38B-131 exposes fiberglass insulation and finds black insulation, which is dirt filter out of the air moving through
the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements.
26. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4.
27. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note: ThruLoks
are engineered for post attachment supporting a railing.
28. Smoke and CO detectors as required. 780 CMR R314 and R315.
29. Closets beneath stair which have doors must be drywalled with %2 ". 780 CMR R302.7
Relevant items must be submitted to the building department for approvals before inspections and or CO can be
signed. Other items are intended to avoid costly issues at inspections.
Feel free to call if you have any questions. My telephone number is 587 -1240 and office hours are Monday
through Friday, 8:30 am to 4:30 pm, excepting we close for walk -ins at 12:00 noon on Wee nes. ays. My emai
address is: cmiller
Thank you for your cooperation on these mat .
411101
i
Chuck Miller
City of Northampton
Assistant Commissioner and Zoning Enforcement
12. Hazardous glazing locations, within 24" of a door, or within 60" of a stair, or across from hot tubs, spas,
bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4
13. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4"
sphere rule. Order restrictors. 780 CMR R612.2
14. Egress and emergency escape requirements shall be strictly met.
a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310
b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20 "x41" exception 5 sqft
at 1 floor. Minimum clear opening 20 "x24" or 24 "x20 ". 780 CMR R310.1.1
c. Two doors remote as possible at the normal level of travel, opening measured from the face of
the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR
R311.2
d. Landing at each door 36" out and the width of the door minimum 36 ", maximum step 7 3 /" from
the top of the threshold and only in- swinging doors. 780 CMR R311.3
15. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9 ",
maximum riser 8 % ", maximum overall variance for the run is 3/8 ", 4" sphere rule on risers except where
the total rise is 30" or less 780 CMR R311.7.4.3 Exception, 4 3/8" on balustrade, 6" in the triangle.
Graspable rail 1 'A" minimum and 2" maximum rail, height minimum 34" maximum 38 ", required for 4 or
more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. 780
CMR R311.7.
16. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than
30" above floor or grade within 36 ", 4" sphere rule. 780 CMR R312.1.
17. Educate the plumber and electrician about maximum notch and hole sizes, and placement. 780 CMR
R502.8 and R602.6. In bearing studs holes not larger than 40% of a stud no closer than 5/8 to the edge,
In interior non - bearing studs holes not larger than 60% of a stud no closer than 5/8 to the edge, in
bearing walls if more than 50% of a plate is cut or notched a 1 %Z 16ga. strap must extend a minimum of
6" past the cut both directions and be nailed with 8 -10d per side, or holes in joist are a maximum 1/3
the depth not closer than 2" from the top or bottom. Notches are different.
18. Dryer duct transition is limited to 8' of aluminum flex and must be exposed. 780 CMR M1502.4.3
19. Dryer duct maximum equivalent length is 25' or per manufacturer's specs. 780 CMR M1502.4.4.1, no
screwed connections.
20. Markup air is required for any exhaust hood of 400 CFM or more. 780 CMR M1503.4
21. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work
maintaining 1" clearance for 5' from the duct outlet for all fireplaces
22. Fire and draft stopping shall be completed before rough inspection. 780 CMR R302.
23. Ignition barriers in place before final. 780 CMR R316.
24. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC.
a. An initial HERS evaluation is required including insulation levels anticipated.
b. A final HERS evaluation confirming code requirements have been met including duct testing.
c. Energy information including mechanical equipment posted on the electric panel.
d. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star
Building Option Package.
25. Vapor retarders. Although these are still in the code have exceptions, one must understand that there is
a difference between a vapor retarder or barrier and an air barrier. An air barrier is intended to stop air
flow (convection) a vapor retarder or barrier is intended to stop molecular moisture transfer (diffusion).
