29-352 (3) a. Smokes in each bedroom,within 10' of a bedroom door,and at the bottom of a stair leading to
a finished floor above.
b. CO within 10'of bedroom doors, at each level,for every 1200 sqft,except if there are no fossil
burning fuels.
c. Heat detector in attached garage, and other large unfinished unconditioned spaces.
37. Closets beneath stair which have doors must be drywalled with%".780 CMR R302.7
38. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of
ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in
an accessible place. It must be insulated,gasketed, and secured in place.
Relevant items must be submitted to the building department for approvals before inspections and or
Certificates of Occupancy can be issued.
Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday
through Friday,8:30 am to 4:30 pm,excepting we close for walk-ins at 12:00 noon on Wednesdays. My email
address is: cmiller cni northamptonma.gov
Thank you :/or peration on these matters.
uck Mil er
City of Northampton
Assistant Commissioner and Zoning Enforcement
21. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than
30" above floor or grade within 36",4" sphere rule. 780 CMR R312.1.
22. Educate the plumber and electrician about maximum notch and hole sizes, and placement. 780 CMR
R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge,
In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge,or holes
in joist are a maximum 1/3 the depth not closer than 2"from the top or bottom or to any other hole.
Notches are different.
23. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition
requires a 16 GA 1%" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR
R602.6.1
24. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen,
and require 3' clearance from windows.780 CMR M1502.3
25. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780
CMR M1502.4.3
26. Dryer duct maximum equivalent length is 25' less 5' per 90°elbow or per manufacturer's specs.780
CMR M1502.4.4.1, no screwed connections.
27. Markup air is required for any exhaust hood of 400 CFM or more.780 CMR M1503.4
28. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work
maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors.2009 IECC
402.4.3
29. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling)and
bottom (floor) plates, soffits, and every 10'within enclosed cavities. 780 CMR R302.
30. Ignition barriers in place before final.780 CMR R316.
31. Dwelling/Garage fire separation. An attached garage (within 3' of main structure) is required to have%2"
drywall on the garage side of the separation wall and if there is a finished space above the garage all
walls must have%" drywall and the ceiling 5/8" drywall. 780 CMR R302.6
32. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC.
a. An initial HERS evaluation is required including insulation levels anticipated.
b. A final HERS evaluation confirming code requirements have been met including duct testing.
c. A signed copy of the Thermal Bypass Checklist.
d. Energy information including mechanical equipment posted on the electric panel.
e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star
Windows and the Thermal Bypass Checklist. Duct blast testing when practicable.
f. All band joist insulation must be enclosed within an air tight cavity,which you must create.
33. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is
a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air
flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion).
A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has
to be absolute and complete. If air can leak through an electrical device or through a crack it follows the
path of least resistance and carries 99%of the moisture in a structure.This is evident every time one
exposes fiberglass insulation and finds black insulation,which is dirt filter out of the air moving through
the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements.
34. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4.
35. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks
are engineered for post attachment supporting a railing.
36. Smoke and CO detectors as required. 780 CMR R314 and R315.
6. Foundation anchor bolts must be 1/2" and be embedded a minimum of 7" into the concrete. 10" bolts!
780 CMR R403.1.6
7. CMU foundations require 3/8" parging before damp proofing.780 CMR R406.1 see exceptions.
8. Emergency escape is required out of every basement whether habitable or not.780 CMR R310.1
9. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties
and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common
are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is
required with a load path to the foundation.
10. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3'1780 CMR
R802.3.1
11. Ridge boards must be the full depth of the cut. 780 CMR R802.3.
12. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and
number of jack studs required.
13. All framing materials which are not code prescriptive must have stamped engineering.
a. LVLs
b. I-joist and or Floor Truss
c. Roof truss
14. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall
method being used. 780 CMR 602.10.
a. Garage corners and large corner window/door layout may require special solutions.
b. All corners must be appropriately attached to the foundation.
c. When using PFH (R602.10.3.3)or PFG (R602.10.3.4)the nailing requirement is 4" and 3"
respectively using 8d common nails or galvanized box nails. NOT PNEUMATIC NAILS
15. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep
perforate the sheathing weakening it and contribute to building damage in high wind events.
16. Ceiling heights minimum 7'for habitable spaces, 6'8" for bathrooms includes tub/shower area if a
shower head is used, 6'8"for basements, 6'4" at beams/ducts.780 CMR R305.1. MA amended
17. Hazardous glazing locations, within 24" of a door, or within 60" of a stair, or across from hot tubs,spas,
bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4
18. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4"
sphere rule.Order restrictors. 780 CMR R612.2
19. Egress and emergency escape requirements shall be strictly met.
a. Basements, habitable attics, and all sleeping rooms require emergency escape.780 CMR R310
b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft
at 1st floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1
c. Two doors remote as possible at the normal level of travel, opening measured from the face of
the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR
R311.2
d. Landing at each door 36"out and the width of the door minimum 36", maximum step 7 3/4"from
the top of the threshold and only in-swinging doors. 780 CMR R311.3
20. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9",
maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where
the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle.
