Loading...
29-352 (3) a. Smokes in each bedroom,within 10' of a bedroom door,and at the bottom of a stair leading to a finished floor above. b. CO within 10'of bedroom doors, at each level,for every 1200 sqft,except if there are no fossil burning fuels. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 37. Closets beneath stair which have doors must be drywalled with%".780 CMR R302.7 38. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in an accessible place. It must be insulated,gasketed, and secured in place. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday,8:30 am to 4:30 pm,excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmiller cni northamptonma.gov Thank you :/or peration on these matters. uck Mil er City of Northampton Assistant Commissioner and Zoning Enforcement 21. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule. 780 CMR R312.1. 22. Educate the plumber and electrician about maximum notch and hole sizes, and placement. 780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge,or holes in joist are a maximum 1/3 the depth not closer than 2"from the top or bottom or to any other hole. Notches are different. 23. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1%" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR R602.6.1 24. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3' clearance from windows.780 CMR M1502.3 25. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780 CMR M1502.4.3 26. Dryer duct maximum equivalent length is 25' less 5' per 90°elbow or per manufacturer's specs.780 CMR M1502.4.4.1, no screwed connections. 27. Markup air is required for any exhaust hood of 400 CFM or more.780 CMR M1503.4 28. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors.2009 IECC 402.4.3 29. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling)and bottom (floor) plates, soffits, and every 10'within enclosed cavities. 780 CMR R302. 30. Ignition barriers in place before final.780 CMR R316. 31. Dwelling/Garage fire separation. An attached garage (within 3' of main structure) is required to have%2" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have%" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 32. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity,which you must create. 33. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation,which is dirt filter out of the air moving through the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 34. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 35. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks are engineered for post attachment supporting a railing. 36. Smoke and CO detectors as required. 780 CMR R314 and R315. 6. Foundation anchor bolts must be 1/2" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing.780 CMR R406.1 see exceptions. 8. Emergency escape is required out of every basement whether habitable or not.780 CMR R310.1 9. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 10. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3'1780 CMR R802.3.1 11. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 12. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and number of jack studs required. 13. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. I-joist and or Floor Truss c. Roof truss 14. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3)or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. NOT PNEUMATIC NAILS 15. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 16. Ceiling heights minimum 7'for habitable spaces, 6'8" for bathrooms includes tub/shower area if a shower head is used, 6'8"for basements, 6'4" at beams/ducts.780 CMR R305.1. MA amended 17. Hazardous glazing locations, within 24" of a door, or within 60" of a stair, or across from hot tubs,spas, bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4 18. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule.Order restrictors. 780 CMR R612.2 19. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape.780 CMR R310 b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at 1st floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel, opening measured from the face of the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36"out and the width of the door minimum 36", maximum step 7 3/4"from the top of the threshold and only in-swinging doors. 780 CMR R311.3 20. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle. Graspable rail 1'A" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post.780 CMR R311.7. City of Northampton s4 x ', Massachusetts �� ,# $4 at' * .fi�tr • DEPARTMENT OF BUILDING INSPECTIONS t ' \fr 212 Main Street • Municipal Building Northampton, MA 01060 �si* �� INSPECTOR Jeffrey Parent July 02, 2013 65 East Street Ludlow, MA 01056 Subject Location: 32 Austin Circle, Florence, MA Map Block: 29-352 Mr. Parent, Your building permit application and plans dated 6-14-13 have been approved as drawn, marked up, and per this memo. All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; �i_(5 1. _ - -- -• - - .: . - . - - -- -. . - 2. If the existing headers sizing is not known then the 2nd floor support structure must be designed to spread all loads be and the 1st floor o.eniI• NeL 3. Floor and iss engineering required to be stamped,wet stamp not required. 4. Northampton is a stretch code community. 2009 IECC energy requirements, Energy Star windows, and a signed Thermal Bypass Checklist are required.Air sealing must be completed before permeable insulation is installed in walls and ceiling. 5. Perimeter band joist between the ceiling and new floor must be air sealed at the exterior and interior while insulating. 6. Smoke and CO detector upgrades are required throughout the house per R315 of the MA amendments. 7. All new bedrooms must have emergency exit windows. 8. HVAC information requires, Manual J calculations, Line drawings if warm air system,equipment specifications.A wood stove is not an accepted method of primary heating. 9. The chimney must be extended to be 2' higher than any roof within 10'. 10. All stairs must have rails and guards. Rails terminated into newels or returned to the wall. 11. The window at the bottom of the new main stair is required to be tempered. R308.4#8. As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://publicecodes.cvberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 IECC, AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I soils(table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR R406.2 of amendments. CI 2009 IECC Energy Efficiency Certificate Insulation Rating R-Value Wall 21.00 Floor 30.00 Ceiling/Roof 38.00 Ductwork(unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.30 Door 0.32 Heating & Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments: 2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions Value Value 401.3 Compliance certificate posted. ❑Complies [F17PP ❑Does Not Comply plot Observable :Not Applicable 303.3 Manufacturer manuals for mechanical ❑Complies [FI1813 and water heating equipment have ODoes Not Comply been provided. ❑Not Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: UnfiNed.rck Page 8 of 8 2009 IECC Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions Value Value 402.1.1, Ceiling insulation R-value.Where>R- R- R- OComplies See the Envelope Assemblies table 402.2.1, 30 is required,R-30 can be used if ❑ wood ❑ Wood ODoes Not Comply for dues. 402.2.2 insulation is not compressed at eaves. ❑ steel ❑ Steel ONot Observable [Fig R-30 may be used for 500 ft2 or 20% ONot Applicable <, (whichever is less)where sufficient space is not available. 303.1.1.1, Ceiling insulation installed per OComplies 303.2 manufacturer's instructions.Blown Oboes Not Comply [F12)1 insulation marked every 300 ft2. ONot Observable k, ONot Applicable 402.2.3 Attic access hatch and door insulation R- R- OComplies (F13)1 R-value of the adjacent assembly. Oboes Not Comply ONot Observable ONot Applicable 402.4.2, Building envelope tightness verified ACH 50= ACH 50= OComplies 402.4.2.1 by blower door test result of<7 ACH ODoes Not Comply [FI17)1 at 50 Pa.This requirement may ONot Observable instead be met via visual inspection, ONot Applicable in which case verification may need to occur during Insulation Inspection. 402.4.3 Wood burning fireplaces have OComplies (F18)2 gasketed doors and outdoor ODoes Not Comply combustion air. ONot Observable ONot Applicable 403.2.2 Post construction duct tightness test cfm cfm Complies [F1414 result of 8 cfm to outdoors,or 12 cfm Oboes Not Comply across systems.Or,rough-in test ONot Observable result of 6 cfm across systems or 4 cfm without air handler.Rough-in test ONot Applicable verification may need to occur during Framing Inspection. 