A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has
to be absolute and complete. If air can leak through an electrical device or through a crack it follows the
path of least resistance and carries 99% of the moisture in a structure. This is evident every time one
1
City of Northampton
Massachusetts . ,r
�
i 4 # 1 DEPARTMENT OF BUILDING INSPECTIONS l
y :
�, - 21 Main Street • Municipal Building
Northampton, MA 01060 '' j \ '
INSPECTOR
John Joyce April 11, 2012
78 Timber Drive
East Longmeadow, MA 01028
Subject Location: 22 East Street
Map Block: 38B -131
Mr. Joyce,
These are a few items which will need to be included;
1. All none prescriptive members, LVL and I- Joist, require stamped engineering. (wet stamp not
required)
2. #*footing rebar must be bonded.
3. CO detector added in the Entry.
4. If there isn't a CO on the 2 " floor it must be added.
5. Windows 72" AFG with an opening within 24" AFF must have a restrictor to meet 4" sphere rule.
6. Exterior wall insulation should be R -20, absolute air sealing is required, and windows must be Energy
Star. See the 2009 IECC for additional mandatory energy measures.
As of August 4 2011 the 8 Edition MA code is the 2009 IRC with MA amendments.
In the following are some generic requirements which seem to be problematic.
This is not a substitute for purchasing and reading the MA codes.
1. Structures shall conform to 780 CMR 8 Edition 1 and 2 family building codes with MA amendments.
2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements.
3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I
soils (table R405.1)
4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.
5. Ceiling joist are intended to prevent spread, once raised above the wall plate they become rafters ties
and may require up sizing of rafters and increased nailing for example with a 4" slope 8 -16nd common
are required at each connection. 780 CMR R802.3.1.
6. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1 / 3rd 780 CMR
R802.3.1
7. Ridge boards must be the full depth of the cut. 780 CMR R802.3.
8. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and
number of jack studs required.
9. All framing materials which are not code prescriptive must have stamped engineering.
a. LVLs
b. I -joist and or Floor Truss
c. Roof truss
10. A braced wall plan identifying appropriate braced wall areas and braced wall method being used. 780
CMR 602.10.
a. Garage corners and large corner window /door layout may require special solutions.
b. All corners must be appropriately attached to the foundation.
11. Ceiling heights minimum 7' for habitable spaces, 6'8" for bathrooms includes tub /shower area if a
shower head is used, 6'8" for basements, 6'4" at beams /ducts. 780 CMR R305.1. MA amended
200 I Energy
Efficiency Certifi
Insulation Rating R -Value
Ceiling / Roof 38.00
Wall 19.00
Floor / Foundation 30.00
Ductwork (unconditioned spaces):
-
Glass & Door Rating U- Factor SHGC
Window 0.27
Door 0.19 NA
Heating & Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments:
Circulating Service Hot Water Systems:
• Circulating service hot water pipes are insulated to R -2.
O Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the
system is not in use.
Heating and Cooling Piping Insulation:
• HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R - 3.
Swimming Pools:
u Heated swimming pools have an on /off heater switch.
• Pool heaters operating on natural gas or LPG have an electronic pilot light.
D Timer switches on pool heaters and pumps are present.
Exceptions:
Where public health standards require continuous pump operation.
Where pumps operate within solar- and /or waste- heat - recovery systems.
D Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a
minimum insulation value of R -12.
Exceptions:
Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source.
Lighting Requirements:
Li A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following:
(a) Compact fluorescent
(b) T -8 or smaller diameter linear fluorescent
(c) 40 lumens per watt for lamp wattage <= 15
(d) 50 lumens per watt for lamp wattage > 15 and <= 40
(e) 60 lumens per watt for lamp wattage > 40
Other Requirements:
❑ Snow- and ice- melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting
off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is
above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement 'e).
Certificate:
A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values; window
U- factors; type and efficiency of space- conditioning and water heating equipment. The certificate does not cover or obstruct the visibility
of the circuit directory label, service disconnect label or other required labels.