Graspable rail 1'A" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or
more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails
must be continuous and returned to the wall if not to newel post.780 CMR R311.7.
City of Northampton
s4
x ', Massachusetts �� ,#
$4
at' *
.fi�tr
• DEPARTMENT OF BUILDING INSPECTIONS t '
\fr 212 Main Street • Municipal Building
Northampton, MA 01060 �si* ��
INSPECTOR
Jeffrey Parent July 02, 2013
65 East Street
Ludlow, MA 01056
Subject Location: 32 Austin Circle, Florence, MA
Map Block: 29-352
Mr. Parent,
Your building permit application and plans dated 6-14-13 have been approved as drawn, marked up, and per
this memo. All work must meet all applicable codes whether noted or not included within this memo.
Please follow up on the following items:
These items will need to be accomplished as the project moves forward and before rough inspections;
�i_(5 1. _ - -- -• - - .: . - . - - -- -. . -
2. If the existing headers sizing is not known then the 2nd floor support structure must be designed to
spread all loads be and the 1st floor o.eniI• NeL
3. Floor and iss engineering required to be stamped,wet stamp not required.
4. Northampton is a stretch code community. 2009 IECC energy requirements, Energy Star windows,
and a signed Thermal Bypass Checklist are required.Air sealing must be completed before
permeable insulation is installed in walls and ceiling.
5. Perimeter band joist between the ceiling and new floor must be air sealed at the exterior and
interior while insulating.
6. Smoke and CO detector upgrades are required throughout the house per R315 of the MA
amendments.
7. All new bedrooms must have emergency exit windows.
8. HVAC information requires, Manual J calculations, Line drawings if warm air system,equipment
specifications.A wood stove is not an accepted method of primary heating.
9. The chimney must be extended to be 2' higher than any roof within 10'.
10. All stairs must have rails and guards. Rails terminated into newels or returned to the wall.
11. The window at the bottom of the new main stair is required to be tempered. R308.4#8.
As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments.
In the following are some generic requirements which seem to be problematic.
This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes.
Read only international codes are available on line at http://publicecodes.cvberregs.com/icod/one
must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs
The current relevant building codes are:
2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 IECC, AA115, MA amendments.
1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments.
2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements.
3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I
soils(table R405.1)
4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.
5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR
R406.2 of amendments.
CI 2009 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Wall 21.00
Floor 30.00
Ceiling/Roof 38.00
Ductwork(unconditioned spaces):
Glass & Door Rating U-Factor SHGC
Window 0.30
Door 0.32
Heating & Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments:
2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
401.3 Compliance certificate posted. ❑Complies
[F17PP ❑Does Not Comply
plot Observable
:Not Applicable
303.3 Manufacturer manuals for mechanical ❑Complies
[FI1813 and water heating equipment have ODoes Not Comply
been provided. ❑Not Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: UnfiNed.rck Page 8 of 8
2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
402.1.1, Ceiling insulation R-value.Where>R- R- R- OComplies See the Envelope Assemblies table
402.2.1, 30 is required,R-30 can be used if ❑ wood ❑ Wood ODoes Not Comply for dues.
402.2.2 insulation is not compressed at eaves. ❑ steel ❑ Steel ONot Observable
[Fig R-30 may be used for 500 ft2 or 20% ONot Applicable
<, (whichever is less)where sufficient
space is not available.
303.1.1.1, Ceiling insulation installed per OComplies
303.2 manufacturer's instructions.Blown Oboes Not Comply
[F12)1 insulation marked every 300 ft2. ONot Observable
k, ONot Applicable
402.2.3 Attic access hatch and door insulation R- R- OComplies
(F13)1 R-value of the adjacent assembly. Oboes Not Comply
ONot Observable
ONot Applicable
402.4.2, Building envelope tightness verified ACH 50= ACH 50= OComplies
402.4.2.1 by blower door test result of<7 ACH ODoes Not Comply
[FI17)1 at 50 Pa.This requirement may ONot Observable
instead be met via visual inspection, ONot Applicable
in which case verification may need to
occur during Insulation Inspection.
402.4.3 Wood burning fireplaces have OComplies
(F18)2 gasketed doors and outdoor ODoes Not Comply
combustion air. ONot Observable
ONot Applicable
403.2.2 Post construction duct tightness test cfm cfm Complies
[F1414 result of 8 cfm to outdoors,or 12 cfm Oboes Not Comply
across systems.Or,rough-in test ONot Observable
result of 6 cfm across systems or 4
cfm without air handler.Rough-in test ONot Applicable
verification may need to occur during
Framing Inspection.