403.1.1 Programmable thermostats installed (Complies [F19)2 on forced air furnaces. Oboes Not Comply ti; ONot Observable ONot Applicable 403.1.2 Heat pump thermostat installed on OComplies (Fl10]2 heat pumps. ODoes Not Comply ONot Observable ONot Applicable 403.4 Circulating service hot water systems OComplies [Fillf have automatic or accessible manual Oboes Not Comply s , controls. ONot Observable ONot Applicable 403.9.1 Readily accessible switch on heaters (Complies [F112)3 for swimming pools. (Does Not Comply ,_k ONot Observable ONot Applicable 403.9.2 Timer switches on pool heaters and (Complies [F11913 pumps are present. DDoes Not Comply } ONot Observable ONot Applicable 403.9.3 Heated swimming pools have a cover. OComplies [F12013 Covers on pools heated over 90°F (Does Not Comply are insulated to R-12. ONot Observable It ONot Applicable 404.1 50%of lamps in permanent fixtures OComplies (F16)1 are high efficacy lamps. ODoes Not Comply ONot Observable ONot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) _ Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 7 of 8 2009 IECC Insulation Inspection Plans Verified Field Verified Complies? Comments/Assumptions Value Value 303.1 All installed insulation is labeled or the OComplies [1N13]2 installed R-values provided. ODoes Not Comply k; ONot Observable ONot Applicable 402.1,1, Floor insulation R-value. R R- OComplies See the Envelope Assemblies table 402.2.5, ❑ Wood 0 Wood ODoes Not Comply ►ar values. 402.2.6 ❑ Steel O Steel ONot Observable [INV ONot Applicable ta. 303.2, Floor insulation installed per OComplies 402.2.6 manufacturer's Instructions,and in ODoes Not Comply (IN2]' substantial contact with the underside ONot Observable ;, of the subfloor. ONot Applicable 402.1.1, Wall insulation R-value.If this is a R- R- OComplies See the Envelope Assemblies table 402.2.4, mass wall with at least'/:of the wall ❑ Wood ❑ Wood ODoes Not Comply for dues. 402.2.5 insulation on the wall exterior,the 0 Mass ❑ Mass ONot Observable [IN3]' exterior insulation requirement ❑ Steel ❑ Steel ONot Applicable applies. 303.2 Wall insulation is Installed per OComplies [1N4]' manufacturer's instructions. ODoes Not Comply kit ONot Observable ONot Applicable 402.2.11 Sunroom wall insulation has a R- R- OComplies [IN8]' minimum R-value of R-13.New walls ODoes Not Comply separating the sunroom from ONot Observable conditioned space must meet code ONot Applicable requirements. 303,2 Sunroom wall insulation installed per OComplies [1N9]1 manufacturer's Instructions, Oboes Not Comply 4;, ONot Observable ONot Applicable 402.2.11 Sunroom ceiling minimum insulation R- R- OComplies [IN1011 R-value of R-19 in Climate Zones 1-4, ODoes Not Comply and R-24 in Climate Zones 5-8. ONot Observable Ai ONot Applicable 303.2 Sunroom ceiling insulation is installed OComplies (IN11]' per manufacturer's instructions. ODoes Not Comply t, ONot Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 1 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 6 of 8 1 High Impact(Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 5 of 8 Aissimsesmip 2009 IECC Framing i Rough-In Inspection Plans Verified Field Verified Compiles? Comments/Assumptions Value Value 402.1.1, Door U-factor. U- U- OComplies See the Envelope Assemblies table 402.3.4 ODoes Not Comply for values. [FR1]' ONot Observable ONot Applicable 402.1.1, Glazing U-factor(area-weighted U- U- OComplies See the Envelope Assemblies table 402.3.1, average). ODoes Not Comply for values. 402.3.3, ONot Observable 402.5 ONot Applicable [FR2]' 303.1.3 U-factors of fenestration products are OComplies [FR4]' determined in accordance with the ODoes Not Comply ix; NFRC test procedure or taken from ONot Observable the default table. ONot Applicable 402.3.5 Sunrooms enclosing conditioned U- U- ❑Complies (FR811 space have a maximum fenestration ODoes Not Comply U-factor of 0.50 in Climate Zones 4-8. ONot Observable New glazing separating the sunroom g 9 ONot Applicable from conditioned space must meet code requirements. 402.3.5 Sunrooms enclosing conditioned U- U- OComplies [FR9]' space have a maximum skylight U- ODoes Not Comply factor of 0.75 in Climate Zones 4-8. ONot Observable :Not Applicable 402.4.4 Fenestration that is not site built is OComplies [FR2011 listed and labeled as meeting ODoes Not Comply AAMA/WDMA/CSA 101/I.S.2/A440 or ONot Observable has infiltration rates per NFRC 400 ONot Applicable that do not exceed code limits. 