29-429 (5) ARRAY DE SIGN / SITE DIAGRAM
VIEW PANEL
a" c
N ORIENTATION (TRUE) ROOF PITCH (DEGREES)
AERIAL - OVERHEAD 184 19
f° o
o
0 o
M E LL
N � t- �
-
rl — c 0 o
ti
• 3 ) 241 "
■
ai ch
Z :c o' '
m
z (oz
E0 c�
• 294" ■
L
c v o
i O L
G U Q L
0') x- 43" > I
CO •
c E c
� ter, #�" i 0
UTILITY METER � L
AC DISCONNECT C ( 3
D R IVEWAY
SUNRUN METER ,,, . Q (0
PLACE INVERTER 0.. C C
TO THE LEFT OF N
THE MEP IN C/) J co
•
BASEMENT N " U)
O
j Z
< 39.05 "
ZEP PORTRAIT
is \ /,4
a
' ' X '.
r
Total'
T otal # of Pan 26
EcoFaste Solar Flashings will be
used on every roo penetration South
Date:
Customer Signature:
ELECTRICAL DESIGN
pv MODULE RATINGS @ STC INVERTER RATINGS 690.53 PHOTOVOLTAIC POWER SOURCE SERVICE PANEL RATINGS ARRAY DETAILS
SIGN ON INVERTER MPPT1
MODULE MANUFACTURER: Trina INVERTER MODEL: PVI -6000 BUS AMP RATING(A): 200 MODULES PER STRING: 8
MODULE MODEL #: TSM -245 PC /PAO5A OUTD OPERATING CURRENT(A): 16.24 SERVICE VOLTAGE(V): 240 NUMBER OF STRINGS: 2
OPEN - CIRCUIT VOLTAGE (Voc): 37.7 MAX DC VOLT RATING(V): 600 OPERATING VOLTAGE(V): 307 MAIN AMP RATING(A): 200 MPPT1
OPERATING VOLTAGE (Vmp): 30.2 MAX POWER @ 40 °C(W): 6000 MAX SYSTEM VOLTAGE(V): 450.3 AMP RATING(A): 35 MODULES PER STRING: 10
OPERATING CURRENT(Imp): 8.12 NOMINAL AC VOLTAGE(V): 240 MAX CIRCUIT CURRENT(A): 27.59 NUMBER OF STRINGS: 1
SHORT - CIRCUIT CURRENT(Isc): 8.83 MAX AC CURRENT(A): 28
MAXIMUM POWER (W): 245 MAX OCPD RATING(A): 35 BLACK IS POSITIVE
Voc TEMP COEFF (mV or % / °C)= -0.32 %/°C WHITE IS NEGATIVE
# OF MODULES IN SERIES: 8
UTILITY O
METER
#6 THWN -2
# OF MODULES IN SERIES: 8 Through to Line
#10 THWN -2 Wire Side Tap Q
# 6 THWN -2 Ground L1 and L2 , \
1" EMT INDOORS I 125A j /)
7 W RES (� MEP
I'
( # OF MODULES IN SERIES: 10 -� fi[ : �i � : u
Afillle .116. =I
AC \ % 'Q
LINE b � GND# # ;:.
pp DC- -
DC LOAD
2
U
AC
L INTERGRATED INTERFACE
SolaDeck- DC 125A SUNRUN AC FUSED
Pass DISCONNECT INVERTER SOLAR KWH
Through PVI -6000 OUTD METER DISCONNECT GROUNDING
for two 3 POLE ELECTRODE
60A240V
arrays
#10 USE -2 Wire #6 THWN -2 40A Fuse
# 6 Bare Copper Neutral and Ground
1 " PVC OUTDOOR
7 WIRES
Next Step Living Inc, Drawina: MB- NSL- 7/23/2012
Customer Name: William Golaski
One Line Diagram Address: 68 Golden Dr, Florence, MA
Solar Installation Installer: NSL
Phone: (413) 246 -7071
William Golaski Residence Solar Installation
68 Golden Drive
Florence, MA
Page 3
Our evaluation of the proposed solar - electric installation has established that the framing is adequate to
support the proposed solar panels without the need for any strengthening.