403.1.1 Programmable thermostats installed (Complies
[F19)2 on forced air furnaces. Oboes Not Comply
ti; ONot Observable
ONot Applicable
403.1.2 Heat pump thermostat installed on OComplies
(Fl10]2 heat pumps. ODoes Not Comply
ONot Observable
ONot Applicable
403.4 Circulating service hot water systems OComplies
[Fillf have automatic or accessible manual Oboes Not Comply
s , controls. ONot Observable
ONot Applicable
403.9.1 Readily accessible switch on heaters (Complies
[F112)3 for swimming pools. (Does Not Comply
,_k ONot Observable
ONot Applicable
403.9.2 Timer switches on pool heaters and (Complies
[F11913 pumps are present. DDoes Not Comply
} ONot Observable
ONot Applicable
403.9.3 Heated swimming pools have a cover. OComplies
[F12013 Covers on pools heated over 90°F (Does Not Comply
are insulated to R-12. ONot Observable
It
ONot Applicable
404.1 50%of lamps in permanent fixtures OComplies
(F16)1 are high efficacy lamps. ODoes Not Comply
ONot Observable
ONot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) _
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 7 of 8
2009 IECC Insulation Inspection Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
303.1 All installed insulation is labeled or the OComplies
[1N13]2 installed R-values provided. ODoes Not Comply
k; ONot Observable
ONot Applicable
402.1,1, Floor insulation R-value. R R- OComplies See the Envelope Assemblies table
402.2.5, ❑ Wood 0 Wood ODoes Not Comply ►ar values.
402.2.6 ❑ Steel O Steel ONot Observable
[INV ONot Applicable
ta.
303.2, Floor insulation installed per OComplies
402.2.6 manufacturer's Instructions,and in ODoes Not Comply
(IN2]' substantial contact with the underside ONot Observable
;, of the subfloor. ONot Applicable
402.1.1, Wall insulation R-value.If this is a R- R- OComplies See the Envelope Assemblies table
402.2.4, mass wall with at least'/:of the wall ❑ Wood ❑ Wood ODoes Not Comply for dues.
402.2.5 insulation on the wall exterior,the 0 Mass ❑ Mass ONot Observable
[IN3]' exterior insulation requirement ❑ Steel ❑ Steel ONot Applicable
applies.
303.2 Wall insulation is Installed per OComplies
[1N4]' manufacturer's instructions. ODoes Not Comply
kit ONot Observable
ONot Applicable
402.2.11 Sunroom wall insulation has a R- R- OComplies
[IN8]' minimum R-value of R-13.New walls ODoes Not Comply
separating the sunroom from ONot Observable
conditioned space must meet code ONot Applicable
requirements.
303,2 Sunroom wall insulation installed per OComplies
[1N9]1 manufacturer's Instructions, Oboes Not Comply
4;, ONot Observable
ONot Applicable
402.2.11 Sunroom ceiling minimum insulation R- R- OComplies
[IN1011 R-value of R-19 in Climate Zones 1-4, ODoes Not Comply
and R-24 in Climate Zones 5-8. ONot Observable
Ai
ONot Applicable
303.2 Sunroom ceiling insulation is installed OComplies
(IN11]' per manufacturer's instructions. ODoes Not Comply
t, ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 1 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 6 of 8
1 High Impact(Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 5 of 8
Aissimsesmip
2009 IECC Framing i Rough-In Inspection Plans Verified Field Verified Compiles? Comments/Assumptions
Value Value
402.1.1, Door U-factor. U- U- OComplies See the Envelope Assemblies table
402.3.4 ODoes Not Comply for values.
[FR1]' ONot Observable
ONot Applicable
402.1.1, Glazing U-factor(area-weighted U- U- OComplies See the Envelope Assemblies table
402.3.1, average). ODoes Not Comply for values.
402.3.3, ONot Observable
402.5 ONot Applicable
[FR2]'
303.1.3 U-factors of fenestration products are OComplies
[FR4]' determined in accordance with the ODoes Not Comply
ix; NFRC test procedure or taken from ONot Observable
the default table. ONot Applicable
402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies
(FR811 space have a maximum fenestration ODoes Not Comply
U-factor of 0.50 in Climate Zones 4-8. ONot Observable
New glazing separating the sunroom
g 9 ONot Applicable
from conditioned space must meet
code requirements.
402.3.5 Sunrooms enclosing conditioned U- U- OComplies
[FR9]' space have a maximum skylight U- ODoes Not Comply
factor of 0.75 in Climate Zones 4-8. ONot Observable
:Not Applicable
402.4.4 Fenestration that is not site built is OComplies
[FR2011 listed and labeled as meeting ODoes Not Comply
AAMA/WDMA/CSA 101/I.S.2/A440 or ONot Observable
has infiltration rates per NFRC 400 ONot Applicable
that do not exceed code limits.
402.4.5 IC-rated recessed lighting fixtures OComplies
(FR1612 sealed at housing/interior finish and ODoes Not Comply
labeled to indicate 2.0 cfm leakage at ONot Observable
1# 75 Pa.