402.4.5 IC-rated recessed lighting fixtures OComplies (FR1612 sealed at housing/interior finish and ODoes Not Comply labeled to indicate 2.0 cfm leakage at ONot Observable 1# 75 Pa. ONot Applicable 403.2.1 Supply ducts in attics are insulated to R- R- OComplies FFR121' R-8.All other ducts in unconditioned R. R- ODoes Not Comply spaces or outside the building ONot Observable k€ envelope are insulated to R-6. pe :Not Applicable 403.2.2 All joints and seams of air ducts,air Complies (FR131' handlers,filter boxes,and building ODoes Not Comply cavities used as return ducts are ONot Observable sealed. ONot Applicable 403.2.3 Building cavities are not used for OComplies (FR15)3 supply ducts. ODoes Not Comply 4, ONot Observable :Not Applicable 403.3 HVAC piping conveying fluids above R- R- OComplies [FR17]2 105°F or chilled fluids below 55°F ODoes Not Comply are insulated to R-3. ONot Observable ONot Applicable 403.4 Circulating service hot water pipes are R- R- OComplies [FR1812 insulated to R-2. ODoes Not Comply ONot Observable vt ONot Applicable 403.5 Automatic or gravity dampers are OComplies jFR19j2 installed on all outdoor air intakes and ODoes Not Comply exhausts. [Not Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 4 of 8 2009 IECC Foundation Inspection Complies? Comments/Assumptions 303:2.1 A protective covering is installed to protect °Complies [FO11)? exposed exterior insulation and extends a ❑Does Not Comply minimum of 6 in.below grade. ( Not Observable ONot Applicable 403.8 Snow-and ice-melting system controls °Complies [FO1212 installed. ODoes Not Comply ONot Observable :Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low impact(Tier 3) Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 3 of 8 cidREScheck Software Version 4.4.4 Inspection Checklist Requirements: 0.0% were addressed directly in the REScheck software Text in the"Comments/Assumptions"column is provided by the user in the REScheck Requirements screen.For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table,a reference to that table is provided. 2009 IECC Pre-Inspection/Plan Review Plans Verified Field Verified Complies? Comments/Assumptions Value Value 103.2 Construction drawings and ❑Complies [PR1J1 documentation demonstrate energy ODoes Not Comply code compliance for the building ❑Not Observable envelope. [Not Applicable 103.2, Construction drawings and ❑Complies 403.7 documentation demonstrate energy ❑Does Not Comply (PR3J' code compliance for lighting and ❑Not Observable a$; mechanical systems.Systems serving :Not Applicable multiple dwelling units must demonstrate compliance with the commercial code. 403.6 Heating and cooling equipment is Heating: Heating: ❑Complies [PR212 sized per ACCA Manual S based on Btu/hr Btu/hr ❑Does Not Comply l ; loads per ACCA Manual J or other Cooling: Cooling: :Not Observable approved methods. Btu/hr Btu/hr :Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 2 of 8 c j. REScheck Software Version 4.4.4 Compliance Certificate Project Title: Kolakoski Addition Energy Code: 2009 IECC Location: Northampton,Massachusetts Construction Type: Singe-family Project Type: Addition Heating Degree Days: 6404 Climate Zone: 5 Permit Date: Construction Site: Owner/Agent: Designer/Contractor: 32 Austin Circle Florence,MA Compliance: Passes using UA trade-off Compliance: 7.3%Better Than Code Maximum UA: 124 Your UA:115 The%Better or Worse Than Code Index reflects how dose to compliance the house is based on code trade-ot rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Cavity Cont. Glazing Assembly Area or or Door UA Perimeter R-Value R-Value U-Factor Ceiling 1:Raised or Energy Truss 1,000 38.0 0.0 25 Wall 1:Wood Frame, 16"o.c. 1,170 21.0 0.0 62 Window 1:Wood Frame:Double Pane with Low-E 82 0.300 25 Door 1:Solid 6 0.320 2 Floor 1:All-Wood Joist/Truss:Over Outside Air 40 30.0 0.0 1 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: Kolakoski Addition Report date: 06/13/13 Data filename: Untitled.rck Page 1 of 8 Page 3 55. Supply& Install new Berber carpet in all bedrooms, hallways and closets on the new second floor. Carpet allowance is$9.00 a yard. 56. Supply and install (3)smoke detectors and(1) Carbon Monoxide detector. 57. Supply& Paint(2) coats on all ceilings with Behr Flat white ceiling paint. 58. Supply&Paint(2)coats on all walls with(1) Standard color Eggshell Behr Paint. 59. Install Owner Supplied light fixtures in all rooms except Bedroom(3) & (4) closets. 60. Supply and install (2)new energy efficient single light closet lights in Bed (3)and Bed (4)closets. 61. Supply and install (1)new 36"Oak Bath Vanity in the new second floor bathroom. 62. Supply and install (1)new Granite Bath Vanity top in the second floor bathroom. 