Loading...
05-032 River Rd con comM ,o Form8 oECE Fib NO. 246- 104 q Iro w aovN�a W DEOEI �-\ Commonwealth Cityrr.. N rth� l u g- , of Massachusetts Applkent RAM Structure, Inc. Berkshire Electric Cable Certificate of Compliance Massachusetts Wetlands Protection Act, G.L. c. 131, §40 From N tb C ojlaervatiolj C I ssuing Authority To Berkshire Electric Cable co. River Road Leeds MA (Name) (Address) Date of Issuance This Certificate is issued for work regulated by an Order of Conditions'. issued to o>u s e r„, (Berkshire Electric Cable) dated Mav 1],,, 1982 and issued by the Conservation C a'on 1. ® It is hereby certified that the work regulated by the above - referenced Order of Conditions has been satisfactorily completed. 2. ❑ It is hereby certified that only the following portions of the work regulated by the above- refer- enced Order of Conditions have been satisfactorily completed: (If the Certifloate of Compliance does not include the entire project, specify what portions are included.) 3. ❑ It is hereby certified that the work regulated by the above - referenced order of Conditions was never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Act may be commenced without filing a new Notice of Intent and receiving a new Order of Conditions. (Leave Space eiank) 8 -1 q, ❑ This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in ( date) which the land is located. The Order was originally recorded on at the Registry of n h' Cn nt ;. Book ,Page 6 ❑ The following conditions of the Order shelf continue: (Set forth any conditions contained in the Final Order, such as maintenance or monitoring, which are to continue for a longer period.) Issued by Northam ton Conservation Commission Signaturets)- Z6"u G✓vtt�^ til When issued by the Conservation Commision this Certificate must be signed by amajorlty of is b embers. Q[tu /a On this ! day of to me known to be the personally e person described in and who executed the foregoing instrument and acknowledged that he/she execute the same as his /her free act and deed. My commission expires Notary Public petech on dosed Ilne and submit to the ......... _,_�__._.._ _...____. .............._ ...... _. ..... ......... _beuing Authority To Please be advised that one Certllicate of Compliance lot the project at File Number " 2 has been recorded at the Registry of _. 19 and has been noted in the chain of title of the affected property on— It instmment number which Idar dies this Vansadion is recorded land, the II registered land, the document number which Identifies Ih a Nansaction B-2 Form 5 ^ DEDEFile NO 246 -104 ` _, \ (TO lw povtlW by DEOE Commonwealth 111,TO.n NOrtharro LOn of Massachusetts Applcenl Ram St I C LO rv ( Berkshire Elect-, Cab_ Order of Conditions Massachusetts Wetlands Protection Act G.L. c. 131, §40 From NorthamoLOn Conservation Co To RAM Str uctures. Inc. Berkshire Electric Cable _ (Name of Applicant) (Name of property owner) Address Y.O. Box 239 No Tthampton,MA Address River Road. Leeds, MA This Order is issued and delivered as follows' @X' hand delivery to applicant or representative on MaT L9E_3 (yy R,.va /kanQ (dale) ❑ by certified mail, return receipt requested on This project is located (date( The property is recorded at the Registry of Deeds Hampshire County Certificate (if The Notice of Intent for this project was filed on May 3, 1983 _ (date) The pudic hearing was closed on _ May 9 1983 (date) Findings The Nor ttamDton CoiiservaLion Co ' has reviewed the above- referenced Notice ,^ Intent and plans and has held a public hearing on the project. Based on the information available to the Co nservat f or ommission — atthistime,the_ Commission has determined that the area on which the proposed work is to be done is significant to the following interests In accordance wah the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act (check as appropriate): ❑ P Public water supply ❑ 5 -1 Therefore. the _Ko rc 4xar+rptou Conservatinn Cwnmissiofiere by finds that the following conditions a re necessary, in accordance with the Performance Standards set fonh in the regulations, to protect those inler- estscheckedabove.The Cnns ersaiiurLL:ommiss in _ orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced above. To the extent that the to lowing conditions modify or differ from fire plans, specifications or other proposals submitted with the Notice of Intent, the conditions shall control. General Conditions 1 . Failure to comply with all conditions slated herein, and with all related statutes and other regulatory meas- ures, shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by -laws or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: (a) the work is a maintenance dredging project as provided for in the Act; or (b) the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance and both that date and the special circumstances warranting the extended time period are set forth in this Order. 