ONot Applicable
403.2.1 Supply ducts in attics are insulated to R- R- OComplies
FFR121' R-8.All other ducts in unconditioned R. R- ODoes Not Comply
spaces or outside the building ONot Observable
k€
envelope are insulated to R-6.
pe :Not Applicable
403.2.2 All joints and seams of air ducts,air Complies
(FR131' handlers,filter boxes,and building ODoes Not Comply
cavities used as return ducts are ONot Observable
sealed.
ONot Applicable
403.2.3 Building cavities are not used for OComplies
(FR15)3 supply ducts. ODoes Not Comply
4, ONot Observable
:Not Applicable
403.3 HVAC piping conveying fluids above R- R- OComplies
[FR17]2 105°F or chilled fluids below 55°F ODoes Not Comply
are insulated to R-3. ONot Observable
ONot Applicable
403.4 Circulating service hot water pipes are R- R- OComplies
[FR1812 insulated to R-2. ODoes Not Comply
ONot Observable
vt ONot Applicable
403.5 Automatic or gravity dampers are OComplies
jFR19j2 installed on all outdoor air intakes and ODoes Not Comply
exhausts. [Not Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 4 of 8
2009 IECC Foundation Inspection Complies? Comments/Assumptions
303:2.1 A protective covering is installed to protect °Complies
[FO11)? exposed exterior insulation and extends a ❑Does Not Comply
minimum of 6 in.below grade. ( Not Observable
ONot Applicable
403.8 Snow-and ice-melting system controls °Complies
[FO1212 installed. ODoes Not Comply
ONot Observable
:Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low impact(Tier 3)
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 3 of 8
cidREScheck Software Version 4.4.4
Inspection Checklist
Requirements: 0.0% were addressed directly in the REScheck software
Text in the"Comments/Assumptions"column is provided by the user in the REScheck Requirements screen.For each requirement,the
user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance
is itemized in a separate table,a reference to that table is provided.
2009 IECC Pre-Inspection/Plan Review Plans Verified Field Verified Complies? Comments/Assumptions
Value Value
103.2 Construction drawings and ❑Complies
[PR1J1 documentation demonstrate energy ODoes Not Comply
code compliance for the building ❑Not Observable
envelope. [Not Applicable
103.2, Construction drawings and ❑Complies
403.7 documentation demonstrate energy ❑Does Not Comply
(PR3J' code compliance for lighting and ❑Not Observable
a$; mechanical systems.Systems serving :Not Applicable
multiple dwelling units must
demonstrate compliance with the
commercial code.
403.6 Heating and cooling equipment is Heating: Heating: ❑Complies
[PR212 sized per ACCA Manual S based on Btu/hr Btu/hr ❑Does Not Comply
l ; loads per ACCA Manual J or other Cooling: Cooling: :Not Observable
approved methods. Btu/hr Btu/hr :Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 2 of 8
c j.
REScheck Software Version 4.4.4
Compliance Certificate
Project Title: Kolakoski Addition
Energy Code: 2009 IECC
Location: Northampton,Massachusetts
Construction Type: Singe-family
Project Type: Addition
Heating Degree Days: 6404
Climate Zone: 5
Permit Date:
Construction Site: Owner/Agent: Designer/Contractor:
32 Austin Circle
Florence,MA
Compliance: Passes using UA trade-off
Compliance: 7.3%Better Than Code Maximum UA: 124 Your UA:115
The%Better or Worse Than Code Index reflects how dose to compliance the house is based on code trade-ot rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Cavity Cont. Glazing
Assembly Area or or Door UA
Perimeter R-Value R-Value U-Factor
Ceiling 1:Raised or Energy Truss 1,000 38.0 0.0 25
Wall 1:Wood Frame, 16"o.c. 1,170 21.0 0.0 62
Window 1:Wood Frame:Double Pane with Low-E 82 0.300 25
Door 1:Solid 6 0.320 2
Floor 1:All-Wood Joist/Truss:Over Outside Air 40 30.0 0.0 1
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations
submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.4 and to
comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Kolakoski Addition Report date: 06/13/13
Data filename: Untitled.rck Page 1 of 8
Page 3
55. Supply& Install new Berber carpet in all bedrooms, hallways and closets on the new
second floor. Carpet allowance is$9.00 a yard.
56. Supply and install (3)smoke detectors and(1) Carbon Monoxide detector.
57. Supply& Paint(2) coats on all ceilings with Behr Flat white ceiling paint.
58. Supply&Paint(2)coats on all walls with(1) Standard color Eggshell Behr Paint.
59. Install Owner Supplied light fixtures in all rooms except Bedroom(3) & (4)
closets.
60. Supply and install (2)new energy efficient single light closet lights in Bed (3)and
Bed (4)closets.
61. Supply and install (1)new 36"Oak Bath Vanity in the new second floor bathroom.
62. Supply and install (1)new Granite Bath Vanity top in the second floor bathroom.
63. Supply& Install new 8"Brushed Nickel Delta Faucet in said Vanity Top. Allowance
$110.00
64. Supply& Install new Standard Oval Gerber Toilet with Slow closing toilet seat.
65. Disposal of all debris removed and generated from said work.
66. Install new maple stair treads going from the first floor to the second floor with
having primed pine risers to finish the stairs.