63. Supply& Install new 8"Brushed Nickel Delta Faucet in said Vanity Top. Allowance $110.00 64. Supply& Install new Standard Oval Gerber Toilet with Slow closing toilet seat. 65. Disposal of all debris removed and generated from said work. 66. Install new maple stair treads going from the first floor to the second floor with having primed pine risers to finish the stairs. Includes: Building Permit. Exclusions: • Supplying Light Fixtures / Fans for the second floor. Theses fixtures must be supplied by owner in a timely fashion when needed. Contractor will give owner (5) business days notification when needed. • Finishes on the first floor above and beyond the aforementioned scope of work. • Interior closet finishes such as closet poles and shelving in the master closet. • Landscaping for areas needed for construction of the new second floor. • Stretch Code Pressure Testing if Required. If you choose to complete the painting yourself on the second floor and stairway to the second floor please deduct $4,500 from the contract price. a_./15 arakoski Date: Pa••nt Da e: Office: (413)610-0818 Fax: (413) 610-0414 Page 2 27. Install new 3/4"Tongue and Groove plywood glued to the floor joists with PL 400 adhesive. 28. Move existing electrical feed from the street to the home up to the newly constructed second level approximately 10'. 29. Construct new 2" x 4" spruce stud interior walls as outlined in the plans. 30. Supply&Install new service wire and 50 Amp electrical sub-panel on the new proposed second floor to accommodate for new electrical outlets,lights and switches. 31. Supply& Install new rough wiring throughout the new second floor to meet state code requirements for outlets. 32. Supply& Install (1)ceiling fan box connection in each of the bedrooms on the second floor with having(1) switch to control both light and fans. 33. Supply and install (1) 75 CFM Bath/Fan combo in the new second floor bathroom with having(1) switch to control both fan and light. 34. Supply and Install (1) light connection with a(3)way switch in the new second floor hallway. 35. Supply and Install (1) overhead closet light connection with (1) switch in the new second floor master closet. 36. Supply& Install new GFI outlet over the new vanity on the second floor bathroom. 37. Supply& Install new vanity light connection over the new vanity on the second floor. 38. Supply& Install rough wiring and boxes for smoke/carbon monoxide detectors. 39. Supply& Install new rough plumbing(water lines and drain lines) from the basement to the second floor to accommodate (1)new toilet, vanity and tub/shower. 40. Supply and install (1) new standard Sterling tub/shower. 41. Supply and install new Brushed Nickel Delta Shower/Tub Valve in the new second floor Tub/Shower. Allowance for the Valve is$150.00. 42. Install new R-20 Unfaced batt insulation at all exterior walls of the new second floor. 43. Install new Poly over the second floor exterior studs and newly installed batt insulation. 44. Supply& Install new 'A"drywall on all walls of the new addition except for the bathroom area. 45. Supply& Install new '/z"Green board Moisture resistant drywall within the bathroom area. 46. Supply& Install new 5/8"drywall over all the ceiling areas except the bathroom. 47. Supply& Install new 5/8"drywall over the ceiling area of the bathroom. 48. Supply& Install (1) coat of joint compound with seam tape at all seams including inside and outside corners. 49. Install (2)additional coats of joint compound over said tape and sand when completely dries. 50. Supply& Install new R-38 Blown in insulation in the new second floor attic space. 51. Supply&Install (6)new solid core raised panel split jamb molded white doors at all bedrooms,master closet and bathroom. 52. Supply& Install new 12"x 12"ceramic tile in the second floor bathroom area. Allowance on the tile is$3.00 per square foot. 53. Supply& Install new Ranch Style baseboard along all walls on the new second floor. 54. Supply& Install new Colonial Style casings around all windows on the new second floor Office: (413) 610-0818 Fax: (413) 610-0414 Construction ®, LLC 65 East St, Ludlow, MA 01056 Exhibit "A " 1. Remove existing trusses from the existing structure.This will consist of cutting the top cord and the webbing, leaving the bottom cord in place over the main floor walls. 2. Install new 9 '/2" IB 400 floor Joists 16"on center over the main floor walls(interior &exterior) approximately 26' long from one end of the existing home to the other. 3. Install new 1 3/4"pre-engineered rim board around the perimeter. 4. Install new 3/4' Advantek plywood over the new IB 400 floor joists with gluing the plywood to the floor joist with PL400 adhesive. 5. Frame new 2"x 6"exterior walls 8' high on the front, back and two sides to create the second floor. 