Loading...
24C-005(1) Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmillernorthamptonma.qov Thank yo _r your coop- ion on these matters. i Chuck Miller City of Northampton Assistant Commissioner and Zoning Enforcement 26. Dryer duct maximum equivalent length is 25' less 5' per 90°elbow or per manufacturer's specs. 780 CMR M1502.4.4.1, no screwed connections. 27. Markup air is required for any exhaust hood of 400 CFM or more. 780 CMR M1503.4 28. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 29. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling) and bottom (floor) plates,soffits, and every 10'within enclosed cavities.780 CMR R302. 30. Ignition barriers in place before final.780 CMR R316. 31. Dwelling/Garage fire separation. An attached garage (within 3' of main structure) is required to have%2" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have Y2" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 32. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity,which you must create. 33. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow (convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation, which is dirt filter out of the air moving through the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 34. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 35. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 36. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom,within 10' of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 37. Closets beneath stair which have doors must be drywalled with%Z".780 CMR R302.7 38. If there is mechanical equipment or a combustible roof, 30 sqft of space,and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22" x 30" is required to be located in an accessible place. It must be insulated,gasketed, and secured in place. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. a. LVLs b. I-joist and or Floor Truss c. Roof truss 14. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used.780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. NOT PNEUMATIC NAILS 15. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 16. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a shower head is used, 6'8" for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended 17. Hazardous glazing locations, within 24" of a door, or within 60" of a stair,or across from hot tubs, spas, bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4 18. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule. Order restrictors. 780 CMR R612.2 19. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310 b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at 1st floor. Minimum clear opening 20"x24" or 24"x20".780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel, opening measured from the face of the slab to the stop with door at 90 degrees,one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7%"from the top of the threshold and only in-swinging doors.780 CMR R311.3 20. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 83/4",maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30"or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle. Graspable rail 11/4" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post. 780 CMR R311.7. 21. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule.780 CMR R312.1. 22. Educate the plumber and electrician about maximum notch and hole sizes,and placement. 780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole. Notches are different. 23. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 11/2" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR R602.6.1 24. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3'clearance from windows. 780 CMR M1502.3 25. Dryer duct transition is limited to 8'of aluminum flex, must be exposed, and the proper UL listing.780 CMR M1502.4.3 City of Northampton I?%x y M,- S�`.. ,FA r' Massachusetts jj w, *'.rr /siy 9 DEPARTMENT OF BUILDING INSPECTIONS212 Main Street • Municipal Building rJGYU ^G a' d *r- Northampton, MA 01060 �Njy qr��" s INSPECTOR Forrest Devine June 30, 2013 20 Hartland Hollow Road Grandville, MA 01034 Subject Location: 285 Prospect Street Map Block: 24C-005 Mr. Devine, Your building permit application and plans dated 7-30-12 have been approved as drawn and per this memo. All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. Product literature for the wood stove being installed. 2. HERS initial and final ratings, duct blast results, and a signed Thermal Bypass Checklist. 3. A smoke/CO per code and or as noted on the plan. 4. Lateral attachment is required for each deck per section 502.2.2.3 (state is pushing these) As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://pub licecodes.cyberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC,2009 IMC, 2009 IRC, 2009 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I soils (table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR R406.2 of amendments. 