Loading...
44-052 (4) �. FL Ce,�(�e (2I 30e O" ,ilak , `� POWERHOUSE ili oikeiZ II L aa' j __ Amherst, MA 01002 Phone: 413- 835 -5162 Email: matt.turcotte @gmail.com Site Information Date Of Test: 3/26/2012 Contractor: Aaron Morin Sheet Metal Site Address: 1140 Florence Rd Florence, MA 01062 Test Performed By: Matt Turcotte Job #: 12 -005 -d Duct Pressurization Test Results Type of Test Performed: Mid - Construction, total leakage with air handler (6 %) Duct System 1 Conditioned Floor Area: 2230 sq ft Duct Flow at 25 Pa: 60 CFM Duct Leakage: 2.69 CFM per 100 sq ft of conditioned floor area TEST RESULT : PASS Duct System 2 (if applicable) Conditioned Floor Area: N/A sq ft Duct Flow at 25 Pa: N/A CFM Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area TEST RESULT: N/A Notes on Area Tested and /or Testing Conditions: System serves one unit of a multi - family property. 2009 IECC Minimum Requirements, per Section 403.2.2 Mid - Construction Test, total leakage without air handler < 4 CFM per 100 sq ft of conditioned floor area Mid - Construction Test, total leakage with air handler < 6 CFM per 100 sq ft of conditioned floor area Post - Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area Post - Construction Test, total leakage < 12 CFM per 100 sq ft of conditioned floor area