If you have any questions regarding this matter, please feel free to contact my office at 609 - 489 -5511.
We appreciate the opportunity to assist you with this evaluation.
Sincerely,
MPP Engineers, LLC
\
Scott W. t�':"i "• ' E., LEED AP
Prince r ?''
�ci AS i%'
r7 726
P 'tr C z
Ashutos` ' ';� "'
.a A
MA Prof. Eng. ic. No. 48235
Page 3
William Golaski Residence Solar Installation
68 Golden Drive
Florence, MA
Page 2
Design Snow Loads: 28 PSF (Existing — Unobstructed Warm Roof)
26.18 PSF (New Condition — Slippery Surface on Cold Roof)
Basic Wind Speed: 90 MPH From Table R301.2(4)
Importance Factor: 1.0
Exposure: B
Analysis Results:
General Considerations
The proposed solar panels impose a total weight of approximately 3 pounds per square foot (PSF)
on the roof surface. From a practical standpoint, the International Residential Code allows up to
2 roof coverings on a residential dwelling. Each layer of roofing imposes a net load of about 2.5
to 3.0 PSF on the roof. From this perspective, since the existing roof will have only a single layer
of shingles, a second layer is allowed to be added by the code without analysis. This 2 °d layer of
shingles essentially weighs the same as the proposed solar panels that will be added instead.
➢ Materials such as metal roofs or solar panels are considered a slippery surface. Since the solar
panels are mounted slightly above the roof line, it would be conservative to consider a thermal
factor, Ct of 1.1, treating the panel surface as a cold roof, rather than a warm roof. Based on the
roof slope, the snow load is reduced by 6% compared with the snow loading directly on the
existing shingled roof surface. This reduction equates to approximately 1.8 PSF which offsets the
weight of the panels entirely.
Gravity Loading:
Although the addition of solar panels result in a net reduction in the overall loading (e.g., sliding snow
off a slippery surface), the existing collar ties are overstressed. The collar ties are only 2 x 4 and are
relatively slender given their length. As such, it is recommended that additional 2 x 6 collar ties be
installed between pairs of rafters that don't currently have collar ties. The collar ties shall be the same
length as the existing and be attached to the rafters with a minimum of 7 — 16 d nails on each end.
It is our understanding that the panels will be installed using Unirac Solarmount rails with L- brackets at a
spacing of approximately 41 inches on center (every other rafter). The L- brackets will be fastened
directly into the existing joists with 5/16" diameter by 4" long lag screws. In addition, it is important that
the rail support locations be staggered between adjacent rails so that no single rafter supports more load
than under the existing conditions.
Wind Loading:
Based on our calculations, the net wind loads imposed on the roof framing with a rail attachment spacing
as indicated above will be less than the current loading on the rafters. In addition, provided that the rails
are attached to the roof in a typical staggered fashion, the overall wind loading imposed on the structure
and the individual framing members will not be impacted to any great extent.
Conclusions:
Page 2
....
.ttti
■tt£
Rtf:
set ,
STRUCTURAL ENGINEERS
i1 1 1
July 24, 2012
Mr. Glenn Barresi
Next Step Living Inc.
25 Drydock Ave, 6th Floor
Boston, MA 02210
RE: William Golaski Residence Solar Installation
68 Golden Drive
Florence, MA 01062
Structural Assessment of Roof Framing
MPP Project No: 12 -0408
Dear Mr. Barresi:
Pursuant to your request, MPP Engineers has performed a limited structural evaluation of the roof
framing at the above referenced site to determine if the roof has adequate capacity to support the proposed
solar panels. Our analysis was based on the framing information and configurations provided by Next
Step Living, Inc. The existing residence is located at 68 Golden Drive, Florence, MA.
