32A-231 (4) 3 0 7 / 9 - d - 3
September 15, 2010
To: Northampton Building Commissioner 1 r, 2010
From: Gregory Parigian
44 Pomeroy Terrace
Northampton, MA 01060 -3304
Building Commissioner:
On 3/23/10 our contractor pulled a building permit ( #BP- 2010 -0828) to renovate the
second floor of our home on Pomeroy Terrace. Our contractor inadvertently omitted
from the description of work to be performed that the renovation included converting the
dwelling from a two family to a single family residence. Essentially that meant removing
the kitchen from the second floor. Please update your records to indicate the conversion
and please pass that information on to the Assessors Office so that the dwelling can be
correctly listed as a single family. If you have any questions or there is any further
information needed, I can be reached at home at 582 -7076. Thank you very much.
•
•
Gregory Parigian
' •
z
KE/(t)
1
". 4 \
HOME OWNER EXEMPTION ACKNOWLEDGEMENT
The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to
act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s)
who owns a parcel on which he/she resides or intends to be, a one or two family
dwelling, attached or detached structures accessory to such use and/or farm structures. A
person who constructs more than one home in a two -year period shall not be considered a
home owner."
The building department for the City of Northampton wants person(s) who seek to use
the home owner exemption, to act as their own construction supervisor, to be aware that
by doing so you become responsible for compliance with state building codes and
regulations. The inspection process requires that the building department be called to
inspect work at various stages, which include foundation /footings (before backfill)
sonotube holes (before pour), a rough building inspection (before work is
concealed), insulation inspection (if required) and a final building inspection. The
building department requires these inspections before the work is concealed, failure to
secure these inspections can result in failure to obtain a certificate of occupancy
until the work can be inspected.
lithe homeowner hires other trades to perform work (electrical, plumbing & gas) the
homeowner will be responsible to make sure that the trades hired secure their proper
permits in conjunction to the building permit issued, and that they get their required
inspections. Failure of the individual trades to secure the permits and inspections as
required can DELAY the project until such time as the proper permits and inspections are
made
understand the above.
(Home owner /resident's signature requesting exemption)
I will call to schedule all required building inspections necessary for the building permit
issued to me.
Date
Address of work
location
•
The Commonwealth of Massachusetts
• Department of Industrial Accidents
= '=�M► Office of Investigations
600 Washington Street
= Boston, MA 02111
: . - • www.massgov /din
Workers' Compensation Insurance Affidavit: Builders/ Contractors /Electricians/PIumbers
Applicant Information - / Please Print Legibly
•
Name (Business/Organization /Individual): D P r' i L H t `v i rI -
Address: 15 \n/ y i i A 'h I ,o rf .
City /State/Zip: 1- L a �Z. 6 r! C. r Phone. #: Z 0. 1 `i
Are you an employer? Check the appropriate box: . Type of project (required) : /
1. ❑ I am a employer with 4. . ❑ I am a general contractor and I 6. ❑ New construction
employees (full and/or part-time).* have hired the sub- contractors
2. L I am a sole proprietor or partner- listed on the attached sheet 7. remodeling
ship and have no e.wloyees These sub - contractors have. 8. ❑ Demolition
working for me in any capacity. eaiIoyees_and have workers' •
9 Buil '- addition
[No workers -' comp. ins- rranee t;C3IIrp. menrant a #. 0 .
required.] 5. ❑ We are a corporation and its 10 ❑Electrical repairs or additions
3. ❑ I am a homeowner doing all work officers havexercised their I1. Plu mb' ❑ mg repairs or additions
right of exemption per MGL
myself. [No workers comp. 12.0 Roof repairs •
insurance required_] t c: 152, §1(4), and we have no
employees. [No workers' 13.❑ Other
comp. insurance required.].
*Any applicant -that checks box #.1 must a lso fill out the section below showing their *miters' compensation policy information:
t Homeowners who submit this atfidavit.indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such_
:Contractors that check this box must attached an additional sheet showing the name of the subcontractors and state whether or notthose entities have
employees. If the sub - contractors have employees, they must provide their workers' comp. pokey number.
I am an employer that is providing workers' compensation insurance for iny employees Below is the policy and job site
information.
Insurance Company Nance: l • •
Policy # or Self -ins. Lic. # Expiration Date:
Job Site Address: City/Sta -
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A ofMGL'c. 152 can lead to the imposition of c=imn 1 penalties of a
fine up to $1,500.00 and/or one -year imprisonment, as well as civil penalties in the form ofa STOP WORK ORDER and a fine
of up to $250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Offce of
Tavesttt?ations of the DIA for insurance` coverage erification
I do hereby ce. tFie pains.and penalties ofperjury that the information providednbove_ •
Sitmatdre: ( Date: 7 ' . 17 I i
Phone it: Z 4 O , 16 .►
- Official use only. Do not write in this area, to be completed by city or town ' official
City or Town: Permit/License #
Issuing Authority (circle one):
:1. Board of Health 2. Building Department 3. City/Town Clerk . 4. Electricaljnspector 5. Plumbing Inspector
6.Other +�
Contact Person: Phone #:
SECTION 8 CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: L � ( f Not Applicable ❑
Name of License Holder : I f C t f"
License Number
I S G vn/E.Yi 1- 1A /IN Tor ID 1 .)-() /I
Address / Expiration Date
�–L0�Er , J1A of 06
Signature Telephone
-- 1 \ .—/ ____ z o . 1 6
9. =Re iistereri Hornerhnor ebiebtl onfractbr,.f x .. 111 11 1` .. ». Not Applicable ❑
� 6
I6 2 5
Company Name Registration Number
<A'7F Io i26 1 it
Address Expiration Date
Telephone
SECTION 10- WORKERS' COMPENSATION' INSURANCE AFFIDAVIT (M.G.L. c. 452,:12
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes [B No ❑
t - Hltme thoner �teltt
The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families
and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts
as supervisor. CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner: Person (s) who own a parcel of land on which he /she resides or intends to reside, on which there
is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm
structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he /she shall. be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of
Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature 74 1 A
SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable)
New House ❑ Addition ❑ Replacement�dows Alteration(s) ❑ Roofing ❑
Or Doors
Accessory Bldg. ❑ Demolition New Signs [0] Decks [p Siding [0] Other [0]
Brief Description of Proposed es t 0 V A - 1 a 1 E It I () - r G ' N r 0 p
Work: t'
Alteration of existing bedroom Yes No Adding new bedroom Yes No
Attached Narrative Renovating unfinished basement Yes ✓ No
Plans Attached Roll - Sheet
a. Use of building : One Family Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No .
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a - OWNER AUTHORIZATION - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
P A R I c i J , as Owner of the subject
property
hereby authorize /PNI-1 r
i F L O t .r/ i r i l
to act o behalf, in all r, atte •- relative to work authorized by this building permit application.
`>11
Signature of Own- '- Date
, as Owner /Authorized
LoseDlllereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Print Name
N---/ i/)-7/1\)
Signature of Own /Agent Date
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
-- 1 r �_ „
Lot Size 1 :
Frontage ; $ 1 I
t
Setbacks Front i El
Side Li 1 R: L:! . R:' 1 1 £ � __
LJ � 1
Rear 1
Building Height
1 1 .
Bldg. Square Footage 1 [----1 % [ i i
Open Space Footage
(Lot area minus bldg & paved � # L I
parking)
# of Parking Spaces l i i L,
Fill: d 11
(volume & Location) 1 jl , C
A. Has a Special Permit /Variance /Finding ever been issued for /on the site?
NO 0 DONT KNOW 0 YES 0
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DONT KNOW 0 YES 0
IF YES: enter Book Pag #
and /or Document „ mm _ _
B. Does the site contain a brook, body of water or wetlands? NO ey DONT KNOW 0 YES 0
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained 0 Obtained , Date Issued:
C. Do any signs exist on the property? YES 0 NO
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO e
IF YES, describe size, type and location:
E. WiJI the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES 0 NO a
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
City of Northampton
Building Department
212 Main Street
Room 100 = r
Northampton, MA 01060
phone 413 -587 -1240 Fax 413 - 587 -1272
APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1- SITE INFORMATION
1.1 Property Address: p This section to be completed by office
1 L Q 'f\ E ) Map Lot Unit
Zone Overlay District
EIm St: District CB District
SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT
2.1 Owner of Record:
G FG p A R i e A ro' 414 po' P Z oY TE Rk A c F
Name (ant) Current Mailing Address: ` z 7 C 7
</ Telephone `' 0
Signature
2.2 Authorized Agent:
1) A9 Z- HEvit I4OLI v/4 -11- t,A rt. PT 12 D.
Name (Print) Current Mailing Address:
� �--�� --�
'2_50. 14 E l
Signature Telephone
SECTION 3 - ESTIMATED CONSTRUCTION 'COSTS
Item Estimated Cost (Dollars) to be Official Use Only
completed by permit applicant
1. Building 3. 5-, D 9 J (a) Building Permit Fee
2. Electrical o o o (b) Estimated Total Cost of
r Construction from (6)
3. Plumbing 5 & 0 0 Building Permit Fee
r
4. Mechanical (HVAC) I 5, coo
5. Fire Protection '
6. Total = (1 +2 +3 +4 +5) 0 Check Number f q3 IS 3 ltQ
This Section For Official Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner /Inspector of Buildings Date
File # BP- 2010 -0828
APPLICANT /CONTACT PERSON DANIEL HEWINS
ADDRESS /PHONE 1504 WESTHAMPTON RD FLORENCE (413) 582 -9929
PROPERTY LOCATION 44 POMEROY TER
MAP 32A PARCEL 231 001 ZONE SC(25)/URC(75)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out di t y / n
Fee Paid ;f �S (�(/
Typeof Construction: REMODEL 2ND FLOOR
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License 049714
3 sets of Plans / Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFQRMATION PRESENTED:
L" Approved Additional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND /OR Special Permit With Site Plan
Major Project: Site Plan AND /OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received & Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Demolition Delay
323110
Signature of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning & Development for more information.
6
44 POMEROY TER A, BP- 2010 -0828
GIS #: COMMONWEALTH OF MASSACHUSETTS
Map :Block: 32A 231 1 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: BUILDING PERMIT
Permit # BP- 2010 -0828
Project # JS- 2010- 001219
Est. Cost: $60000.00
Fee: $360.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: DANIEL HEWINS 049714
Lot Size(sq. ft.): 24524.28 Owner: PARIGIAN GREGORY H
Zoning: SC(25)/URC(75)/ Applicant: DANIEL HEWINS
AT: 44 POMEROY TER
Applicant Address: Phone: Insurance:
1504 WESTHAMPTON RD (413) 582 - 9929
FLORENCEMA01062 ISSUED ON :3/23/2010 0:00:00
TO PERFORM THE FOLLOWING WORK: REMODEL 2ND FLOOR
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House # Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace /Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 3/23/2010 0:00:00 $360.00
212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272
Building Commissioner - Anthony Patillo