Includes: Building Permit.
Exclusions:
• Supplying Light Fixtures / Fans for the second floor. Theses
fixtures must be supplied by owner in a timely fashion when
needed. Contractor will give owner (5) business days
notification when needed.
• Finishes on the first floor above and beyond the aforementioned
scope of work.
• Interior closet finishes such as closet poles and shelving in the
master closet.
• Landscaping for areas needed for construction of the new
second floor.
• Stretch Code Pressure Testing if Required.
If you choose to complete the painting yourself on the second floor and
stairway to the second floor please deduct $4,500 from the contract
price.
a_./15
arakoski Date:
Pa••nt Da e:
Office: (413)610-0818 Fax: (413) 610-0414
Page 2
27. Install new 3/4"Tongue and Groove plywood glued to the floor joists with PL 400
adhesive.
28. Move existing electrical feed from the street to the home up to the newly constructed
second level approximately 10'.
29. Construct new 2" x 4" spruce stud interior walls as outlined in the plans.
30. Supply&Install new service wire and 50 Amp electrical sub-panel on the new
proposed second floor to accommodate for new electrical outlets,lights and switches.
31. Supply& Install new rough wiring throughout the new second floor to meet state
code requirements for outlets.
32. Supply& Install (1)ceiling fan box connection in each of the bedrooms on the
second floor with having(1) switch to control both light and fans.
33. Supply and install (1) 75 CFM Bath/Fan combo in the new second floor bathroom
with having(1) switch to control both fan and light.
34. Supply and Install (1) light connection with a(3)way switch in the new second floor
hallway.
35. Supply and Install (1) overhead closet light connection with (1) switch in the new
second floor master closet.
36. Supply& Install new GFI outlet over the new vanity on the second floor bathroom.
37. Supply& Install new vanity light connection over the new vanity on the second floor.
38. Supply& Install rough wiring and boxes for smoke/carbon monoxide detectors.
39. Supply& Install new rough plumbing(water lines and drain lines) from the basement
to the second floor to accommodate (1)new toilet, vanity and tub/shower.
40. Supply and install (1) new standard Sterling tub/shower.
41. Supply and install new Brushed Nickel Delta Shower/Tub Valve in the new second
floor Tub/Shower. Allowance for the Valve is$150.00.
42. Install new R-20 Unfaced batt insulation at all exterior walls of the new second floor.
43. Install new Poly over the second floor exterior studs and newly installed batt
insulation.
44. Supply& Install new 'A"drywall on all walls of the new addition except for the
bathroom area.
45. Supply& Install new '/z"Green board Moisture resistant drywall within the bathroom
area.
46. Supply& Install new 5/8"drywall over all the ceiling areas except the bathroom.
47. Supply& Install new 5/8"drywall over the ceiling area of the bathroom.
48. Supply& Install (1) coat of joint compound with seam tape at all seams including
inside and outside corners.
49. Install (2)additional coats of joint compound over said tape and sand when
completely dries.
50. Supply& Install new R-38 Blown in insulation in the new second floor attic space.
51. Supply&Install (6)new solid core raised panel split jamb molded white doors at all
bedrooms,master closet and bathroom.
52. Supply& Install new 12"x 12"ceramic tile in the second floor bathroom area.
Allowance on the tile is$3.00 per square foot.
53. Supply& Install new Ranch Style baseboard along all walls on the new second floor.
54. Supply& Install new Colonial Style casings around all windows on the new second
floor
Office: (413) 610-0818 Fax: (413) 610-0414
Construction ®, LLC
65 East St,
Ludlow, MA 01056
Exhibit "A "
1. Remove existing trusses from the existing structure.This will consist of cutting the
top cord and the webbing, leaving the bottom cord in place over the main floor walls.
2. Install new 9 '/2" IB 400 floor Joists 16"on center over the main floor walls(interior
&exterior) approximately 26' long from one end of the existing home to the other.
3. Install new 1 3/4"pre-engineered rim board around the perimeter.
4. Install new 3/4' Advantek plywood over the new IB 400 floor joists with gluing the
plywood to the floor joist with PL400 adhesive.
5. Frame new 2"x 6"exterior walls 8' high on the front, back and two sides to create
the second floor.
6. Install new Y2"zip board over newly framed exterior walls.
7. Install new zip tape over all wall seams.
8. Install new 6 on 12 pitch common trusses with (2) gable end trusses over the newly
framed walls.
9. Install new 7/16"zip board over the new roof trusses.
10. Install 2"x 6" spruce board at the fascia and rake edge creating a 1' over hang.
11. Install new Ice& Watershield 3' up along the bottom edge.
12. Install new drip edge around all edges.
13. Install new 40yr GAF Timbeline Architectural shingles (color of owners choice)
14. Install new ridge vent over the entire ridge area except the last 18" on each side.
15. Install new Cap shingles over entire ridge.
16. Install (9)Double Hung Low-E Argon Filled Anderson Windows Series 200 (size 29
'A"x 47 3/4").
