31A-139 (3) Douglas Thayer
212 Northwest Rd
Westhampton MA 01027
60 Forbes Ave
Northampton Building Department
October 15, 2013
Revision to submitted plans. (see two attached drawings)
Please see attached plans with two revisions.
1. Relocation of first floor bathroom to back left side of Kitchen.
2. Access to deck will be thru kitchen door, instead of living room.
3. Side porch size adjustment. The side porch open deck is to be resized from 6' square
to 6' wide and 3' deep.
4. The deck footing will be reduced by one, as the left side beam load will rest upon
existing "coal" shoot section of the houses main foundation.
' 1? 0
/ .
/ |
| |
- '
6 0 ho be
p)a in4cil 2Pvova 0dv� 5
_ J
Ne.w
neck
_J -
v,cluse� ic��c)7en _ 16`x `y
3cçctrs4ic -
,r19-4 l v
- ____. ,i‘ ---1.-t-, -)p‹.
0 pevl 0 01„,or-Iiqui .
Qil �,
a ":14..5i." ----- §
v/9_1,0 6
t —
1
...........m- 1,Rie 6j i il, F(6 (e-- g a,
E)65 -N) 7cl'ich
I
�r
I
Go T-701 )7e,3
e °ls/ 3
'Qeks,o P1 a 3 / 14 - / 39
o
0_
_ T
0 0