Structural Data and Code Information
Our analysis was performed in accordance with the requirements of the MA Residential Building Code
780 CMR- Eighth Edition. The main roof of this residence is framed with conventional roof rafters with
collar ties in a gable configuration. It is our understanding that the existing roof is in good condition
and currently has one layer of asphalt shingles. The pertinent data is listed below:
Roof Rafters: 1 1/2 "x 5 1/2" ( #2 Spruce Pine Fir, Hem Fir. D. Fir Assumed)
Rafter Spacing: 16" on center
Roof Slope: 19 Degrees
Horizontal Projected
Length of Rafter
(Horizontal Projection): 15.17 feet
Ceiling Joists: Present
Collar Ties: Present at every other rafter
Roof Sheathing: Plywood sheathing
Condition of Framing: Good
Roof Covering: Asphalt Shingles
Ground Snow Load, Pg: 40 PSF From Table R301.2(5)
Importance Factor, 1: 1.0
Exposure Factor, Ce: 1.0 (Partially Exposed)
Thermal Factor, Ct: 1.1 with Panels (Cold Roof)
1.0 existing condition (Warm Roof)
MPP Engineers, LLC 79 Mill Pond Road Jackson, NJ 08527
609 - 489 -5511 (Phone) 609 - 489 -5916 (Fax)
r
pa's�� MV Nai11v11Od310O 0 L81r6SLSa1 E i® L (ton
olawuw % �
'N■a1NINI NNiir
to s u m o sL'm ous a4LNOMGNaANA af0A411a1I
TWIN= OO imam Ins 'sm S I LL 11N1NAMONUVa d0110 Slit oalluON
N3LLNIM$ANI - 1Ir - AM0 / vorainNrnis mom mom au '4o■N■u nva . laulnsuI io mom
11000101/ AIM MOMS W11iaNVa *woo IMAM SI M aLLrf0MNofMaR
NOW MEW . Viala
•
SANNA011811010110 IIwNNiloalgAlUOUV 111001033M If 1111A1MluV5O11s1aNLVl13
ZtiS ZLOVLI/II 1L41IJIIA1 SOIrMI11WM IN '
wrap 1rnA0,or T! PAIA A
Nni 1
Millar MOWN N V rI LLOLILIttt Milli' mum
Maw' x swam MIMI MUM ere uourll
1 • 1 MUNN
r ovum
• •
Wit- ___ 3anw Iwo -❑ arm
suuiu 1 ti romouirsposi ziivvuNLL L'LOZIwIL b$SNIIDSL Aulown mum r
lM .
! aovvl CJr111)
( 0000llr AO" MUM unroll
. soinV 031
! AIM A11001 SOW as
Orriadl 9O1rW ow
$ MI MI A1101111 01' souiv NNW `
QM A
��a! JA N AOZILWLL LLOZILNLL 00`tONOt AP11l1N7MIOC
2 i'LJ isl_JAan
Viii oM .M.lo!•lmaard 40411!161V.1w0
lifts I LU dS nl
. wow ® sow sore
• anew IMMO 1110111111
• uNtuii MUM MINIM Amon w
aNNI . 11111111111 AIM savousassu.
iiire arm A, OiDI =MINI AWN AMMO WLA1M IMI
wane do mamma a m ocar araustsumc . minx s Now 81111011101111M1 DU AI 1110110AW ilomvarre ru
WO GUM lNN111,0iO1110w* MIA UL AWN J mX auovo aJ$VL As doma OOvoma'11w
OMWVJM111M wassOmmarr siLa>�1 mMOIll OrMOiUOL Nos Nla'�al11111 1Im JO
'an�rlN1! ' N oma* viva %ppm
__ �- -- -- y ,� 1 11 _ r,
_ L.........i ..., ..... a /lwMV lisolika 9
Wig . IGwi11i�C1 _ . �r>tlNnw'
Sarni i o0OI1111110MV =NM OUZO
MUTAi
1f0 O11 WON N lt'No saq�aolry
• • hrums illNOM MIN rlll
-- .. IrMlaa iuLVl�vMrNNt �� Nu
Next Step Living Inc.
Subcontractor List 1
Name Address WC Policy # Insurance WC Policy
carrier Expiration
Date
1. Reilly 14 Norfolk Wc2z11260742011 Liberty 7/31/12
Electrical Ave Mutual Fire
Contractors Easton, MA Insurance
Inc. 02375 co
2. Sheffield 2429 Main WHE9568628 Hanover 6/1/13
Solar Group St Walpole, Ins.