6. Install new Y2"zip board over newly framed exterior walls. 7. Install new zip tape over all wall seams. 8. Install new 6 on 12 pitch common trusses with (2) gable end trusses over the newly framed walls. 9. Install new 7/16"zip board over the new roof trusses. 10. Install 2"x 6" spruce board at the fascia and rake edge creating a 1' over hang. 11. Install new Ice& Watershield 3' up along the bottom edge. 12. Install new drip edge around all edges. 13. Install new 40yr GAF Timbeline Architectural shingles (color of owners choice) 14. Install new ridge vent over the entire ridge area except the last 18" on each side. 15. Install new Cap shingles over entire ridge. 16. Install (9)Double Hung Low-E Argon Filled Anderson Windows Series 200 (size 29 'A"x 47 3/4"). 17. Install (1)Low-E Argon filled Triple Size window with(2) side flanks that will be double hung and one center fixed picture glass. 18. Install new vinyl J-Channel around all windows, soffit areas,and rake edges. 19. Install new double four vinyl siding to match existing color and style as much as possible starting from where the existing home siding ends. Price per square not to exceed $90.00 per sq. 20. Install new 18"x 24" gable vent at both gable ends. 21. Install new white Vinyl solid vented solid soffit panels along the 1' overhang at the soffit area. 22. Install new white Vinyl solid soffit along all rake edges. 23. Install new white aluminum at all fascia's and rake edges. 24. Install existing gutters and downspouts at the front and back of the new second floor with adding extenders of the downspouts to meet ground level. 25. Cut out existing ceiling area and first floor flooring to except new stairs leading to the second floor and basement within the proposed office space. Install new 2"x 12" spruce stair stringers with having new 2"x 10" spruce stair treads leading down to the basement. 26. Box out the existing basement stairs with new 2" x 10" floor joists. . ............. . Office: (413) 610-0818 Fax: (413) 610-0414 Page 1 4. Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time of final payment. 5. All change orders shall be in writing and signed both by Owner and Contractor, and shall be incorporated in, and become part of the contract. 6. Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of Contractor or its employees or sub- contractors. 7. Contractor shall at its own expense obtain all permits necessary for the work to be performed. 8. Contractor agrees to remove all debris and leave the premises in broom clean condition. 9. In the event Owner shall fail to pay any periodic or installment payment due hereunder, Contractor may cease work without breach pending payment or resolution of any dispute. 10. All disputes hereunder shall be resolved by binding arbitration in accordance with rules of the American Arbitration Association. 11. Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials. 12. Contractor warrants all work for a period of 12 months following completion. Signed this day of June 22, 2013. Name of Owner: Mic, - Kolakoski/ Date : C,/Lz..I t 3 By (Signature): C 1 Name of Contractor: D.L. Construction 8 LLC } r By (Signature): ♦..; _ — .� Street Address: "ast St. City/State/Zip: Ludlow, Ma. 01056 Telephone No.: (413) 610-0818 Contractor's Licenser No.: CS-078212 License # CS 078212 Page 2 9 H. D. L. Construction Co•, LLC Contract Agreement THIS AGREEMENT made 22th day of June, 2013 by and between H.D.L Construction Co., LLC., hereinafter called the Contractor and Michael Kolakoski, hereinafter called the Owner. Article 1. Scope of the Work The Contractor shall furnish all of the materials and perform all of the work shown on the Drawings and/or described in the Specifications entitled Exhibit A, as annexed hereto as it pertains to work to be performed on property at 32 Austin Circle Florence, MA 01062. Article 2. Time of Completion The work to be performed under this Contract shall be commenced on or before July 22, 2013 and shall be substantially completed on or before September 2, 2013. Time is of the essence. The following constitutes substantial commencement of work pursuant to this proposal and contract. Article 3. The Contract Price The Owner shall pay the Contractor for the material and labor to be performed under the Contract the sum of Seventy Seven Thousand and Forty Dollars ($77,040.00), subject to additions and deductions pursuant to authorized change order. Article 4. Progress Payments Payments of the Contract