5, This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. B. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or de- bris, including but not limited to lumber. bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or, if such an appeal has been filed, until all proceedings before the Department have been completed. B. No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the and upon which the proposed work is to be done. The recording Information shall be submitted to the Co=t ss i on on the form at the end of this Order prior to commencement of the work. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Quality Engineering, File Number 246-104 10. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Department. 11 . Upon completion of the work described herein, the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12. The work shall conform to the following plans and special condition,: 5 -2 plans: lisle Dated Signed*A,&hrr SAW. On file with PROPOSED BUfLDING Ma y 1, 1983 Ken Rzasa Conservation Cemmiss ion ADDITION Por & April 7,1983 BERKSHIRE ELECTRIC Ram Structures,lnc. DEOE CA1"- LO^7YANY -- bhse4i S. J-I .l ,ai n2 cl a rn[ l.:l 15 _fuSGSL Special Conditions (Use additional paper it necessary) 13. The work shall conform to the following described plans: "PROPOSED BUILDING ADDITION FOR BERKSHIRE CABLE COMPANY" Sheets L]- L3,AI,A2, SI,S2, dated May I, 1983 and April 7, 1983. 14. All construction areas shall be restored to original conditions or better upon completion of the project, including vegetation. 15. No areas within the 100 year floodplain nor within 100 feet of a wetland area as defined in Chapter 131, Section 40 M.G.L., shall be permissable disposal sites, unless otherwise approved by the Conservation Commission. 16. This Order of Conditions shall apply to any successor in interest or successor in control. 17. Members and agents of the Conservation Commission shall have the right to enter and inspect the premises to evaluate compliance with the Conditions and to re- quire the submittal of data deemed necessary by the Commission for that evaluati 18. Measures shall be taken during construction to prevent erosion and sedinluntat ion of the disturbed areas. 19 . Compensatory flood storage shall be provided so as not to decrease the 1UO -year flood storage capacity of the site. 20. SEE ATTACHED SHEET. naive Spice Bmnlq 5-3A Issued By _ _ —Ll L. of Nk r[hamoto Conservation Commission This Order must be signed by a majority of the Conservation Commission h On this_ day of�Li>�_ 7 B? before me personally appeare i / �/' ' f l f �'� � /' , to me known to be the person described in and who execut4ihe foregoing instrument and acknowledged that he /she executed the same as his /her free act and deed. ,� otery, Public My commission expires The applicant, the owner, any person aggrieved by this Order, any owner el land abuhing the land upon which the proposed work is to be done or any ten residents of the city or town in which such land is bcate i are bereby notitied of their right to request the Department of Environmental chanty Engineering to issue a Superseding Order, providing the request is made by certified mail or hand delivery to Me Department within ten days from the dale of issuance of this Order. A copy of me request shall at the Mme time be sent by candied mail or hand delivery to the Consemal on CommlMlpa and tie eppikenl. Dabch on dosed It.. ad submit to IM prior to commencement of work. To Northampton Conservation Commission IMOing Authority Plesse be advised Met the Order of Conditions for the project e Berkshire Electric Cable, River Road Leed Re Number 24 6— 104 hMbeenrecordedatlMRegietryof Deeds, Hampshire County and has been noted in the chain of title of the affected proper, In accordMCe with Oenerai Calydbon B on 1 It recorded tend. Me Instrument number which identifies this thereachon is It registered land, the document number which identities this transaction u WVncem �� 5-4A ORULK OF CONt117'LONS (continued) ONE Filc No. 246 -104 20. All disturbed areas shall be stabilized against erosion in accordaocc with !'he guidelines of the U.A.D.A. Soil Conservation Service. ']he U.S.D.A. Soil Cwservati Service shall be consulted directly by the applicant, or its representative, with regard to the best measures to be implemented to stabilize, specifically, I �e steep cut slope on the westerly side of the lot identified as "Compensatory Storage Area #2" on Sheet L2. The applicant, or its representative, shall submi to the Conservation Commission, in writing, what stabilization measures will be used at "Compensatory Storage Area #2 ", and what meaures were recommended by the U.S.O.A. Soil Conservation Service. All disturbed areas shall have their p. rmantnr stabilization measures in place within 30 days of completion of the exterior of the addition. 