NOTES TO FIELD: (Building Department Use Only)
Project Title: Holden Addition Report date: 03/20/12
Data filename: Untitled.rck Page 4 of 4
LI Wood - burning fireplaces have gasketed doors and outdoor combustion air.
LI Automatic or gravity dampers are installed on all outdoor air intakes and exhausts.
Air Sealing and Insulation:
u Building envelope air tightness and insulation installation complies by either 1) a post rough -in blower door test result of less than 7
ACH at 50 pascals OR 2) the following items have been satisfied:
(a) Air barriers and thermal barrier: Installed on outside of air - permeable insulation and breaks or joints in the air barrier are filled or
repaired.
(b) Ceiling /attic: Air barrier in any dropped ceiling /soffit is substantially aligned with insulation and any gaps are sealed.
(c) Above -grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier.
(d) Floors: Air barrier is installed at any exposed edge of insulation.
(e) Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or
sprayed /blown insulation extends behind piping and wiring.
(f) Corners, headers, narrow framing cavities, and rim joists are insulated.
(9) Shower/tub on exterior wall: Insulation exists between showers /tubs and exterior wall.
Sunrooms:
• Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U- factor of 0.50 and the maximum
skylight U- factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope
requirements.
Materials Identification and Installation:
Li Materials and equipment are installed in accordance with the manufacturer's installation instructions.
(] Materials and equipment are identified so that compliance can be determined.
u Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided.
❑ Insulation R- values and glazing U- factors are clearly marked on the building plans or specifications.
Duct Insulation:
LI Supply ducts in attics are insulated to a minimum of R -8. All other ducts in unconditioned spaces or outside the building envelope are
insulated to at least R -6.
Duct Construction and Testing:
Li Building framing cavities are not used as supply ducts.
u All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means
of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or
UL 181B and are labeled according to the duct construction. Metal duct connections with equipment and /or fittings are mechanically
fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three
equally spaced sheet -metal screws.
Exceptions:
Joint and seams covered with spray polyurethane foam.
Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the
joint so as to prevent a hinge effect.
Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa).
u Duct tightness test has been performed and meets one of the following test criteria:
(1) Postconstruction leakage to outdoors test: Less than or equal to 8 cfm per 100 ft2 of conditioned floor area.
(2) Postconstruction total leakage test (including air handler enclosure): Less than or equal to 12 cfm per 100 ft2.
( Rough -in total leakage test with air handler installed: Less than or equal to 6 cfm per 100 ft2 of conditioned floor area.
(4) Rough -in total leakage test without air handler installed: Less than or equal to 4 cfm per 100 ft2 of conditioned floor area.
Temperature Controls:
u Where the primary heating system is a forced air - furnace, at least one programmable thermostat is installed to control the primary
heating system and has set - points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle.
❑ Heat pumps having supplementary electric- resistance heat have controls that prevent supplemental heat operation when the
compressor can meet the heating load.
Heating and Cooling Equipment Sizing:
• Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code.
Li For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial
Building Mechanical and /or Service Water Heating (Sections 503 and 504).
Project Title: Holden Addition Report date: 03/20/12
Data filename: Untitled.rck Page 3 of 4
0 REScheck Software Version 4.4.3
Inspection Checklist
Energy Code: 2009 IECC
Location: Northampton, Massachusetts
Construction Type: Single Family
Project Type: Addition /Alteration
Heating Degree Days: 6404
Climate Zone: 5
Ceilings:
❑ Ceiling 1: Flat Ceiling or Scissor Truss, R -38.0 cavity insulation
Comments:
Above - Grade Walls:
❑ Wall 1: Wood Frame, 16" o.c., R -19.0 cavity insulation
Comments:
Windows:
❑ Window 1: Vinyl Frame:Double Pane with Low -E, U- factor: 0.270
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
Doors:
❑ Door 1: Glass, U- factor: 0.190
Comments:
❑ Door 2: Glass, U- factor: 0.190
Comments:
❑ Door 3: Glass, U- factor: 0.190
Comments:
Floors:
❑ Floor 1: All -Wood Joist/Truss:Over Unconditioned Space, R -30.0 cavity insulation
Comments:
Floor insulation is installed in permanent contact with the underside of the subfloor decking.