17. Install (1)Low-E Argon filled Triple Size window with(2) side flanks that will be
double hung and one center fixed picture glass.
18. Install new vinyl J-Channel around all windows, soffit areas,and rake edges.
19. Install new double four vinyl siding to match existing color and style as much as
possible starting from where the existing home siding ends. Price per square not to
exceed $90.00 per sq.
20. Install new 18"x 24" gable vent at both gable ends.
21. Install new white Vinyl solid vented solid soffit panels along the 1' overhang at the
soffit area.
22. Install new white Vinyl solid soffit along all rake edges.
23. Install new white aluminum at all fascia's and rake edges.
24. Install existing gutters and downspouts at the front and back of the new second floor
with adding extenders of the downspouts to meet ground level.
25. Cut out existing ceiling area and first floor flooring to except new stairs leading to the
second floor and basement within the proposed office space. Install new 2"x 12"
spruce stair stringers with having new 2"x 10" spruce stair treads leading down to
the basement.
26. Box out the existing basement stairs with new 2" x 10" floor joists.
. ............. .
Office: (413) 610-0818 Fax: (413) 610-0414
Page 1
4. Contractor shall furnish Owner appropriate releases or waivers of lien for all work
performed or materials provided at the time of final payment.
5. All change orders shall be in writing and signed both by Owner and Contractor, and shall
be incorporated in, and become part of the contract.
6. Contractor warrants it is adequately insured for injury to its employees and others
incurring loss or injury as a result of the acts of Contractor or its employees or sub-
contractors.
7. Contractor shall at its own expense obtain all permits necessary for the work to be
performed.
8. Contractor agrees to remove all debris and leave the premises in broom clean condition.
9. In the event Owner shall fail to pay any periodic or installment payment due hereunder,
Contractor may cease work without breach pending payment or resolution of any
dispute.
10. All disputes hereunder shall be resolved by binding arbitration in accordance with rules
of the American Arbitration Association.
11. Contractor shall not be liable for any delay due to circumstances beyond its control
including strikes, casualty or general unavailability of materials.
12. Contractor warrants all work for a period of 12 months following completion.
Signed this day of June 22, 2013.
Name of Owner: Mic, - Kolakoski/ Date : C,/Lz..I t 3
By (Signature): C 1
Name of Contractor: D.L. Construction 8 LLC
} r
By (Signature): ♦..; _ — .�
Street Address: "ast St.
City/State/Zip: Ludlow, Ma. 01056
Telephone No.: (413) 610-0818
Contractor's Licenser No.: CS-078212
License # CS 078212 Page 2
9
H. D. L. Construction Co•, LLC
Contract Agreement
THIS AGREEMENT made 22th day of June, 2013 by and between H.D.L Construction Co.,
LLC., hereinafter called the Contractor and Michael Kolakoski, hereinafter called the Owner.
Article 1. Scope of the Work
The Contractor shall furnish all of the materials and perform all of the work shown on the
Drawings and/or described in the Specifications entitled Exhibit A, as annexed hereto as it
pertains to work to be performed on property at 32 Austin Circle Florence, MA 01062.
Article 2. Time of Completion
The work to be performed under this Contract shall be commenced on or before July 22, 2013
and shall be substantially completed on or before September 2, 2013. Time is of the essence.
The following constitutes substantial commencement of work pursuant to this proposal and
contract.
Article 3. The Contract Price
The Owner shall pay the Contractor for the material and labor to be performed under the
Contract the sum of Seventy Seven Thousand and Forty Dollars ($77,040.00), subject to
additions and deductions pursuant to authorized change order.
Article 4. Progress Payments
Payments of the Contract Price shall be paid in the manner following:
$5,000.00 at the signing of the contract.
$20,680.00 7-10 after signing the contract.
$25,680.00 once the structure is erected.
$15,000.00 once the drywall is hung and taped.
$10,680.00 upon completion
Article 5. General Provisions
Any alteration or deviation from the above specifications, including but not limited to any such
alterations of deviation involving additional material and/or labor costs, will be executed only
upon written order for same, signed by Owner and Contractor, and if there is any charge for
such alteration or deviation, the additional charge will be added to the contract price of this
contract. If payment is not made when due, Contractor may suspend work on the job until such
time as all payments due have been made.A failure to make payments for a period in excess of
30 days from the due date of the payment shall be deemed a material breach of this contract.
In addition, the following general provisions apply:
1. All work shall be completed in a workman-like manner and in compliance with all building
codes and other applicable laws.
2. To the extent required by law all work shall be performed by individuals duly licensed
and authorized by law to perform said work.
3. Contractor may at its discretion engage sub-contractors to perform work hereunder,
provided Contractor shall fully pay said sub-contractor and in all instances remain
responsible for the proper completion of this Contract.
