionary Zone:
Lf Inland Bank
Proper siltation controls will be instituted throughout
construction as spelled out in documents "D"
Identifying number or letter
of support documents
2: Clearly, completely and accurately describe, with reference to supporting plans and calculations where
necessary:
(a) all measures and designs to regulate work within the, Buffer Zone so as to insure that said work does
not alter an area specified in Part I, Section 10.02(1) (a) of these regulations; or
(b) if work in the Buffer Zone will alter such an area all measures and designs proposed to meet
the performance standards established for the adjacent resource area specified in Part II or
Part III of these regulations.
Identifying number or letter
of support documents
Put V: Additional Information for a Department of the Army Permit
pled Mill River channel.
1. COE Application No.
(to be provided by COE)
3. Names and addresses of property owners adjoining your property:
Phyllis Zalesky, 95 Pine Street, Westfield, MA 01085
Mass. Electric Co., P.O. Box 305, Florence, MA.
Karl J. Zalesky, 43 Wilson Ave., Northampton, MA
George A. Spence and Marvin J. Spence 6 -A Randolph Place, Northampton, MA
Richard J., Gerry Margaret T. Risciott, 36 Wilson Ave.., Northampton, MA 01060
4. Document other project alternatives (i.e., other locations and /or construction methods, particularly those•
that would eliminate the discharge of dredged or fill material into waters or wetlands).
5. 8'/ x 11" drawings in planview and cross section, showing the resource area and the proposed activ-
ity within the resource area. Drawings must be to scale and should be clear enough for photocopying.
Certifications required from the DNtsbn of Water Parton Control before the Federal permit can be issued.
Certification may be obtain b centactrg the Don of Water Pollution Control, 1 Writer Street
Massacn tts 02108.
Where the actMj will take place wthin the area under the Massachusetts approved Coastal Zone
rrt certifies that his proposed activity cornpees with and will be conducted
Management Program. the app
n a manner that •s consistentwith the approved program.
the non e for a permit and s made a matter of put�6c
Information provided will be used in evaluating appica
record through issuance of a pubic notice. Dscbsure of this information is voluntary. however if necessary
information is not provided.
the appicaticn cannot be processed nor can a permit be issued.
hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents and supporting data are true and complete, to the best of my knowledge.
e/83
6;211-61(9 C)?&
Signature of Applicant
MED FORM 100 (TEST)
1 MAY 82
2.
(Name of waterway)
Date
Signature of Applicant's Representative
"Exception to ENG Form 4345 approved by HQUSACE, 6 May 1961".
"This document contains joint Dep•rtment of the Army and State o(M ►usetta applieatiow
for permit t• obtain permission to parlors activities is United States waters. The Ofrct
oI M•nageTsent and Budget (OMB) has approved those Questions required by the US Army Corps
of Engineers. OMB Number 0102-0038 and expiration d•t• of 30 Septesb•r 1983 applies This
statement will b• set in 6 point type-
3 -6
0
EASTHAMPTON QUADRANGLE
MASSACHUSETTS.
7.5 'MINUTE SERIES (TOPOGRAPHIC
M n h a rt {v{ esc avrs-
z.
Meado.ws
d
IsIO-RTHAliPT
•tNorthampton
for Girls
%l Williavta St
ach
Pt
ul,
!i .Sancr.23 'Y
.1:
i
p p
Elwell.,
Island\ i
ILYOKE QUADRANGLE
MASSACHUSETTS
MINUTE SERIES (TOPOGRAPHIC)
I
i
II 1 1
La`FleUN
'A
Y
CoRPoRAre
ShephE
Isla
Loo, flu +►st
IS
C.
0
E
I-1
1
L
N.
U
lZ
T
W
X
Y
A,A
3
C
Ea.
Ft-
42.0
34.0
21
LIO
10, 'S
3.2
2. t�
0.9
3. o
3.0
{a
1.3
0.8
I.0
1.2
4.1
2 =:3
l.o
0.9
0,7
0,(0
5�.
1.1
1.4
o.4
o.0
1,0
1,1
1.
Almer Huntley Jr. Assocs. Inc.
Surveyors Engineers Landscape Architects
125 Pleasant St. P. O. Box 568
NORTHAMPTON, MA 01060
(413) 584-7444
euN oFi' ‘1 gWA•1tS
JOB
03
0.3
0.3
0.4
0,4
0.3
0,
0,4
a.