Price shall be paid in the manner following: $5,000.00 at the signing of the contract. $20,680.00 7-10 after signing the contract. $25,680.00 once the structure is erected. $15,000.00 once the drywall is hung and taped. $10,680.00 upon completion Article 5. General Provisions Any alteration or deviation from the above specifications, including but not limited to any such alterations of deviation involving additional material and/or labor costs, will be executed only upon written order for same, signed by Owner and Contractor, and if there is any charge for such alteration or deviation, the additional charge will be added to the contract price of this contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made.A failure to make payments for a period in excess of 30 days from the due date of the payment shall be deemed a material breach of this contract. In addition, the following general provisions apply: 1. All work shall be completed in a workman-like manner and in compliance with all building codes and other applicable laws. 2. To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work. 3. Contractor may at its discretion engage sub-contractors to perform work hereunder, provided Contractor shall fully pay said sub-contractor and in all instances remain responsible for the proper completion of this Contract. Page 1 65 East St. Ludlow, MA 01056 Pa g License#CS 078212 • 1 ■ I I -... . .....,..... ...........-..■... til ■ ,,,„......-..,...-......... 1 . : ■ ■ ,.---.......■--.. ..... . ■ is 1 I - j ,--- ,--- J 3 . 3 3 I) r 4(.. ...E. i - i -,, -'"C i 1 - .• I 0) t - ..--- , ; '..; ..-- 1 .-- ,---0 , -. . -r- - 1 Ft j 1 ,.,. ,----- , 1 g ., c) ■ ( Q:7 if ., ..', . ' s CI ' ..... 5 -, - r, SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) 0 Roofing J Or Doors I] Accessory Bldg. ❑ Demolition ❑ New Signs ED] Decks [❑ Siding[D] Other[El Work:Description 2nd Proposed a. <csu� �,.� +, 'vr.�� W Ork: lnslalling a new 2nd floor Addition consisting of 3 Bedrooms and a bathroom. � �f„ ', > � �L{j„t`fie Alteration of existing bedroom Yes R No Adding new bedroom Yes A No Attached Narrative Renovating unfinished basement Yes x No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building: One Family X Two Family Other b. Number of rooms in each family unit: 6 Number of Bathrooms 3 c. Is there a garage attached? no d. Proposed Square footage of new construction. 1000 Sq. Ft Dimensions e. Number of stories? 2nd(proposed) f. Method of heating? Wood Stove Fireplaces or Woodstoves 1 Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? yes h. Type of construction Wood i. Is construction within 100 ft.of wetlands? Yes X No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT , as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I, ! a,•,—et=. C.-05 c _ ,as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. *� eio Name „11.1P ' ��\mow... . r' t ',Own- Age t Date Imukw Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size #if Frontage \` 1 Setbacks Front Side L: 5c R: L: R: Rear Building Height t '` Bldg.Square Footage 1000 % 1000 Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW 0 YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW O YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW ® YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained ® , Date Issued: C. Do any signs exist on the property? YES ® NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES ® NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES ® NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. AFR-16-2813 15:35 From:413-583-6511 Pase:1%1 HDLCO-1 OP ID: DC .4t tJRO' CERTIFICATE OF LIABILITY INSURANCE DAT`(MM/ 04116/2013 2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER, IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(ies)must bo endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions Of the policy,certain policies may require on endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER Phone:413.589-0901--FaTeCT Ideal Insurance Agency,Inc. Fax:413-583-651 1 PHONE (FAX No): 187 East St rA+C.No.Ex(); Ludlow,MA 01056 E-MAIL ADDRESS: INSURER(S)AFFORDING COVERAGE NAIL# INSURER A:Atlantic Casualty Insurance Co INSURED HDL Construction Co.LLC INSURER 8: 65 ast Streat INSURER C: Ludlow, MA 01056 -- INSURER D: INSURER E: INSURER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT TI IC POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RFRPFCT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. iLTR TYPE OF INSURANCE -_ INSRL JWYD I POLICY NUMBER (MMNDY/YOFF-Y) (MMIDD/Y Y'n f LIMITS - -----— ----_ GENERAL UABILrtY ( I I EACH OCCURRENCE 5 1.000,000 A X COMMERCIAL GENERAL LIABILITY (L021008001 II 12/17/2012 12/17/201$ PREMISES fi(Ea ncn} 5 50,00 CLAIMS-MADE X I OCCUR i { MED EXP(Any one person) S 5,000 PERSONAL SADVINJURY S1,000,000 GENERAL AGGREGATE $ 2,000,000 GFN.AGGREGATE LIMIT APPLIES PEN. PRODUCTS-COMP/0P AGO I S 2,000,000 .Y1 PourY I IF T LOC 1$ COMBINED SINGLE LIMIT a AUTOMOBILE LIABILITY (EA decl0eni) .... ANY AUTO BODILY INJURY(Per person) —S ALL OWNW ' SCHEDULED BODILY INJURY(Per accident) S AUTOS i IAUTOS HIRED AUI O:: AUTOS ccIPROPFRTY DAMAGF a -- (Per UMBRELLA LAB OCCUR i jLACH OCCURRENCE $ EXCESS UAB j CLAIMS-MADE I !AGGREGATE $ DED I I RETENTIONS WORKERSCOMYENSATION 1 ORYLI IU- `Ulti- AND EMPLOYERS'LIABILITY I I l TORYI,Ih11T3, ...l_ER Y I N ANY PROPRIETOR/PARTNEREEXECUTIVE ( E.L.EACH ACCIDENT S. OfFICERIMEMBER EXCLUDED? N r A (Mandatory In NH) I E L.DISEASE-EA EMPLOYEES _ If n,.,dr nrribo urdnr 1 I DESCRIPTION OF OPERATIONS below i I t DISEASE•POLICY LIMIT 5 • DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Att"ach ACORD 101.AdLIIEOnal Remerxa Schedule,If more apace IS required) REMODELING CONTRACTOR, ROOFING CERTIFICATE HOLDER CANCELLATION INSRECD SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN FOR INSURED'S RECORD ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED jjREPRESENTATIVE 2 RI� (g)1088-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: C 7 2,a\'r'� t \ License Number •� ss Expiration ate cp- r-ign1 111110 Telephone 9.Registered Home Impr ent Contractor: Not Applicable ❑ Company Name s., s . Registration Number to 41 �a - t ��, rte- . c� k\"A\ac�� Address Expiration Date Telephone U.\2,..t td� SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes A No ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature 1 Department use only City of Northampton Status of Permit: Building Department Curb Cut/Driveway Permit r 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability 1 N rthampton, MA 01060 Two Sets of Structural Plans > 2 6 ? dne 41 587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify i piNG I.+ o§ fi • . = UCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completed by office 1.1 Property Address: 2> �,. � C Map Lot Unit cs.r Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Mike Kolakoski 32 Austin Circle Florence,MA 01062 Name(Print) Current Mailing Address: (413)250-7401 Telephone Signature 2.2 Authorized Agent:('l C N.Si (Print) Current Mailing Address: _oz,c, Sign.r Telephone ON 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 61,040 (a) Building Permit Fee 2. Electrical 8,500 (b) Estimated Total Cost of Construction from(6) 3. Plumbing 7,500 Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection /4(73 04 - 6. Total=(1 +2+3+4+5) 77,040 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2013-1244 O ∎ aC� APPLICANT/CONTACT PERSON JEFFREY PARENT i NA ADDRESS/PHONE 65 EAST ST LUDLOW (413)610-0818 0 L PROPERTY LOCATION 32 AUSTIN CIR _ p ti MAP 29 PARCEL 352 001 ZONE j �e „ r cots THIS SECTION FOR OFFICIAL USE ONLY: Ne(fr-)EaPERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out ? Fee Paid 1 v L1( Typeof Construction: CONSTRUCT 000 SQ FT 2ND STORY ADDITION(3 BEDRMS&BATH) 1 �9 two New Construction ^\ e Non Structural interior renovations / '� Addition to Existing � � Accessory Structure � w�� /' Building Plans Included: I" _ Y Owner/Statement or License 078212 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON IN �( MATION PRESENTED: //Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission _ Permit DPW Storm Water Management D-. o ition Delay Signa re of Building Official Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 32 AUSTIN CIR BP-2013-1244 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 29-352 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2013-1244 Project# JS-2013-002053 Est. Cost: $77040.00 Fee: $462.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: JEFFREY PARENT 078212 Lot Size(sq. ft.): 15638.04 Owner: KOLAKOSKI MICHAEL J&ERICA L TRUDELL Zoning: Applicant: JEFFREY PARENT AT: 32 AUSTIN CIR Applicant Address: Phone: Insurance: 65 EAST ST (413) 610-0818 () Liability LUDLOWMA01056 ISSUED ON:7/11/2013 0:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT 1000 SQ FT 2ND STORY ADDITION (3 BEDRMS&BATH) POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building $462.00 . / • 'f 212 Main Street,Phone(413)587-1240,Fax: (413) 587-1272 Louis Hasbrouck—Building Commissioner