Page 1
65 East St. Ludlow, MA 01056 Pa g
License#CS 078212
• 1
■ I
I -...
. .....,..... ...........-..■...
til
■
,,,„......-..,...-......... 1
. :
■
■
,.---.......■--.. ..... .
■
is
1
I -
j
,---
,---
J 3 .
3 3
I) r
4(.. ...E. i
- i
-,,
-'"C i 1 - .• I
0) t - ..---
, ; '..; ..--
1 .--
,---0 ,
-. .
-r-
- 1
Ft
j
1
,.,. ,-----
, 1
g ., c) ■
(
Q:7 if .,
..',
. ' s
CI ' .....
5
-, -
r,
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House ❑ Addition ❑ Replacement Windows Alteration(s) 0 Roofing J
Or Doors I]
Accessory Bldg. ❑ Demolition ❑ New Signs ED] Decks [❑ Siding[D] Other[El
Work:Description 2nd Proposed a. <csu� �,.� +, 'vr.��
W Ork: lnslalling a new 2nd floor Addition consisting of 3 Bedrooms and a bathroom. � �f„ ', > � �L{j„t`fie
Alteration of existing bedroom Yes R No Adding new bedroom Yes A No
Attached Narrative Renovating unfinished basement Yes x No
Plans Attached Roll -Sheet
6a. If New house and or addition to existing housing, complete the following:
a. Use of building: One Family X Two Family Other
b. Number of rooms in each family unit: 6 Number of Bathrooms 3
c. Is there a garage attached? no
d. Proposed Square footage of new construction. 1000 Sq. Ft Dimensions
e. Number of stories? 2nd(proposed)
f. Method of heating? Wood Stove Fireplaces or Woodstoves 1 Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? yes
h. Type of construction Wood
i. Is construction within 100 ft.of wetlands? Yes X No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No.
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
, as Owner of the subject
property
hereby authorize
to act on my behalf, in all matters relative to work authorized by this building permit application.
Signature of Owner Date
I, ! a,•,—et=. C.-05 c _ ,as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury. *�
eio Name
„11.1P
' ��\mow... .
r' t ',Own- Age t Date
Imukw
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size #if
Frontage \` 1
Setbacks Front
Side L: 5c R: L: R:
Rear
Building Height t '`
Bldg.Square Footage 1000 % 1000
Open Space Footage
(Lot area minus bldg&paved
parking)
#of Parking Spaces
Fill:
(volume&Location)
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO 0 DONT KNOW 0 YES 0
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DONT KNOW O YES
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW ® YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained O Obtained ® , Date Issued:
C. Do any signs exist on the property? YES ® NO 0
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? YES ® NO 0
IF YES, describe size, type and location:
E. Will the construction activity disturb(clearing, grading,excavation, or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES ® NO Q
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
AFR-16-2813 15:35 From:413-583-6511 Pase:1%1
HDLCO-1 OP ID: DC
.4t tJRO' CERTIFICATE OF LIABILITY INSURANCE DAT`(MM/
04116/2013 2013
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER,
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(ies)must bo endorsed. If SUBROGATION IS WAIVED,subject to
the terms and conditions Of the policy,certain policies may require on endorsement. A statement on this certificate does not confer rights to the
certificate holder In lieu of such endorsement(s).
PRODUCER Phone:413.589-0901--FaTeCT
Ideal Insurance Agency,Inc. Fax:413-583-651 1 PHONE (FAX No):
187 East St rA+C.No.Ex();
Ludlow,MA 01056 E-MAIL
ADDRESS:
INSURER(S)AFFORDING COVERAGE NAIL#
INSURER A:Atlantic Casualty Insurance Co
INSURED HDL Construction Co.LLC
INSURER 8:
65 ast Streat
INSURER C:
Ludlow, MA 01056 --
INSURER D:
INSURER E:
INSURER F
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT TI IC POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RFRPFCT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
iLTR TYPE OF INSURANCE -_ INSRL JWYD I POLICY NUMBER (MMNDY/YOFF-Y) (MMIDD/Y Y'n f LIMITS - -----— ----_
GENERAL UABILrtY ( I I EACH OCCURRENCE 5 1.000,000
A X COMMERCIAL GENERAL LIABILITY (L021008001 II 12/17/2012 12/17/201$ PREMISES fi(Ea ncn} 5 50,00
CLAIMS-MADE X I OCCUR i { MED EXP(Any one person) S 5,000
PERSONAL SADVINJURY S1,000,000
GENERAL AGGREGATE $ 2,000,000
GFN.AGGREGATE LIMIT APPLIES PEN. PRODUCTS-COMP/0P AGO I S 2,000,000
.Y1 PourY I IF T LOC 1$
COMBINED SINGLE LIMIT a
AUTOMOBILE LIABILITY
(EA decl0eni) ....