6. Foundation anchor bolts must be%2" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. 8. Emergency escape is required out of every basement whether habitable or not.780 CMR R310.1 9. Ceiling joist are intended to prevent spread, once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 10. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3rd 780 CMR R802.3.1 11. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 12. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and number of jack studs required. 13. All framing materials which are not code prescriptive must have stamped engineering. ��� *(!Z of NZtilam ± m • :ca -� G ,Z = _ / y► 9 AlassaclFnsetts DEPARTMENT OF BUILDING INSPECTIONS __ 212 Main Street • •Municipal Building S`.y. ,INSPECTOR Northampton,MA 01060 LOCATION 2 U ?r ,ç>e - s e_e SQUARE FOOTAGE AMOUNT BASEMENT @ :20 96?0 1ST FLOOR @.50 / ¶2C) 2ND FLR @ 30 • 1 c 00 5- 74 c' 'A FLOORS, FINISH ATTIC,GARAGE @.20 3° / ` • Z'ac 10 DECK/PORCHES @ :20 FY 76, vc, TOTAL. A 6 73' • Wi(ii---- VIII . (0 0 Q;1 Quick Open Space Calculations Coverages 285 Prospect Cottage existing 575 Coverage Coverage Garage existing 0 Lot area existing proposed Structures existing 1875 12197 4724 4724 existing Driveway existing 2274 Open Space 7473 7473 total 4724 Open % 61.3% 61.3% Driveway new 0 Zone URB Sheds new ®0 Req'd 50% Garage new Irr_n total 4724 New C vew AY If 5-6 City of Northampton - '' Massachusetts' ' t . ( ' y,. DEPARTMENT OF BUILDING INSPECTIONS p �; 1,y� m, a�, "� 212 Main Street • Municipal Building w vd', am; Y .,x �`r'� Northampton, MA 01060 ?'c'h.,,t1~C INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footingsjbefore backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work(electrical, plumbing & gas)the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts , Department of Industrial Accidents _ Office of Investigations 600 Washington Street =r Boston MA 02111 ` www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): �Py t..&,j ( S SW[�Qt-ibN (U(�' Address: 2c ;lip? 1V-' a L.L.O t.J �GC City/State/Zip: .1 LL. - • , C i Phone#: �3- Are you an employer? Check the appropriate box: Type of project(required): 1. ■ I am a employer with 4. I am a general contractor and I 3 6. [ New construction employees (full and/or part-time).* have hired the sub-contractors 2.El am a sole proprietor or partner- have listed on the attached sheet. 7. ❑ Remodeling These sub-contractors h ship and have no employees 8. [ Demolition working for me in any capacity. employees and have workers' g Y p tY 9.j27Building addition [No workers' comp. insurance comp.insurance.t required.] 5. n We are a corporation and its 10.0 Electrical repairs or additions 3.El am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. ' r Insurance Company Name: 4 -D"0 r,,,...e V e_Sr, "t eld MA Policy#or Self-ins. Lic.#: Expiration Date: - Job Site Address: Z55.-- P p.th- City/State/Zip:VCAtIg i _ _44,6— Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date)P Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties ofperjury that the information provided above is true and correct. j Signature: %3 Date: 6/7/i3 Phone#: %3 2/y '6 Z? -- --Official use only. Do not write-in-this-area, to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: a - SECTION 8 CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Z. rre - "Peiv i MQ„_ © R5 7 Licens Number 2 o Ala -[ ' (,1, A4(.,`lc. )14,4 7 3 `/ ress Ot01y Expiration ate Z.!`T 29 Signatur• Telephone 97Req atered Home Improvement Contractor Not Applicable El V(N� L0N jc-t-to N '�.., 76'[7 Number Company`Name -- //' t�f Registration Address Ex iration ate Telephone 05 2Ir SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(MG L c 152,§25C(6)). Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes No ❑ 11 .- Home OwnerExemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside';,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature • SECTION 5-DESCRIPTION OF PROPOSED.WORK(check`all.applicable) New House n Replacement Windows Alteration(s) Roofing T Or Doors 0 Accessory Bldg. ❑ Demolition New Signs [ID] Decks [P-:r Siding[Mg Other[O] i Brief Description of Proposed ` '/ r�' Work: d • = . I, • -• - • N a &. vatyei off-whReA0u3G {b - Alteration of existing bedroom to Yes No Adding new bedroom _No Yes No Attached Narrative Renovating unfinished basement JCS Yes .itt No Plans Attached Roll -Sheet 6a If New house and or addition to existing housing complete the following: a. Use of building : One Family )0 Two Family Other b. Number of rooms in each family unit: Slajed Number of Bathrooms if c. Is there a garage attached? N0 et d. Proposed Square footage of new construction. 3O *Q Dimensions 30)(14( e. Number of stories? .�2. Ir f. Method of heating? �'orC c.