U•4r
0.4
J,C
J.7
d.43
o. a
v.7
0.7
0.7
0.(,
0.(o
0.G
0.1
0, S'
o.�
0.8
0.9
v.q
0.9
CHECKED BY
SCALE
33.
19. G
8.0
IZ•(.
Z•9
3.5
I.1
4.r
3.0
3.1
4.0
I.1
2.4
2.i
4. 1
2..1
itCp
j., L
1.
Si o
1 7
3.4-
•s4
L%
2.7
j.0
DRA(NR L (AV 04- .n0.r i k i r-t, Sr
SHEET NO OF
CALCULATED BY 3MV DATE' 1 Si
DATE
euNoFf. c s
4= 4$oo
14 41
Sari
C Cu€F, t* y2wNu&
UltITEZS. 1.c T) .i t F
M. 4.
33
3Z
Almer Huntley Jr. Assocs. Inc.
Surveyors Engineers Landscape Architects
125 Pleasant St. `P. O. Box "568
NORTHAMPTON, MA 01060
(413) 584 -7444
Di ST.
112—
1 �Z
2Z.
2 2.4
..1-►- D R.An t.r. Arb€... pipit.-r7 1(cs 6 0. Q. f UD k-3;
u..... Ni?........ suR $0 Ge-QV. Ps,
ra..
t..) -.17. tic;110,J
ay. S t) 2.c.1 4 2-b sl c: F t,. w pie. \.k. C.RL) 6.VA -P o ►J Z.
INV•
R
es, ,t sx►si tNy PtPCL.►NvCS
sLze f_
o
.a►
0 .0o
4-
C -�2NQ.
1 4( O
144,1
44. Co
14c.
144.1
JOB
2.
V
D241,04 AL CAL.c uuten S 4r.) (2, ST
2
SHEET NO.
CALCULATED BY SMV
CHECKED BY DATE
SCALE
Q RUNaP-
1c -S)
2.4 P
2• cR
2
8 c�
1 1
s
14,
X
Pi P*._
5 tz
lS
OF
DATE /I
P1�4_ StZt p4-. 12!u►N t3S'Nb MAN EyJ)4 O J
83
2 8i._
21
2l0
2s
ZS
2ZA
2.2
1 74
l7
Almer Huntley Jr. Assocs. Inc.
Surveyors Engineers Landscape Architects
125 Pleasant St. P,'0. Box 5
NORTHAMPTON, MA 01060
(413) 584 -7444
F —o,.- i N N sw st4:s
r ■s,...
139
1
280
Cos
2,3B
I SZ
ZS a
3►3
90
325
24(.0
S il
290
!NI*
134.34 ,N
Z9.
0.014
O. 004
2.8.4/
6.0c. 4-
27.9S
0.0o 4-
/Z7
O.004
0,004
12S". 34-
CD. oo4
ZS��
p. OD 4
/21.32
0.004-
14, 37
6.004-
/Z3.76
O• 0 04-
/4 2,1'
Z /.S/
Z/. /S
/Or
11 7. 9
143. 3
1 +1.4-
JOB
I�TLAIN CALGULg1,ONS K,Nt� Sr.
3 OF
S M DATE 11 3
CALCULATED BY
CHECKED BY DATE
SCALE
SHEET NO.
(c.*C Cc)
139,0
138,C 1,40 V
S9 3
38.3 S.
(36;3 1.1
/58.1 1. I-t14
138.1 1 z,l F
137,) 3,4 AA
l
3-C 3.:9 N
135
4.s-
135.$
13 S'•
15.v
1i. b
1 .4 4 Cl
3o. C
2 3, 6
P+
slat
C^.)
3a
42
4 2
4
4 2
g
S4-
S
S4
S4
60
Co
G6
Aimer Huntley Jr. Assocs. Inc.
_Surveyors Surve ors Engineers Landscape Architects
125 Pleasant St. P. O. _Box 568
NORTHAMPTON, MA 01060
(413) 584 -7444
F Low I N N PJ P *-1-4
Drs-
SLoPf
�0
G.2.NP.
Q 24.740 FE
s
CI PIN
(c fs)
Free
SrZe,
CIN)
It
29
Ho a
150
I27
130 x. c
10
(0G
234
I2�
248
)ib ,.41.
1�
15.61
o .00j
1 1 4 $(o
114.
113. 12-5,
is Ar Divl:2sION
i 3,1
bt.00.
00
1Z1.•7 3.4
I V,,to
0.00(0
0.
0.
t
1
t(4
b jNA-bi- .ALOJL aN.S k.103 STa
4
CALCULATED BY M V DATE' II"' 3
JOB
SHEET NO
CHECKED BY
SCALE
)21,`6 3.0
OF
Co o cE s 4 2' 160 c k- s (act
DATE
1(0
t(00.0
1.(00,
t( o 01 0
Goo
(00
Go
G
GC*
(o
(off
Almer Huntley Jr. Assocs. Inc. JOB D RAI P.JAe G9i..c.CLA41 a 5— ►G► ■b S
Surveyors Engineers Landscape Architects SHEET NO 5 OF
125 Pleasant St. P. O. Box 568
NORTHAMPTON, MA 01060 CALCULATED BY S M DATE I 3 49
(413) 584 -7444
2 20 cfS
CHECKED BY DATE
SCALE
M., 1 o.
(00 c fS 6 O c-Fs 'f }.t t
3 -36 CONCRETE PIPE HANDBOOK
CO
0
cam
T_
1
0
MO 13 30 H1d30
Figure 3.22. Relative Velocity and Flow in Circular Pipe
for Any Depth of Flow.
:.7
3
-J
Selection of a value fc
tial step in determining
ly high value results in
in hydraulically inadey
efficient for the exam
quantity of flow and ti
and 0.3 feet per 100fe
increased from 54 to
Values for the coef
of investigations for m
ject. Presently accept
:`Car :o he sufficient. b
mined is important
materials significantl
that is needed is the o
erties of the held inst
The difference bet‘
pt::d design alues
;,pe a t.
mately 2.5 to 3 times
In laboratory tests,
ranging between 0.00'
of smooth wall cbncra
of safety, 20 -30 perce
ratory smooth wall p
safety factors is good
recommended design.
The values for cord
of bituminous linings!
bituminous linings ha
t 9
Sewers should be de_
sewer, however. vari
velocity also change
check for self cleanin
velocity of 2 feet per
entering a storm sew
sewage, therefore a.r
ified. The dopes red
second and 3 feet pe
Table 3.5.
I
1
I
I
I
1•
..4 >w 1 i
0 4
to o III O e O0 m
0 Z 4-4 O N O U C 4 0
4�1 3 E w 3 O
a) O. U C �O a) O 0 r II O
U 0 a O .O 4.1 w y C C
O 11 c n co 0
N O
co N 0 y 4 y 4-) y m
a U. N N 4 w y w
w 0 0 O 'O 0 N N 0 4
te r U, O N
2
0 C z L 0 1 L r4 r3+ •r1
J 0 U r4 11 U C O 0 0 0
3 0 s, 0 s E J S.4
0 N N
r� aI U y. U rci us a. .--1 3..1 G)
O Q I N N N -1 4 4 y C1�
y 40 a) C U u a i H m
y y r1 C 5.4 U •.4
0 C cu r-1 N O +1 04 0 J N U U 0
y 5 1 N t1 O +1
"Cl
14 0 3 E N N• b 0 m
•'i C y
TS Cr) Et U 0 0
0 A A A b m
A C 3 >1 >r O m
�1
'CI .-1 14 r-1 r W -,4 r�-i to 41 O r1
T1 0 m w w W (33ta
p. O
JS N
m t O N s4 s4
0 N .d 4- N 0 b 4 pp r4 4) y 4 A 0 m y .45.-1 7-t m w Y� O
0 y ,CC m N O b O 1.1 'L•1 O O b '*1
.O N A 0 A N 0
Y 411 i a u 0
y N 0 L11 y 6 >4 N w +1 4. gi
ro 4
0 ms s, a 4 N S4 )4 4 y 0 0
O .-4 0
S. $.4 1.1 S.1 N'LJ cd U
4) y b 0, J O 0 0 .-1 0
tT a M N 4 C E 3 E E E 'O 0 Q
cl 4 4 O Li b
0-4 ri 0 A 0 C 4 A 0 b.
..-4 E 0 M a''c O ro
0 0 3) y- 0 2
.1 1.
--1 11 -7 J ‘-1. '13 =1 1 1
O
CU
w.
1
cu
y1 N
4.1 nS
0 al
b
4
0 T1
0
30
a P
0
C C
0 m
N 4
0 14 0
U o 01
O 0 N Id la
0 C
0 O 11 a
•r► 0 0 0
rd 4..) U B 3
4
1 O
yj r d
'o 0 0 0 0)
�C L W O 5
AdsOCIAT[D BORINGS CO., INC.
I 7 MAItIARCT CIRCLE
r NAUOATUCK. CONN. 00770
PHONIC 729-3430
'"I
r 0
1.
�12 0
0.9
1 :0 0
21 .0
BORING NO. 1
LINE a STA
OFFSET
GR. ELEV.
DATE November a, 1983
�LOWf DENSITY tL0
DENSITY A STRATUM DESCRIPTION O ST. 8 A STRATUM DESCRIPTION comsat, B
Topsoil
bar r ayey
Sand
C F. Sane r, Gray
r M -rS n Sand,
some M- F.:Gray.
tus t Br F. n
Gr. F. Sand,Tr.
Sand
tndof Boring -21.0
G'.40 13.0
Market Street Drain,
Northampton Massachusetts
PROD
T ST BORING RFP -OAT
CLItNT ALMER HUN TL JR. ASSOC- IA-TES, INI
M.Comp
Dry
12
15
M.Comp 3
ap 1 0
M.Comp 9
Wet 9-9
1 COI. A 411 ,,w, e+^ Colin, TIRTT,T, TP€ PFR FOCI'
BORING NO. 2
LINE rA STA.
OFFSET
GR. ELEV.
DATE November 8, .1983
Black M -F Si Sand
and cinders,Tr. F:
Gray. Pcs. Coal _Fra_gs
r CT a y r y e y r
Sand.
13.0.
21.5
Tr, F. S,3nd,Tr. -i-
S Fibers.
I
End of Boring -21 .-5
GWO None
No accumulation
Loose
Wet
Loose_
Loos
-Wet
2 -1
1
3 -3
4
Form 5
Commonwealth
of Massachusetts
a'r /6
From _Northam ton Conservation Commission
To Northampton Board of Pnhl i r Wnrkc
(Name of Applicant)
Address
Book
T,nrust Street, Northampton
Certificate (if registered)
___Page
The Notice of Intent for this project was filed on 1 1 29 /83
The public hearing was dosed on
Public water supply
Private water supply
Ground water supply
Flood control
19/17/$1,3
5 -1
Order of Conditions
Massachusetts Wetlands Protection Act
Q.L. c. 131, §40
Ri rhard Rnyl e
DEQE File No.
fl Storm damage prevention
Prevention of pollution
Land containing shellfish
Fisheries
(To bo provided by D
City Timm Northamntori
City D.P.W.
/9 //r //2 /i_
(Name of property owner)
Addfess Nnrthamptnn Street Easthampton,
This Order Is issued and delivered as follows:
l i by hand delivery to applicant or representative on (date)
by certified mail, return receipt requested on
(date)
This project is located at_ ea terl y of phL2l are/ Srnrther1y of the old railrnRri had
The property is recoiled at the Registry of Tiamp ch 1 r e f rn r n t y
(date)
(date)
Findings
The North amp t nn Cnn c e rva t i nn (r4 1 has reviewed the above referenced Notice or
Intent and plans and has held a public hearing on the project. Based on the information available to the
Con Rerun tinn Cnrrlmi scion at this time, the CnriTpiSs has determined that
the area on which the proposed work is to be done is significant to the following interests in accordance with
the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the
Act (check as appropriate):
Therefore, the Conservari on Commi s s i on hereby finds that the following conditions are
necessary, in accordance with the Performance Standards set forth in the regulations, to protect those inter-
ests checked above. The ConsPrva r i on Cnmrpi c i nn orders that all work shall be performed
in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the fol-
lowing conditions modify or differ from the plans, specifications or other proposals submitted with the Notice
of Intent, the conditions shall control.
General Conditions
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory meas-
ures, shall be deemed cause to revoke or modify this Order.
2. This Order does not grant any property rights or any exclusive privileges; it does not authorize any Injury
to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state or focal statutes, ordinances, by -laws or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order unless
either of the following apply:
(a) the work is a maintenance dredging project as provided for in the Act; or
(b) the time for completion has been extended to a specified date more than three years, but less than
five years, from the date of issuance and both that date and the special circumstances warranting
the extended time period are set forth in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or de-
bris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes,
refrigerators, motor vehicles or parts of any of the foregoing.
7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if
such an appeal has been filed, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or the Land
Court for the district in which the land is located, within the chain of title of the affected property. In the
case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done. In the case of registered land, the
Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which
the proposed work is to be done. The recording information shall be submitted to the Commi s s ion
on the form at the end of this Order prior to commencement of the work.
9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size
bearing the words, "Massachusetts Department of Environmental Quality Engineering,
File Number 246 -113
10. Where the Department of Environmental Quality Engineering is requested to make a determination and
to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings
and hearings before the Department.
1 1. Upon completion of the work described herein, the applicant shall forthwith request in writing that a
Certificate of Compliance be issued stating that the work has been satisfactorily completed.
12. The work shall conform to the following plans and special conditions:
5 -2
Plans:
Title Dated Signed and Stamped by: On File with:
Market St. Drainage Diversion
Crnss Cn„ntry Ont. 1983 Stephen M. Vukovich
STA. -0 +77 to STA.0 +40
Runoff Areas
Drain Profile
All of th erosion control measures inrinded in the snhmitted Notire Of Tntent
Special Conditions (Use additional paper if necessary)
1) All construction areas shall be restored to roginal condition or better
upon completion of the project, including vegetation;
2) No areas within the 100 year floodplain nor within 100 feet of a wetland
area, as defined in Chapter 131, Section 40, M.G.L., shall be permissable
disposal sites, unless otherwise approved by the Conservation Commission;
3) Excavated material and topsoil stockpiles shall be located and stabilized so
as to minimize washing into wetland areas or waterways;
4) Adequate measures shall be taken to prevent erosion and siltation of all
disturbed areas;
5) This Order Of Conditions shall apply to any successor in interest or successor
in control;
11/23/83 Appvd: S.M.V. Conservation Commission
6) Members and agents of the Conservation Commission shall have the right to
enter and inspect the premises to evaluate compliance with the Conditions
and to require the submittal of any data deemed necessary by the Commission
for that evaluation;
7) This projectbshall not .result in an increase in the flood levels,—Tno:the :old
Mi11c:River bed, which would violate. conflict with, or require an alteration
of the Assurances signed by the Mayor of Northampton on January 21, 1940
with the Army Corps of Engineers in conncection with the proposed pumping
station storage pond.
(Leave Space Blank)
5 -3A
Conservation Commission
SPECIAL CONDITIONS CONTINUED
8) There shall be an unrestricted flow•of storm water, in the old Mill River bed;
from this purposed new outfall to, and through, the existing culvert under
Pound Lane and Pleasant Street. Sid existing culvert shall Iiicleared
and made totally operational.
9) Energy Dissipator's shall be placed at the outfall to break the force of-
the storm water run -off before it reached the old Mill River bed.
1
Issued By Northa tn Conservatio. Commission Conservation Commission
9 ,1°
Signature(s)
■s'"
$a•
This Order must be signed by a majority
e Conservation Commission.
On th da of i 19 SV before me
personally appeare O_ ,.�.rrii aa!f f i I to me known to be the
son described in and who executed the foregoing Instrument and acknowledged that he /she executed
same as his /her free t and deed.
otary Public My commission expires
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land upon which the proposed work is to
be done or any ten residents of the city or town In which such land is located are hereby notified of their right to request the Department
of Environmental Quality Engineering to issue a Superseding Order, providing the request is made by certified mail or hand delivery to
the Department within ten days from the date of Issuance of this Order. A copy of the request shall at the same time be sent by certified
mall or hand delivery to the Conservation Commission and the applicant.
Detach on dotted line and submit to the Northampton Conservation Commissi gttlorto commencement ofwork.
To ;Issuing 'Authority
Please be advised that the Order of Conditions for the project at
File Number has been recorded at the Registry of and
has been noted in the chain of title of the affected property in accordance with General Condition 8 on 19
If recorded land, the instrument number which identifies this transaction is
If registered land, the document number which identifies this transaction Is
Signature
Applicant
5-4A
5 -4A