Loading...
18-045 CC cover letter 3.28.13.pdf 4 Allen Place Northampton, MA 01060 E mail:bdg@berkshiredesign.com March 28, 2013 Northampton Conservation Commission City of Northampton 210 Main Street, RM 11 Northampton, MA 01060 Re: Connecticut River Greenway Park DEP File # 246-0668 Request for Amended Notice of Intent Dear Commission Members: In response to comments from the US Army Corps of Engineers and MA DEP, revisions were necessary to satisfy the various agency concerns. As a result, modifications to the grading along the boat ramp access road and around the proposed boathouse site are presented as well as the addition of a new handicapped accessible ramp to facilitate access resulting from the new grades. In general, the overall impacts to the resource areas were significantly reduced. A slight increase to Riverfront Area disturbance is proposed as a result of the additional handicapped ramp. A breakdown of the various impacts and the changes that result with the plan modifications are presented below. No changes to the stormwater drainage system or other utilities are proposed. Previous Current Wetland BVW 2,200 SF 232 SF IVW 2,655 SF 803 SF Total 4,855 SF 1,035 SF Wetland Replication Area 12,312 SF 3,479 SF Riverfront Area Disturbance 21,234 SF 29,501 SF Riverfront Mitigation 34,104 SF 34,104 SF Area Subject to Flooding 10,959 CF additional n/c storage March 28, 2013 Page 2 # 246-0668 Please contact me if additional information or clarification is required. Thank You, The Berkshire Design Group, Inc. Jeffrey Squire, RLA C.C. MDEP Western Region enclosures