Crawl Space Walls:
❑ Crawl 1: Solid Concrete or Masonry
Exemption: Framing cavity filled with insulation.
Comments:
Air Leakage:
❑ Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are
sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or
solid material.
❑ Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs /showers, and in openings between
window/door jambs and framing.
❑ Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk
between the housing and the interior wall or ceiling covering.
❑ Access doors separating conditioned from unconditioned space are weather- stripped and insulated (without insulation compression or
damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed
to maintain insulation application.
Project Title: Holden Addition Report date: 03/20/12
Data filename: Untitled.rck Page 2 of 4
C1 REScheck Software Version 4i.4.3
Comp Cert
Project Title: Holden Addition / --
Energy Code: 2009 IECC
Location: Northampton, Massachusetts
Construction Type: Single Family
Project Type: Addition /Alteration
Heating Degree Days: 6404
Climate Zone: 5
Construction Site: Owner /Agent: Designer /Contractor:
22 Easty Strreet John Joyce S and D Architects
Northampton, MA 01060 FTF
78 Timber Drive
East Longmeadow, MA 01028
4135190716
Compliance: Passes
Compliance: 14.4% Better Than Code Maximum UA: 90 Your UA: 77
The % Better or Worse Than Code index reflects how close to compliance the house is based on code trade -off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
Gross Cavity Cont. Glazing UA
Assembly Area or R -Value R -Value or Door
Perimeter U- Factor
Crawl 1: Solid Concrete or Masonry - -- - -- - -- -- --
Exemption: Framing cavity filled with insulation.
Floor 1: All -Wood Joist/Truss:Over Unconditioned Space 28830 0.0 10 ye.0
Wall 1: Wood Frame, 16" o.c. 640 0.0 31
Window 1: Vinyl Frame:Double Pane with Low -E 65 0.270 18
Door 1: Glass 17 •.190 3
Door 2: Glass 17 0.190 3
Door 3: Glass 17 0.190 , 3
Ceiling 1: Flat Ceiling or Scissor Truss 288 38.0 0.0 9
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name - Title Signature Date
Project Title: Holden Addition Report date: 03/20/12
Data filename: Untitled.rck Page 1 of 4
The Commonwealth of Massachusetts Print Form
. Department of Industrial Accidents
it- Office of Investigations
==i-, i- 1 Congress Street, Suite 100
; Boston, MA 02114 -2017
www.mass.gov /dia
Workers' Compensation Insurance Affidavit: Builders / Contractors /Electricians/Plumbers
Applicant Information Please Print Legibly
Name ( Business /Organization/Individual): '�,/ C (,✓1 -e '` cD �, L, ( 5
Address: 'S 10 P ∎A e y S ,
City /State /Zip: S v -c {' \ (, 1 Phone #: g6 D ^ 3 04 4 -1 - 9 1 01 ci�0
Are you an employer? Check the appropriate box: Type of project (required):
1. ❑ 1 am a employer with 4. ❑ I am a general contractor and I
employees (full and/or part- time).* have hired the sub - contractors 6. ❑New construction
2. X I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling
ship and have no employees These sub - contractors have 8. ❑ Demolition
working for me in capacity. employees and have workers'
g any P tY 9. El Building addition
[No workers' comp. insurance comp. insurance.:
required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions
3. ❑ I am a homeowner doing all work officers have exercised their 11.11 Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs
insurance required.] t c. 152, § 1(4), and we have no
employees. [No workers' 13.0 Other
comp. insurance required.]
*Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information.
f Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
:Contractors that check this box must attached an additional sheet showing the name of the sub - contractors and state whether or not those entities have
employees. if the sub - contractors have employees, they must provide their workers' comp. policy number.