ANY AUTO BODILY INJURY(Per person) —S
ALL OWNW ' SCHEDULED BODILY INJURY(Per accident) S
AUTOS i IAUTOS
HIRED AUI O:: AUTOS ccIPROPFRTY DAMAGF a --
(Per
UMBRELLA LAB OCCUR i jLACH OCCURRENCE $
EXCESS UAB j CLAIMS-MADE I !AGGREGATE $
DED I I RETENTIONS
WORKERSCOMYENSATION 1 ORYLI IU- `Ulti-
AND EMPLOYERS'LIABILITY I I l TORYI,Ih11T3, ...l_ER
Y I N
ANY PROPRIETOR/PARTNEREEXECUTIVE ( E.L.EACH ACCIDENT S.
OfFICERIMEMBER EXCLUDED? N r A
(Mandatory In NH) I E L.DISEASE-EA EMPLOYEES _
If n,.,dr nrribo urdnr 1 I
DESCRIPTION OF OPERATIONS below i I t DISEASE•POLICY LIMIT 5
•
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Att"ach ACORD 101.AdLIIEOnal Remerxa Schedule,If more apace IS required)
REMODELING CONTRACTOR, ROOFING
CERTIFICATE HOLDER CANCELLATION
INSRECD
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
FOR INSURED'S RECORD ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED jjREPRESENTATIVE
2 RI�
(g)1088-2010 ACORD CORPORATION. All rights reserved.
ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder: C 7 2,a\'r'�
t \ License Number
•�
ss
Expiration ate
cp-
r-ign1 111110 Telephone
9.Registered Home Impr ent Contractor: Not Applicable ❑
Company Name s., s . Registration Number
to 41 �a - t ��, rte- . c� k\"A\ac��
Address Expiration Date
Telephone U.\2,..t td�
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes A No ❑
11. - Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
1
Department use only
City of Northampton Status of Permit:
Building Department Curb Cut/Driveway Permit
r 212 Main Street Sewer/Septic Availability
Room 100 Water/Well Availability
1 N rthampton, MA 01060 Two Sets of Structural Plans
> 2 6 ? dne 41 587-1240 Fax 413-587-1272 Plot/Site Plans
Other Specify
i piNG I.+
o§ fi • . = UCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
This section to be completed by office
1.1 Property Address: 2> �,. � C
Map Lot Unit
cs.r
Zone Overlay District
Elm St.District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Mike Kolakoski 32 Austin Circle Florence,MA 01062
Name(Print) Current Mailing Address:
(413)250-7401
Telephone
Signature
2.2 Authorized Agent:('l C
N.Si (Print) Current Mailing Address:
_oz,c,
Sign.r Telephone
ON 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by permit applicant
1. Building 61,040 (a) Building Permit Fee
2. Electrical 8,500 (b) Estimated Total Cost of
Construction from(6)
3. Plumbing 7,500 Building Permit Fee
4. Mechanical(HVAC)
5. Fire Protection /4(73 04 -
6. Total=(1 +2+3+4+5) 77,040 Check Number
This Section For Official Use Only
Building Permit Number: Date
Issued:
Signature:
Building Commissioner/Inspector of Buildings Date
File#BP-2013-1244 O ∎ aC�
APPLICANT/CONTACT PERSON JEFFREY PARENT i
NA
ADDRESS/PHONE 65 EAST ST LUDLOW (413)610-0818 0 L
PROPERTY LOCATION 32 AUSTIN CIR _ p
ti MAP 29 PARCEL 352 001 ZONE j �e „ r cots
THIS SECTION FOR OFFICIAL USE ONLY:
Ne(fr-)EaPERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out ?
Fee Paid 1 v L1(
Typeof Construction: CONSTRUCT 000 SQ FT 2ND STORY ADDITION(3 BEDRMS&BATH) 1 �9 two
New Construction ^\ e
Non Structural interior renovations
/ '�
Addition to Existing � �
Accessory Structure �
w�� /'
Building Plans Included: I" _ Y
Owner/Statement or License 078212
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
IN �( MATION PRESENTED:
//Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission _ Permit DPW Storm Water Management
D-. o ition Delay
Signa re of Building Official Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
32 AUSTIN CIR BP-2013-1244
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 29-352 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: ADDITION BUILDING PERMIT
Permit# BP-2013-1244
Project# JS-2013-002053
Est. Cost: $77040.00
Fee: $462.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: JEFFREY PARENT 078212
Lot Size(sq. ft.): 15638.04 Owner: KOLAKOSKI MICHAEL J&ERICA L TRUDELL
Zoning: Applicant: JEFFREY PARENT
AT: 32 AUSTIN CIR
Applicant Address: Phone: Insurance:
65 EAST ST (413) 610-0818 () Liability
LUDLOWMA01056 ISSUED ON:7/11/2013 0:00:00
TO PERFORM THE FOLLOWING WORK:CONSTRUCT 1000 SQ FT 2ND STORY
ADDITION (3 BEDRMS&BATH)
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building $462.00 . / • 'f
212 Main Street,Phone(413)587-1240,Fax: (413) 587-1272
Louis Hasbrouck—Building Commissioner