31A-321 :v 4 , t.) i 1 A -�71 110.2 140
s ,
J J 126 70 70
v � 11105
3 iJ •� •,�. 140 26
J109;5e� , 100 110.2 31A-305
1�
140 1 31A 313 140
• 93.. 31A -318 105
55.6 105 '
4 100 31A 1 -
82 140 140
99 101.6 111.6
58.14
4 31A-317 25 31A-321 �,
140 270
5 L' 43
V .s i ,� _ 112.
,e-�^P,ti 31A 322
180 140 31A -320 - in 31A -3 .4c
1 In ous-Q.
3 A-316
39 70 97
160
WARD AVE 70 70
MI117,11M 70 70
70
- r . _�- { � S , .rs � bid 0c C -006 V C-107," 1C!0 08 .31 =009, 31 • 021
)02 ' ,or .. /% ,Af J /A //4
i Zoning Overlays
1:4141 General Industrial I - FFR Fangs, Forest
HOME OWNER EXEMPTION ACKNOWLEDGEMENT
The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to
act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s)
who owns a parcel on which he/she resides or intends to be, a one or two family
dwelling, attached or detached structures accessory to such use and/or farm structures. A
person who constructs more than one home in a two -year period shall not be considered a
home owner."
The building department for the City of Northampton wants person(s) who seek to use
the home owner exemption, to act as their own construction supervisor, to be aware that
by doing so you become responsible for compliance with state building codes and
regulations. The inspection process requires that the building department be called to
inspect work at various stages, which include foundation /footings (before backfill)
sonotube holes (before pour), a rough building inspection (before work is
concealed), insulation inspection (if required) and a final building inspection. The
building department requires these inspections before the work is concealed, failure to
secure these inspections can result in failure to obtain a certificate of occupancy
until the work can be inspected.
If the homeowner hires other trades to perform work (electrical, plumbing & gas) the
homeowner will be responsible to make sure that the trades hired secure their proper
jermits in conjunction to the building permit issued, and that they get their required
inspections. Failure of the individual trades to secure the permits and inspections as
required can DELAY the project until such time as the proper permits and inspections are
made
J i, understand the above.
(Home owner /resident's signature requesting exemption)
I will call to schedule all required building inspections necessary for the building permit
issued to me.
Date
Address of work
location
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
=...
p 600 Washington Street
Boston, MA 02111
www.mass.gov/dia
•
Workers' Compensation Insurance Affidavit Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legiblv
Name pusineseorganizationfindivid.D:
Address: -
City/State/Zip: Phone.#:
Are you an employer? Check the appropriate box: Type of project (required): /
1. D I am a employer with 4. 0 I am a general contractor and I
6. 0 New construction
have hired the sub-contractors
employees (fall and/or part-time).*
listed on the attached sheet. 7. 0 Remodeling
2. 0 I am a sole proprietor or pannier-
These sub--contractors have
ship and ha.ve no =ployees 8. 0 Demolidon
working for me in any capacity errmloyeas and have workers •
9. 0 Buildiarg 5:dation
[No workers' comp. insurance _ comp.insin-Arre
10.0 Electrical repairs or adcations
requirel] 5. We are a corporation and its
•
3.1KI I am a homeowner doing all work officers ha their
11.0 Plumbing repairs or additions
myself [No workers' co mp. lien of exemption per MGL
12.0 Roof repairs .
insurance required.] t c. 152, §1(4), and we have no
employees. [No workers' 13.0 Othe] -
.
comp. brsumnce require.d.]
*Any applic:ant that checks box #1 must Aso fill out the section belay/showing theirworicers' • compensation policy information.
t Homeowners who subrnit this affidavit inclicating they am doing all work and then hire outside contractors must submit a new affidavit indicating ntrh
1 C.ontractors that check this box must attached m additional sheet showing the name of the sub-contractors and state wheth er or not those entities have
employees. If the sub-contractors have employees, they must provide their workers' comp policy lumber.
I am an employer that & providing workers' compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: -
Policy # or Self-ins. Lic. •#: Expiration Date: -
Job Site Address: City/Sta/Zip:'
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required wider Section 25A OfYIG-L c 152 can lead to the imPosition of Criminal penalties of a
fine up to S1,500.00 ancVor one-year imprisonment, as well as civil penalties in the form of a STOP WORK-ORDER and a Buie
()flip to $250 00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
TifialtiiiitionlOfthi DIA. for insinince cove enfic�rL
_ I tlei jzeiebj certz under the pains a n d penalties ofperjury that the information provided ribove_is_true_and_correri
di^
Jig/ratite L41111 at;
Phone
• Official use only. Do not write in this area, to be completed by city or town official
• City or Tovvn: ". Permit/License #
Issuing Authority (circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6. Other f- •
Contact Person: Phone #:
SECTION 8 - CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holder :
License Number
Address Expiration Date
Signature Telephone
9� ntrac i zrnsuirw k 1 x., _, ., Not Applicable ❑
Company Name Registration Number
Address Expiration Date
Telephone
SECTION 10- WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M.GL. c. 152, § 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes ❑ No ❑
The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families
and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts
as supervisor. CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner: Person (s) who own a parcel of land on which he /she resides or intends to reside, on which there
is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm
structures. A person who constructs more than one home in a two -year period shall not be considered a homeowner.
Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he /she shall be
responsible for all such work performed under the buildine permit.
As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned "homeowner" c) ifies and assumes responsibility for compliance with the State Building Code, City of
Northampton Ordinances, State . , Local Zoning Laws and State of Massachusetts General Laws Annotated.
I
/H omeowner Signature ML
SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable)
New House ❑ Addition p Replacement Windows Alteration(s) ❑ Roofing ❑
Or Doors ❑
Accessory Bldg. 12CI Demolition ❑ New Signs (CI] Decks [p Siding (01 Other [DJ
Brief Description of Proposed V 57t-R_0(-
Work:
Alteration of existing bedroom Yes No Adding new bedroom Yes No
Attached Narrative Renovating unfinished basement Yes No
Plans Attached Roll - Sheet
00 s t tS ;soi l s v ddits1"t +D =; rm 'rlQ. �It`vitiosiii 11 t1p:
a. Use of building : One Family Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of construction
i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes No .
I. Septic Tank City Sewer Private well City water Supply
SECTION 7a - OWNER AUTHORIZATION - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
, as Owner of the subject
property
hereby authorize
to act on my behalf, in all matters relative to work authorized by this building permit application.
Signature of Owner Date
, as Owner /Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
P Name
Print
V Signature of Owner /Agent alleSalni Date L� M _A -6
f
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This colunm to be filled in by
�/ / Building Department
Lot Size . / ? a ( I
1r
Frontage L
, t 1
Setbacks Front 3 J ..__._J i
Side L:l R: J L:1 > R:
Rear
Building Height f i � -1 !
t
Bldg. Square Footage F' 1 1 % I I
Open Space Footage
(Lot area minus bldg & paved [ ,. € L m
parking)
# of Parking Spaces 1 --- ---, _ -,
�
i
Fill: .�.,.....�a..... _ ���..� �,
(volume & Location) i
A. Has a Special Permit /Variance /Finding ever been issued for /on the site?
NO 0 DONT KNOW 0 YES 0
IF YES, date issued:1
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DONT KNOW 0 YES 0
IF YES: enter Book
I Pa i and /or Document #
B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES 0
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained ® Obtained
0 ,Date Issued
C. Do any signs exist on the property? YES 0 NO 0
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO Q
I
IF YES, describe size, type and location: 1
E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES 0 NO 0
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
1
City of Northampton $ e
Building Department
212 Main Street
Room 100 F°
BUG 3 n ' Northampton, MA 01060 ; : .
phone 413- -1240 Fax 413 - 587 -1272 `
APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address:
This section to be completed by office
wog �{/ -si- Lot Unit
Zone " OverllayDistrict
EIm"St District CB District
SECTION 2 PROPERTY OWNERSHIP /AUTHORIZED AGENT
2.1 Owner ofRecord: �} r� p /L
U jiiJlurYau_ s�►''�� �u WO,r �� rx' T' 1�1ve/yvIA1L - A/U a
Name (Print) Current Mailing Address: 01C40
L 1 J e_ w ► 1 f(A
Signature Telephone d J — — 'T b9
2.2 Authorized Agent:
Name (Print) Current Mailing Address:
Signature Telephone
SECTION 3 - 'ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost (Dollars) to be Official Use Only
completed by permit applicant
1. Building 1 (a) Building Permit Fee
2. Electrical 1 I (b) Estimated Total Cost of
Construction from (6)
3. Plumbing Building Permit Fee
4. Mechanical (HVAC)
5. Fire Protection
6. Total = (1 + 2 + 3 + 4 + 5)' cQ C Check Number ��
This Section For Official Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner/lnspector of Buildings Date
File # BP- 2011 -0082
APPLICANT /CONTACT PERSON NEWMAN LISA & DANG HUYNH
ADDRESS /PHONE 27 WARD AVE NORTHAMPTON (413) 207 -1769 Q
PROPERTY LOCATION 27 WARD AVE
MAP 31A PARCEL 321 001 ZONE URA(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out ✓�j
Fee Paid
Construction: ERECT 10 X 12 SHED
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License
3 sets of Plans / Plot Plan
THE F LLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
I F MATION PRESENTED:
Approved _ Additional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND /OR Special Permit With Site Plan
Major Project: Site Plan AND /OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received & Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission _ Permit DPW Storm Water Management
Demolition Delay
---- csiqlo
Signature of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning & Development for more information.
•
7 WARD AVE BP- 2011 -0082
GIS #: COMMONWEALTH OF MASSACHUSETTS
sek : 31A -3 '1 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: BUILDING PERMIT
Permit# BP- 2011 -0082
Project # JS- 2011- 000141
Est. Cost: $1000.00
Fee: $25.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: Homeowner as Contractor
Lot Size(sq. ft.): 14984.64 Owner: NEWMAN LISA & DANG HUYNH
Zoning: URA(100)/ Applicant: NEWMAN LISA & DANG HUYNH
AT: 27 WARD AVE
Applicant Address: Phone: Insurance:
27 WARD AVE (413) 207 -1769 0
NORTHAMPTONMA01060 ISSUED ON:8/9/2010 0:00:00
TO PERFORM THE FOLLOWING WORK: ERECT 10 X 12 SHED
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House # Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace /Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 8/9/2010 0:00:00 $25.00
212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272
Louis Hasbrouck — Building Commissioner