LLC. MA 02081 Companies
The Commonwealth of Massachusetts print "'
= Department of Industrial Accidents
i - :, - : :I " Office of Investigations
VI: ,,, , 600 Washington Street
, r - - ' Boston, MA 02111
y�
kwww.mass.gov /dia
Workers' Compensation Insurance Affidavit: Builders/ Contractors /Electricians /Plumbers
Applicant Information f Please Print Legibly
Name ( Business /Organization/Individual): Pi e K i S f ep �, 4/ 9 .7.t G
Address: 2- S by pnck A vfAoe st1 pc
City/State /Zip: Eta s +o A r MA 022 l y Phone #: 9 6 6 - 917 - 9 7 2 9
Are you an employer? Check the appropriate box: Type of project (required):
1. k I am a employer with 3.p0 4. 1 1 am a general contractor and I 6. New construction
employees (full and/or part- time).* have hired the sub - contractors
2. I am a sole proprietor or partner- listed on the attached sheet. 7. Remodeling
ship and have no employees These sub- contractors have 8. Demolition
working for me in any capacity. employees and have workers' 9. Building addition
[No workers' comp. insurance comp. insurance.#
• required.]
5. We are a corporation and its 10. Electrical repairs or additions
3. J am a homeowner doing all work officers have exercised their 1 1 . Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12. Roof repairs
insurance required.] t c. 152, §1(4), and we have no
employees. [No workers'
13. )(Other So 4— Lt s /a /(
comp. insurance required.]
*Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information.
t homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
■ Contractors that check this box must attached an additional sheet showing the name of the sub - contractors and state whether or not those entities have
employees. If the sub - contractors have employees, they must provide their workers' comp. policy number.
1 am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site
information. _
Insurance Company Name: A. -r! • A• r/1 f Saoc e L n p X 4 y
Policy # or Sclf -ins. Lic. #: 7 / 7 3 3 2 t g Expiration Date: ( /i Z
`' / ` / / 0 106 Z
Job Site Address: d' i r!��� • V City /State /Zip: I.� t� , �!C
/
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one -year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certi under the pains and penalties of pedury that the information provided above i true d correct
U Date:
Phone #: /(7 — 62Z- - V 773
Official use only. Do not write in this area, to be completed by city or town official
City or Town: Permit/License #
Issuing Authority (circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person: Phone #:
SECTION 8 - CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: /� / M Not Applicable ❑
Name of License Holder : uS \' ^ t I u b ki'J / 2 33-C 2-
License Number
2 Iu44.- s S.,,N¢ ;(( M4t. 6 ( 3 76/7 // 3
Address Expirati n Date
C7 -070 Y7
Si pature ° �"� Telephone
9. Reaistered Home Improvement Contractor: Not Applicable ❑
/VA 5'»` (/, ,l r /6 2 ( 1
Company Name 1/ / Registration Number
rx lz 4 622 l /: /i
Address r Expiration Dat
Telephone //724).' V72 5
SECTION 10 WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes No ❑
11. - Home Owner Exemption
The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families
and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts
as supervisor. CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner: Person (s) who own a parcel of land on which he /she resides or intends to reside, on which there
is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm
structures. A person who constructs more than one home in a two -year period shall not be considered a homeowner.
Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he /she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of
Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable)
New House ❑ Addition 0 Replacement Windows Alteration(s) ❑ Roofing ❑
Or Doors C]
Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [Q Siding [0] Other
Brief Descrip jpn of Proposed
Work: 1/1s (�G� a r- Z 6 P� � jpfltr 44$1.1 / 1 7 S /hntt t },. 11..q Sal 1� (4 1, 1 - 1.
Alteration of existing bedroom Yes k No Adding new bedroom Yes No
Attached Narrative Renovating unfinished basement Yes X No
Plans Attached Roll - Sheet
6a. If New house and or addition to existing housing, complete the following:
a. Use of building : One Family Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No .
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a - OWNER AUTHORIZATION - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I , 6 - / k; , as Owner of the subject
property
hereby authorize t fet 57.27 Z. (./4.� / f j iS)in ti as
to act on my behalf, in all matters relative'4o work authofzed by this building permit application.