5 -313 Form 3 lTI�` Commonwealth l - of Massachusetts �Q . �`°✓ oEOe File NO. , �V ' (TO b,, provided by nEOEI e.1 "Town nooncam .s /9/ 3�3 Notice of Intent Under the Massachusetts Wetlands Protection Act, G.L. c. 131, §40 and Application for a Department of the Army Permit Part I: General Information Location: Street Address Lot Number 23 L -P SS zoning map) 2. Project: Type 1\ r =rr ,rr; gpscfiption ct 4,500 f pr 3. Registry: County - ,amp =hd rP Current Certificate (If Registered &Page 70 4. Applicant T Tel. SR6 -6109 5. Propertyowner R prkshirp Elec Tel. FR4- 1251 Address 6. Representative - " ' Tel. 526 -61 n7 Address 7. Have the Conservation Commission and the DEOE Regional Office each been sent, by certified mail or hand delivery. 2 copies of completed Notice of Intent, with supporting plans and documents Yes ® No ❑ 3 -1 B. Have all obtainable permits, variances and approvals required by local bylaw been obtained? Yes X No ❑ Obtained: Applied For: Not Applied For: 8. Is any portion of the site subject to a Wetlands Restriction Order pursuant to G.L. C. 131, §40A or G.L. c. 130, § 1051 Yes ❑ No 7 10. List all plans and supporting documents submitted with this Notice of Intent. Identifying Number /Letter Title, Date R 1_11 o_r_1 nvarall Pl nt Pl on 5 -1 -83 an- 110 -r -9 Topography Plan 5 -1 -83 R1- 110 -1-3 AriIdi nnnn C t' s (' ^1 1 -t' S -1 —R 83- 110 -1-4 go il, Map 5 -1 -82 91- 110 -T -9 ' c 9-1 -83 rnn -1FF n -1 -a -9 Building ^ 4 -7 -83 11. Check those resource areas within which work is proposed. (a)❑ Buffer Zone (b) Inland ❑ Bank' land Subject to Flooding, • Bordering Vegetated Wetland' x Bordering • Land Under Water Body 5 Waterway' ❑ Isolated (c) Coastal: ❑ Land Under the Ocean ❑ Coastal Beach' ❑ Barrier Beach ❑ Rocky Intertidal Shore ❑ Land Under Salt Pond' ❑ Fish Run' ❑ 1 Designated Port Area' ❑ Coastal Dune ❑ Coastal Bank ❑ Salt Marsh' ❑ land Containing Shellfish' - Likely to involve U.S. Army Corps of Engineers concurrent jurisdiction. See General Instructions for - Completing Notice of Intent. 3 -2 Part II: Site Description Indicate which of the following information has been provided (on a plan, in narrative description or calcula- tions) to clearly, completely and accurately describe existing site conditions. Identifying Number /Letter (of plan, narrative or calculations) N atural Features: T -3 F T -4 Soils N/A Vegetation L-2 Topography B/A Open water bodies (including ponds and lakes) L -1 &L -2 Flowing water bodies (including streams and rivers) NO _ — rublic and private surface water and ground water supplies on or within 100 feet of site N/A Maximum annual ground water elevations with dates and location of test I 0 0__Y_r ._ , f 1 °Cd Boundaries of resource areas checked under Part I, item 11 above -------- Other Man -made Features: & Structures (such as buildings, piers, towers and headwalls) --- 1L/ Drainage and flood control facilities at the site and immediately off the site, including culverts and open channels (with inverts), dams and dikes xi /A Subsurface sewage disposal systems N/A Underground utilities T. -1 & T. -2 Roadways and parking areas T - Property boundaries, easements and rights- of-way Other Part III: Work Description Indicate which of the following information has been provided (on a plan, in narrative description or calcula. tions) to clearly, completely and accurately describe work proposed within each of the resource areas checked in Part I, item 1 1 above. Identifying Number /Letter (of plan, narrative or calculations) Planview and Cross Section of: L -1-L -5 c A -1 -S -2 Structures such as buildings, piers, towers and headwalls) N/A Drainage and flood control facilities, including culverts and open channels (with inverts), dams and dikes N/A Subsurface sewage disposal systems & underground utilities L -2 & L -3 :Filling; dredging and excavating, indicating volume and composition of material T, -2 Compensatory storage areas, where required in accordance with Part III, Section 10:57 (4) of the