Date Of Test: 3/26/2012
Contractor: Aaron Morin Sheet Metal
Site Address: 1140 Florence Rd
Florence, MA 01062
Test Performed By: Matt Turcotte
Job #: 12 -005 -d
Duct Pressurization Test Results
Type of Test Performed: Mid - Construction, total leakage with air handler (6 %)
Duct System 1
Conditioned Floor Area: 2230 sq ft
Duct Flow at 25 Pa: 60 CFM
Duct Leakage: 2.69 CFM per 100 sq ft of conditioned floor area
TEST RESULT : PASS
Duct System 2 (if applicable)
Conditioned Floor Area: N/A sq ft
Duct Flow at 25 Pa: N/A CFM
Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area
TEST RESULT: N/A
Notes on Area Tested and /or Testing Conditions:
System serves one unit of a multi - family property.
2009 IECC Minimum Requirements, per Section 403.2.2
Mid - Construction Test, total leakage without air handler < 4 CFM per 100 sq ft of conditioned floor area
Mid - Construction Test, total leakage with air handler < 6 CFM per 100 sq ft of conditioned floor area
Post - Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area
Post - Construction Test, total leakage < 12 CFM per 100 sq ft of conditioned floor area