( 4L0+ 4(2 * CSY Fireplaces or Woodstoves yes Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction 4/Get!, putpie. i. Is construction within 100 ft. of wetlands? Yes /0 No. Is construction within 100 yr. floodplain Yes 4 No j. Depth of basement or cellar floor below finished grade 72" k. Will building conform to the Building and Zoning regulations? )6 Yes No. I. Septic Tank City Sewer /C Private well City water Supply 10 SECTION 7a OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FORBUILDING PERMIT - I, `'ejIllto�C 1.(1 ...14 Co(- , as Owner of the subject property /` j� hereby authorize De,,4/V C ScFry ) ( 1J C_ ‘,/- a("l`� 1 t )re,, ( t to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I, re(-rev- paAil i- "1 Devi MQ Cark4frvclrtodV cc(Q41$- , as Owner/Authorized Agent hereby declare that the stateme is and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. tort " "Dec"IAl Pri ‘/ 1 Signature of 0 j�t�ent Date • c 4 Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information h Existing Proposed Required by'2oning ailL This column to be filled iixbAlOPW Building Department r2i47 1 Lot Size �- ----_ - _� Frontage Setbacks Front (20 , M Side L: 1 S '' R:' Z 1 L:I�`•,, R:=1 I i i 1 _ 3 Rear ?_ ' Building Height =1(1 a 1 zt 11 �_ Bldg. Square Footage r----1 % 1 1qq { Open Space Footage !M �e`��j} % I 3 i P ) (Lot area minus bldg&paved "7Y73 F is 3 parking) c 1 #of Parking Spaces —� Fill: i ,_. (volume&Location) -- / — --- ___ A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DON'T KNOW p YES 0 IF YES, date issued::; IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES 0 IF YES: enter Book ? Page E and/or Document#1 I B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained I Obtained , Date Issued: C. Do any signs exist on the property? YES 0 NO 0 IF YES, describe size, type and location: i YP �Cria,r"or av5 'ff pa.,�'rt, ecsifrr?N iitiesck D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO p IF YES, then a Northampton Storm Water Management Permit from the DPW is required. +, 1 Department use only RE ,... City of Northampton Status of Permit �' t nW� '''Burild'ng Department Curb 4Cut/Driveway Permits x. 1 21 Main Street Sewer/Septic Availability , c ii s WateNWell Availablty '' 1Z6 2°13 ort mRpotoom n,1M0A 0 01060 i Two Sets of Structural Plans< °FAT o'ou,L6 y;; Moue-473-5 7-1240 Fax 413-587-1272 Plot/Site Plans `11 ' g.,1;-,,'4,,F-7,''A` NoRrMaMpro,",4 , �,� Other.Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 :SITE INFORMATION - 1.1 Property Address: This section to.be completed by office :r , 28 S Pros?eo %4re.�E- p Ma Lot ",".--:.4 Unit Zone .Overlay District. ? .r .EImSt.•District- �,C13.Distncty! SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: C tr iigiNe/' G,-eA1 w4/c( 31 r-iLtry s °e Norf�q,.. � Name(Pr CurrentM f/37-72, 23y0 ng ds ;�_,� Telephone Signature , 2.2 Authorized Agent: 1 rres1' t N e.. 20 il Q {{o i6w ec(. Na (Prin Current Mailing Address: Gr+a.vi lie, µ„14- 0103V'%._Signature Telephone el/3 2/y z‘24? -SECTION 3-'ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only ." - completed by permit applicant 1. Building 5$ d o (a) Building Permit`�Fee . O UUa 2. Electrical Electrical ep o (b)'Estimated Total Cost of G•t7/ 000. Construction from (6) 3. Plumbing d• • Building Permit Fee C. id00. 4. Mechanical (HVAC) 5. Fire Protection Z.5"000. O 6. Total=(1 +2+3+4+5) i640e.'coo." Check Number J ,R 'This•Section ForOfficial`Use'Only = - , Date Building Permit Number: Issued: Signature - Building Commissioner/Inspector of Buildings Date■ d ofe., rAti avgt,„6 File#BP-2013-1245 APPLICANT/CONTACT PERSON FORREST DEVINE JEiADDRESS/PHONE 20 HARTLAND HOLLOW RD GRANVILLE (413)214-8629 1" PROPERTY LOCATION 285 PROSPECT ST MAP 24C PARCEL 005 001 ZONE URB(l00)/ V �tz. =1 'ls'� )►�:N�J� THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out /� Fee Paid / `1] 16 PJ /'a5 Typeof Construction: CONSTRUCT 2 STORY SINGLE FAMILY HOUSE&RENOVATIONS New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 95779 3 sets of Plans/Plot Plan k/eCV; i/Vs THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: (,/Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission _ Permit DPW Storm Water Management Demolition Delay Signature of Bui ding Official Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 285 PROSPECT ST BP-2013-1245 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 24C-005 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:New Single Family House BUILDING PERMIT Permit# BP-2013-1245 Project# JS-2013-000037 Est.Cost: $660000.00 Fee: $2165.60 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: FORREST DEVINE 95779 Lot Size(sq. ft.): 12240.36 Owner: IB PROPERTY HOLDINGS LLC Zoning:URB(100)/ Applicant: FORREST DEVINE AT: 285 PROSPECT ST Applicant Address: Phone: Insurance: 20 HARTLAND HOLLOW RD (413) 214-8629 GRANVILLEMA01034 ISSUED ON:8/5/2013 0:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT 2 STORY SINGLE FAMILY HOUSE & RENOVATIONS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 8/5/2013 0:00:00 $2165.60 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner