38B-234 //if71 -J‘
to
t5)-NV
Map lot block Frontage Median
38B- 201- 00138B -201 60 17
38B- 202- 00138B -202 80 30
38B- 203- 00138B -203 60 30
38B - 204- 00138B -204 30 35
38B- 205- 00138B -205 30 45
38B- 206- 00138B -206 60 50
38B- 207- 00138B -207 60 50
38B- 208- 00138B -208 96 51
38B- 210- 00138B -210 75 52
388-213- 00138B -213 90 53
388- 214- 00138B -214 109 55
38B- 220- 00138B -220 35 57
388- 221- 00138B -221 55 59
38B -222- 00138B -222 60 60
38B-223-00138B-223 60 60
38B- 224- 00138B -224 59 60
38B- 225- 00138B -225 60 60
38B- 226- 001388-226 60 60
38B- 227- 00138B -227 60 60
38B-229-00138B-229 60 60
38B- 230- 00138B -230 68 60
38B- 232- 00138B -232 328 60
38B- 233- 00138B -233 65 60
38B- 234 - 09138E 234 120 60
38B- 235- 00138B -235 60 60 median
38B- 236- 00138B -236 60 60
38B- 237- 00138B -237 60 60
38B- 238- 00138B -238 60 60
38B- 239- 00138B -239 110 60
38B- 250- 00138B -250 50 60
38B- 251- 00138B -251 52 60
38B- 252- 00138B -252 53 65
38B- 253- 00138B -253 51 68
38B- 254- 00138B -254 60 70
38B- 255- 00138B -255 60 75
38B- 256- 00138B -256 57 80
38B - 257- 00138B -257 60 80
38B- 258- 00138B -258 70 89
38B- 259- 00138B -259 50 90
38B-260-00138B-260 60 96
38B- 304- 00138B -304 114 109
38B- 305- 00138B -305 109 109
38B-306-00138B-306 120 110
38B- 315- 00138B -315 254 114
38B- 317- 00138B -317 193 120
38D- 064- 00138D -064 45 120
38D- 065- 00138D -065 17 193
38D- 066- 00138D -066 89 254
38D- 076- 00138D -076 80 328
Applicant proposes to subdivide existing lot at 52 Olive Street into two lots and to build a
new single- family dwelling on the newly created lot per attached plans. This subdivision
is allowable per chapter 350 -6.3 of the Northampton Code of Ordinances, quoted below:
350 -6.3
Dimensional averaging. The Planning Board may issue a special permit, in accordance with § 350 - 10.10,
changing frontage, lot depths, setbacks, building coverage and open space (but not other dimensional)
requirements for a residential lot within any residential (R) district only when the following conditions have
been met:
(1) The new dimensional requirements must be at least as stringent as the median of that dimension for all
lots where any portion of those lots is within 300 feet of the subject parcel and within the same zoning district
as the subject parcel; and
(2) The requested special permit will provide infill development, open space for public use, or affordable
units; and
(3) A list of all applicable dimensional measurements for lots within 300 (as calculated above) must be filed
with the special permit application as described in the Planning Board's bylaws.
The proposed dwelling would be a zero lot line development per chapter 350 -10.14 of the
Northampton Code of Ordinances, quoted below:
350 -10.14
Zero lot line (ZLL) developments are developments, or portions of developments, where house lots have a
minimum side yard setback of zero feet on one side (the "zero lot line'), while the opposite side meets the
standard side yard setback of the district, if the following standards are met:
A. If a garage or other parking structure is built, it must be set back at least twice the normal front yard
setback, or the garage /structure must cover no more than 25% of the front facade of the principal structure;
and
B. The zero lot line side of a house must:
(1) Abut permanently protected open space; or
(2) Abut the lot line of a lot which is under the control of the same property owner at the time the zero lot line
development is proposed.;
C. A five -foot maintenance easement must be granted to the owner of a house on a zero lot line by the
abutting property to allow normal maintenance. Said easement may allow a roof overhang of up to two feet
and may allow roof drainage to sheet flow into the easement area. in addition, private covenants may be
required to insure proper maintenance of the house abutting the zero lot line; and
D. There shall be a minimum of four shade trees of not less than 2.5 inches' caliper planted or maintained
on each lot, including two along the street frontage. (See also § 350- 6.5D.)