Signature of Owner Date
.j l ^ IL any J , as Owner /Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
s r, .1 /4,440,J
Print Name
74 7 /
Signature :f Owner /Agent Date
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size • ZG Acre 5 RR/
•
Frontage
Setbacks Front
Side L: R: L: R:
Rear
Building Height
Bldg. Square Footage
Open Space Footage oA
(Lot area minus bldg & paved
parking)
# of Parking Spaces
Fill:
(volume & Location)
A. Has a Special Permit /Variance /Finding ever been issued for /on the site?
NO 0 DON'T KNOW ® YES 0
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DON'T KNOW YES 0
IF YES: enter Book Page and /or Document #
B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW 0 YES 0
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained 0 , Date Issued:
C. Do any signs exist on the property? YES 0 NO (s)
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property ? YES 0 NO
IF YES, describe size, type and location:
E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES 0 NO
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
Department use only
City of Northampton Status of Permit:
Building Department Curb Cut/Driveway Permit .
212 Main Street Sewer /SepticAvaltabikty
AUG I 0 2012 1 Room 100 Water/Well Availability
L N orth ampton, MA 01060 Two Sets of Structural Plans
NQ
°E` :. a RTHAu.� NF ` hone 413 -587 -1240 Fax 413 -587 -1272 Piot/Site Plans
Other Specify_.
APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 - SITE INFORMATION
1.1 Property Address: This section to be completed by office
6' q 6-0/Jr Dr. Map Lot Unit
��o ` ` c 4A fl i0 ric . Zone Overlay District
Elm St. District CB District
SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT
2.1 Owner of ,.`t Record: 4r' . y' � / I ,),, , -/
pit. 6, ,,,,, 6, ,,,,, 6-(114J(; Sk 1125 V? /`. �In ■ 4 C/c'6Z
Name (Print) Current Mailing Address
0 Telephone
Signature
2.2 Authorized Agent:
Nc,c SI ,, 4,,,;iy ; 1C / 3,s // LL0- j "21 °'J% 1),, Avc L,J FL, i3rs*. 1, ,wlA 0)10 Name (Print) Current Mailing Address.
,-,.A— V 17 _6 20 '172 3
Signatur: Telephone
SECTION 3 - ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost (Dollars) to be Official Use Only
completed by permit applicant
1. Building (a) Building Permit Fee
2. Electrical (b) Estimated Total Cost of
Construction from (6)
3. Plumbing Building Permit Fee
4. Mechanical (HVAC)
5. Fire Protection M (,s`� 6. Total = (1 + 2 + 3 + 4 + 5) L y / g y 3 Check Number 3 f
This Section For Official Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner /Inspector of Buildings Date _
File # BP- 2013 -0153
APPLICANT /CONTACT PERSON NEXT STEP LIVING INC
ADDRESS /PHONE 25 DRYDOCK AVE 5TH FLR BOSTON (617) 670 -4723 0
PROPERTY LOCATION 68 GOLDEN DR
MAP 29 PARCEL 429 001 ZONE
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out
Fee Paid Anv
Typeof Construction: INSTALL SOLAR PANELS
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License 81022
3 sets of Plans / Plot Plan
THE FOL WING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFO ATION PRESENTED:
Approved Additional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND /OR Special Permit With Site Plan
Major Project: Site Plan AND /OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received & Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
C "'" -7 -/
:nature of Building 0 icial Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning & Development for more information.
68 GOLDEN DR BP- 2013 -0153
GIS #: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 29 - 429 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR PANELS BUILDING PERMIT
Permit # BP- 2013 -0153
Project # JS- 2013- 000251
Est. Cost: $24843.00
Fee: $148.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: NEXT STEP LIVING INC 81022
Lot Size(sq. ft.): 11412.72 Owner: GOLASKI KATHLEEN L & WILLIAM J
Zoning: Applicant: NEXT STEP LIVING INC
AT: 68 GOLDEN DR
Applicant Address: Phone: Insurance:
25 DRYDOCK AVE 5TH FLR (617) 670 -4723 () WC
BOSTONMA02210 ISSUED ON:9/7/2012 0:00:00
TO PERFORM THE FOLLOWING WORK: INSTALL SOLAR PANELS
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House # Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace /Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 9/7/2012 0:00:00 $148.00
212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272
Louis Hasbrouck — Building Commissioner