I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:
Policy # or Self -ins. Lic. #: Expiration Date:
Job Site Address: City /State /Zip:
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and /or one -year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certii, under , e pains 1, d penalties ofpgjury that the information provided above is true and correct
Signature: °' Date: - ..__=___I 1 o� I
Phone #: R(D C5 - 3" (-) - ,
Official use only. Do not write in this area, to be completed by city or town officiaL
City or Town: Permit/License #
Issuing Authority (circle one):
1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person: Phone #:
SECTION 8 - CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
� S
Name of License Holder : � 0 C
C � �
�! l,i License Number
LIL'A e r' � f r 1 0 k 5v-4 e C+ cl o cJ ifri ( — l ,)-
Addre u( OA Expiration Date
L i/3 — S/9 -6- )/ 6
Signature Telephone
9. Registered Home Improvement Contractor: Not Applicable ❑
1 L-1 —)0(-7 I G� - I � (7), �S
Company Name Registration Number
S e 16w 5 it-Pd eloco ) -
Address I ,� Expiration Date
Ai / Telephone - 0 7 1 4 4 (13 - 379 4
SECTION 10- WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes [13 di No ❑
11. - Home Owner Exemption
The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families
and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts
as supervisor. CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner: Person (s) who own a parcel of land on which he /she resides or intends to reside, on which there
is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm
structures. A person who constructs more than one home in a two - year period shall not be considered a homeowner.
Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he /she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of
Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable)
New House ❑ Addition Er Replacement Windows Alteration(s) ❑ Roofing 0
Or Doors D
Accessory Bldg. ❑ Demoliti n ❑ New Signs [O] Decks [D Siding [O] Other [0]
���v /d„i
Brief Description of Proposed
Work: M Sunvtvur- 4- L -vu n )ny I K ? ' 1 0 0400~
Alteration of existing bedroom Yes < No Adding new bedroom Yes No
Attached Narra Renovating unfinished basement Yes _No
Plans Attache - Sheet
6a. If New house and or addition to existing housing, complete the following:
a. Use of building : One Family X Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached? rip r (�
d. Proposed Square footage of new construction. d Dimensions L SI.ope d SCc 1 to
e. Number of stories? a r
i- 1 111-\-:',C. (N61- Y ∎ S+t Ay
f. Method of heating? ea . c G or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
r
h. Type of construction k V•••• (.
i. Is construction within 100 ft. of wetlands? Yes ("-- No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade Cve ) ( S ore A 3 G "
k. Will building conform to the Building and Zoning regulations? V Yes No .
I. Septic Tank City Sewer t/— Private well City water Supply ( V
SECTION 7a - OWNER AUTHORIZATION - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I, (-) et c J 14,) ( ci e r) , as Owner of the subject
property
hereby authorize J 0t k 3 `1 C C r c , d v� e 1 r` 0 S LI
to act o ehalf, in all matters relative to work authorized by th building permit applicatio
n. l
t(.....i
Signature of Owner Date
I, -.S 0 l., , c5 C (4'- , as Owner /Authorized
Agent hereby declare that the statements arid information on the foregoing application are true and accurate, to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
J6tA 36 /Ce
Print Name
Signature of Owner fin Date
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
L c'. \ Se ` L\l� A "® Building Department
Lot Size
Frontage
Setbacks Front
Side L: R: l L: lO R: C5�
Rear
Building Height
Bldg. Square Footage D ?() % •
Open Space Footage
(Lot area minus bldg & paved
parking)
# of Parking Spaces
Fill:
(volume & Location)