regulations - - - -- Other Point Source Discharge N/A Description of characteristics of discharge from point source (both closed and open channel), when point of discharge falls within resource area checked under Part I, item 11 above, as supported by standard engineering calculations, data and plans, including but not limited to the following: 3.3 I . Delineation of the drainage area contributing to the point of discharge; 2. Pre. and post- development peak run -off from the drainage area. at the point of discharge, for at least the 10 -year and 100 -year frequency storm; 3. Pre- and post - development rate of infiltration contributing to the resource area checked under Part 1. item 11 above; 4. Estimated water quality characteristics of pre. and post-development run -off at the point of discharge. Part IV: Mitigating Measures 1. Clearly, completely and accurately describe. with reference to supporting plans and calculations where necessary; (a) All measures and designs proposed to meet the performance standards set forth under each re. source area specified in Part II or Part III of the regulations; or (b) why the presumptions set forth under each resource area specified in Part II or Part III of the regula- tions do not apply. 0 coastal Re :oWge Area Type: Flood Plain Bordering .0 Inland Identifying number or lever Ol SuPts n dOCUTPnt, Construct 4500 s.f. Pre- engineered building 83 -110 L -1 -L- addition which requires fill and allow for 5 & CDA -165 compensatory storage areas as shown: A -1 -S -2 J -4 ❑ ❑ coastal Resource Area Type miand ide�dNwe number opener of supoat documents 2. Clearly, completely and accurately describe, with reference to supporting plans and calculations where necessary: (a) all measures and designs to regulate work within the Buffer Zone so as to insure that said work does not alter an area specified in Part I, Section 10.02(1) (a) of these regulations; or (b) if work in the Buffer Zone will alter such an area, all measures and designs proposed to meet the performance standards established for the adjacent resource area specified in Part II or Part III of these regulations. ❑ Coastal Resource Ara. Type Bordered By 100 Foot Discretionary Zone: ❑ inland Identilyin9 number or tell' of sup0ort documents 3 -5 'Part V: Additional Information for a Department of the Army Permit 1 . COE Application No. N, /A — . _ 2. N/A (to be provided by COE) (Name of waterway) 3. Names and addresses of property owners adjoining your property: Northerly: N/F Hampshire.County Southerly: N/F Cordelia A. Seney Easterly Berkshire Electric Cable & Mill River Westerly N/F Joseph C & Mary Dickenson 4. Document other Project alternatives (i.e., other locations and/or construction methods, particularly those that would eliminate the discharge of dredged or fill material into waters or wetlands). No build alternative - entire site within 100 yr. flood plain 5. 8% x 11" drawings in planview and cross- section, showing the resource area and the proposed activ. ity within the resource area. Drawings must be to scale and should be clear enough for photocopying. Certification s required from the Division of Water Pollution Control before the Federal petnut can be issued Certificaton may be obtained by ccn=utg the Divsbn of Water Polution Coned. 1 Winter Street Boston. lvlassacnusens 02108. Where the activity will take place within the area under the Massachusetts appti ed Coastal Zone Management Program. the applicant certifies that his proposed activity ccrnpEs wish and will be conduct ed n a manner that is consstent with the approved program Information provided will be used in evaluatng the application for a perm¢ and s made a matter of pubic record through ssuance of a public notice. D'scbsure of th information is voluntary hoAlosr if necessary nforrnation s not povded. the aPP`catim cannot be processed nor can a permit be issued. I hereby certify under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans, docunIrrits and pporting data are true and complete, to the best of my knowledge. Signature of Applicant / 11 Date � " i Signature of Applican 's Represe rt alive Dat �— FO RM 'e•11PU.. It axe r....a.a h .... e h„ xpusece. a u. leer•. NFD 100 (TEST) 1 MAY 82 - rn�. d..,,...1 ...1.�... i.;.1 p or 1h1 e...r ..d Stitt .r 9 ..... h...u. .P'1; . i.. o.. P.. a r..hu. ......,.n to P.d.rm . i,i ... n u.u.e s.b... 1111 Th. olnr. .r w ... 1n o ..d e.ern unun t ., ..... . h. .. ,...x... .1 ,..nd h, n. ux At., c.rr. .( C.ri.ttr.. 0149 N..hn 010].00]6.1 ..Pirn:.n d.b or ]0 9.11.4.. 1163 .ppii,4'. Thi. J.u.tn1 .;x Lt .0 ,. 6 P.b, up.. "J 3.6