The proposed subdivision satisfies B.(2) of the chapter, as well as the others.
10. Do any signs exist on the property? YES NO
IF YES, describe size, type and location:
Are there any proposed changes to or additions of signs intended for the property? YES NO
IF YES, describe size, type and location:
11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common
plan of development that will disturb over 1 acre? YES NO
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
ZONING
Lot Size
13
Frontage
/ 6o/6',0
Setbacks Front + � � p (i Z p �--Q '� 1 ZC7/ --C)
- „
r0
Side L: f 1 R: 10 L: / R :� �� L: / ' R:
Rear
yl ' S Zo
Building Height
Building Square Footage
/ go ZOO
% Open Space: (lot area
minus building Et paved 9/ 3 , /2-g / y
parking p r
# of Parking Spaces
# of Loading Docks
Fill:
(volume Et location)
13. Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: $ /6 Z' Z- Applicant's Signatu - 4.
NOT : Iss v ante of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health, Conservation Commission,
Historic and Architectural Boards, Department of Public Works and other applicable permit granting
authorities.
W: \Documents\ FORMS \original \Building - Inspector \Zoning- Permit - Application- passive.doc 8/4/2004
Fa Z O Low i- 16
!En File No. I/ Plc /d=6
DEPT. OF BUILDING .. ► i G PERMI T APPLJ CATION { YV.2)
Please type or print all information and return this form to the Building
Inspector's Office with the $i5 filing fee (check or money order) payable to the
City of Northampton.
1. Name of Applicant: 1 rtM CTO t
Address:ZO 1 01 .., V>,f %IA- i j We - 5 P- t- 4fiM(t1 Telephone:4( - 6�.S - Z-Z64 -
2. Owner of Property: L I k - s - )A � � i C-T--■3 \ 31.$ 6-4 \\ -----
Address: 2 0 ivv'c" 1 TiG tZ� e3-try y , ri Telephone: 4 l3 -- zlcl— 1 56 G
3. Status of Applicant: Owner Contract Purchaser Lessee Other (explain) r.5 ._
4. Job Location: -C 2 L\ 1J t� Cdr t o \ tAVkird
Parcel 1d. Zoning Map# Parcel# District(s):
In Elm Street District In Central Business District
`(TO, BE FILLED IN BY THE BUILDING DEPARTMENT)
5. Existing Use of Structure /Property: y - 6 - 1 7 > Z< E2<\ ST) r it,--k Lr-37 UJ / i Zd ' - i p"F
y e A Eo �;tgh-1 , oil 6 S 7t&LJ -T-13 - (�) t?cc/6t -fe 11
I i sie, 1 / tom/ 6
6. Description of Proposed Use /Work /Project /Occupation: (Use additional sheets if necessary):
S.0 f, s671 S ly A —
7. Attached Plans: Sketch Plan Site Plan Engineered /Surveyed Plans
8. Has a Special Permit /Variance /Finding ever been issued for /on the site?
NO DON'T KNOW 7S YES IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DON'T KNOW YES
IF YES: enter Book Page and /or Document #
9.Does the site contain a brook, body of water or wetlands? NO x DON'T KNOW YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained , date issued:
(Form Continues On Other Side)
8 /4/2004
W: \Docu rents\ FORMS \original \Building - Inspector\Zoning - Permit - Application- passive.doc
File # MP -2012 -0125 n ��
APPLICANT /CONTACT PERSON TIMOTHY STOKES
20 TURKEY HILL RD (413) 695 -2264 Q a1) 4
PROPERTY LOCATION 52 OLIVE ST p
MAP 38B PARCEL 234 001 ZONE URB(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT��� � /t7
Fee Paid
Building Permit Filled out
Fee Paid
Typeof Construction: ZPA - SUBDIVIDE LOT
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License
3 sets of Plans / Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESFNTED:
Approved tAdditional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER : §
Intermediate Project : Site Plan AND /OR Special Permit with Site Plan
Major Project: Site Plan AND /OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
3c0 9 3(7) OA Finding Special Permit Variance*
S ' 1 )
Received & Recorded at Registry of Deeds Proof Enclosed S 000 -`F w'
Other Permits Required:
tart St-Eb �'�'�
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
ue ' 7/ 2—
Signature of Building Official Date //
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning & Development for more information.