A. Has a Special Permit /Variance /Finding ever been issued for /on the site?
NO ® DON'T KNOW 0 YES 0
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO ® DONT KNOW ® YES Q
IF YES: enter Book Page and /or Document #
B. Does the site contain a brook, body of water or wetlands? NO ►11 DON'T KNOW ® YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained ® Obtained ® , Date Issued:
C. Do any signs exist on the property? YES 0 NO
YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property ? YES 0 NO e
IF YES, describe size, type and location:
E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES ® NO Co
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
, Aj Department use only
?" 1 City of Northampton Status of Permit:
os OSA Building Department Curb Cut/Driveway Permit
lam'`` 212 Main Street Sewer /Septic Availability
Room 100 Water/Well Availability
o f 0°. Northampton, MA 01060 Two Sets of Structural Plans
�t t+ phone 413 - 587 -1240 Fax 413 - 587 -1272 Plot/Site Plans
Other Specify
APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 - SITE INFORMATION
1.1 Property Address: This section to be completed by office
1 C: 4S dTKT Map Lot Unit
port ri-11414/PTLY - X Pk t.4 • Zone Overlay District
Elm St. District CB District
SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT
2.1 Owner of Record:
�AUi /4°1_1- L'--f ?1 a� si sr flwcrin eolv / .� tt4. 0106 a
Name (Print) Current Mailing Address:
) I / 4 r 3 • .717. 3 3 7 3
#4let'Ir'—rj Telephone
Signature
2.2 Authorized Agent:
"5 0\ ti ` Sa(-1 c e -) 6 7: 5e,/ E- ► (m e(,,40c) iM/r
Name (Print)
4 Current Mailing Address: O/ WE
L-I13_S1c7-0716
Signature - Telephone
SECTION 3 - ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost (Dollars) to be Official Use Only
completed by permit applicant
1. Building (a) Building Permit Fee
71-,5 ► c i . v u
2. Electrical (b) Estimated Total Cost of
532e. v) Construction from (6)
3. Plumbing Building Permit Fee , ®�
S2Get . tJ U A
4. Mechanical (HVAC)
•
5. Fire Protection
6. Total = +2 +3 +4 +5) k.-?,///. uo Check Number A /1/ /'‘e/
This Section For Official Use Only
Date
Building Permit Number: Issued:
Signature:
Building Commissioner /Inspector of Buildings Date
b j oft _—
File # BP- 2012 -0848
APPLICANT /CONTACT PERSON JOHN B JOYCE L 4 i j v if
ADDRESS/PHONE 78 TIMBER DR EAST LONGMEADOW (413) 519 -0716
PROPERTY LOCATION 22 EAST ST
MAP 38B PARCEL 131 001 ZONE URB(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out
Fee Paid 6710 / /f e 12 11 •6'D
Typeof Construction: CONSTRUCT SUNROOM /LAUNDRY ROOM, PORCH & 2ND FLR DEN
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License 77942
Agit sets of Plans / Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFOJ.2MATION PRESENTED:
Approved Additional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND /OR Special Permit With Site Plan
Major Project: Site Plan AND /OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received & Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
m iti Delay
O
Signature of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning & Development for more information.
22 EAST ST BP- 2012 -0848
GIS #: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 38B - 131 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: ADDITION BUILDING PERMIT
Permit # BP- 2012 -0848
Project # JS-2012-001492
Est. Cost: $83111.00
Fee: $174.60 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: JOHN B JOYCE 77942
Lot Size(sq. ft.): 5009.40 Owner: FEMIANO SAMUEL & P COONERTY C/O DAVID R HOLDEN
Zoning: URB(100)/ Applicant: JOHN B JOYCE
AT: 22 EAST ST
Applicant Address: Phone: Insurance:
78 TIMBER DR (413) 519 - 0716
EAST LONGMEADOWMA01028 ISSUED ON:4/12/2012 0:00:00
TO PERFORM THE FOLLOWING WORK: CONSTRUCT SUNROOM /LAUNDRY ROOM,
PORCH & 2ND FLR DEN
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House # Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace /Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 4/12/2012 0:00:00 $174.60
212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272
Louis Hasbrouck — Building Commissioner