Loading...
38B-126 (2) i� L -- v, - +, -- 2, - P yam 7 Q�, 2 7v b r 7, f 7 , ` p 7' '"1 yam, m'6/ 7- G' 5 r . t d ' 2 / - tk7 7 7 J " 1 �� ! " y - "F - Y '� 1 a r 7 /7 v ? / G ' `/ J "J --- ,-, 4 V 7/ NNW r'r Nook F {_____ _______ - ito-_, S , 1 - fit r C.,P 7 t --1 aj_v C i , -. ) ' ! p 9 • 1,3 vim 4 X 4 1 ,,,, , 5 n 2 -...,1 cx .)-).,. z likOW °r - rU• Sett ! C r \\. l 4 i i r 1 / m r c l i i S c,, ,, — 0 / - A A t , I , 't-1 f A j/N -79-v1,1 1 s L_________J iiii. ..1r" "Ii-..• trod t - lir -7 ! 03A1303.1 ' - Er o 1 I. . ' . ______ '*04 1 .. z-. I , : 1 77: ,... / // 'e A .4,. (4) i 0 71 4 6 7. ..f ' ,. T3 I 1, et f /7 ,-'' J •-•.--- 4 1 . 1 . .,. , . 1 ■ I l r „ , 4.., _ 6 . • HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defmes "Homeowner" as, " Person(s) - who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a home owner." The building department for the City &Northampton wants person(s) who seek to use the home owner exemption, act as their owirconstmttion supervisor; to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires thatthe building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough buildinginspection (before work is, concealed), insulation inspection (if reauired) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspeeted. If the homeowner hires other trades to perform work (electical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper ermits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made • 1, • understand the above. .(Home owner /resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to Date • Address of work location • The Commonwealth of lfassachusetts Department of Industrial Accidents. gl Office of Investigations � Y 600 Washington Street =-411:!=-- • Boston, MA 02111 �t xww.massgov /dia -Workers'. Compensation Insurance Affidavit Builders/Contractors/Electricians/Plumbers Applicant Information r Please Print Legibly Name ( Business /Organiiation/Individual): SCc, ( c (c c • • • Address: / 9 3 /V L n 11 City /State/Zip: vc 1 f Phone. #: 7 c 6 ` 3 3 ` Are you an employer? Check the appropriate box:... Type ofprolect (required): / 4.. ani a general contractor and I 1. [] I am a employer with. ❑ I g 6 New = = — * have hired -the sub- eontraetors— — - constructi on yees (full and/or part -fime). 2._ I aai a sole proprietor or partner- listed on the attached sheet. 7. 0 Remodeling , • sfi and have no employees These sub- contractors -have. . 8. ❑ Demolition working for me in any capacity. ca employees and have workers' $ . 9. 0 Building addition [No workers'- conip. insurance • comp. insurance. 10. Electrical airs or additions re aired 5. ❑ We are a emperation and its ❑ 1eP 4 ] 3. ❑ I am a homeowner doing all work officers havelxercised their . 11.0 Plumbing repairs or additions myself [No workers' comp. right of exemption per MGL 12.0. Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.0 Other comp. insurance requited]. *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy inform ion. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. =Contractors that check this box must attached an additional sheet showing .lens= of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees Below is the policy and job site information. Insurance Company Name: _ Policy # or Self-ins. Lic. # Expiration Date: Job Site Address: City /State/Zip:* • • Attach a copy of the workers'•compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or oae -year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for . e coverage verification. I do: hereby certify under , aim .and penalties ofperjury that the information provided above is true and correct 5_ignaiure: _ .D / ate: t Phone #: Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License # Issuing Authority (circle one): .1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical,Inspector 5. Plumbing Inspector 6. Other 9, • Contact Person: Phone #: SECTION 8 - CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder : S C c tf &f t c /CC S 3 i, 6 License Numb r , � uC .. 1/ �I LC uC,- f »i / /Q/ t- Address / t c Jv y Expiratio Date ture Telephone Not Applicable ❑ S./4 /- 3 - 3 Company Name Registration Number / VA0/ /( Address Expirati Date Telephone SECTION 10- WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M G L. c 154 § 25C(8)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the buildin it. Signed Affidavit Attached Yes No 0 �� . • The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts as supervisor. CMR 780, Sixth Edition Section 108.3.5.1. • Definition of Homeowner: Person (s) who own a parcel of land on which he/she resides or intends to reside, on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm structures. A person who constructs more than one home in a two -year period shall not be considered a homeowner. Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he /she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. • The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature • SECTION 5- DESCRIPTION OF PROPOSED WORK (Check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors ❑ Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [[ Siding (0] Other [ID) Brief Des Option tion of Proposed Work: B Work: 7v. , 4.4 t� on 1" r - L� c r--� C t �vt c �- e1C se 1 1.. (� k. 1 Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll - Sheet �� . � ". .. � • ... m a m_.s sI @� � >� ar n o . $� e 8 , e - ����� .�... �: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. WilL<building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT •' I, � Cg C- C C 1 S_ ( LL.. , as Owner of the bject property'' hereby authorize .1 (1s I'1 N LtLt o-s'> �J to act on m •` half, ' all matters relativ o work authorized by this building permit application. v - 4 - /i /1 i Signature of s ner Date I, 11 4 G_ , as OwniAuthorized ..,} Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of My kr'bwiedge and belief. Signed under the pains and penalties of perjury. Print Name Si • ' Owner /Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zo ,. This column o be filled in by s Building Department i ' Lot Size 1 . a Z -_ i _�J 1�Y��Yrt y 1 Frontage 1 I Setbacks Front = 1 1 Side L:f 1 R:1 L:LJ R:1 1 FT L Rear I 1 1 1 I 1 Building Height 1 1 1 Bldg. Square Footage = 1 '% 1 1 1 1 1 1 _Open Space Footage _- . %- - - — (Lot area minus bldg & paved 1 1 l 1 =1 1 1 parking) # of Parking Spaces Ali Fill: (volume & Location) t g A. Has a Spec' ermit /Variance /Finding ever been issued for /on the site? NO DONT KNOW 0 YES Q IF YES, date issued:I IF YES: Was the rmit recorded at the Registry of Deeds? NO DONT KNOW Q YES 0 IF YES: enter Book I Page and /or Document #1 j B. Does the site contain a brook, body of water or wetlands? NO QDONT KNOW Q YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained Q , Date Issued: C. Do any signs exist on the property? YES Q NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO IF YES, describe size, type and location: 4 E. Will the construction activity disturb (clearing, grading, excav • n, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. City of Northampton RE : uilding Department CE�V�D 12 Main Street r� Room 100 4 ' o ampton, MA 01060 p one 13- ,87-1240 Fax 413- 587 -1272 APPLICA • L UCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION .: This sectionto be completed byoffice 1.1 Property Address: :3 � `1 - � � .. /� ., ; Map � R " t:ot � z 44.a. Unit: I CBDistriot SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT. 2.11 Owner of Record: / / / /� 7� / J C' � / - G C'c„ !w` 3� 1 1. U /v 444_ 7 �, J / r t.. '{ Ne4 / n 4 sl- A 4+ Na (Pri 1 Current fling Address: r Telephone Si ature 2.2 Authorized Agent ' S r; v � c /Cc (- o i'^ Le <.c . -e. /2,1 lcuc`r M Name (Print) Current Mailing Address: , c / , '1 3— 6 -'3 y r Sign- . =` Telephone • SECTION 3 - ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollars) to be Official Use Only completed by permit applicant 1. Building ( Buihiin Perirtit Fee n0 it 2. Electrical (b) Estimat Total Cost of Construction from (6) 3. Plumbing Building Permit Fee • 4. Mechanical (HVAC) 5. Fire Protection 6. Total = (1 + 2 + 3 + 4 + 5) 6 Oct c > Check Number ,/ V (} .. This Section For Official .Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings - • Date File # BP- 2012 -0006 APPLICANT /CONTACT PERSON SCOTT NICKERSON 1 7/61 tR ADDRESS/PHONE 197 NORTH LEVERETT RD LEVERETT (413) 896 -3347 () PROPERTY LOCATION 34 COLUMBUS AVE r` 0 MAP 38B PARCEL 126 001 ZONE URB(100)/ c -T FLAtJ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid �' / 7 Tvpeof Construction: CONSTRUCT 6 X12 DECK New Construction Non Structural interior renovations Addition to Existing_ Accessory Structure Building Plans Included: Owner/ Statement or License 053156 3 sets of Plans / Plot Plan THE FO LOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF ATION PRESENTED: Approved Additional permits required (see below) PLANNING BOARD PERMIT REQUIRED UNDER: § Intermediate Project: Site Plan AND /OR Special Permit With Site Plan Major Project: Site Plan AND /OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received & Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Peimut DPW Storm Water Management Demolition Delay 7 /!r / Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning & Development for more information. 34 COLUMBUS AVE BP- 2012 -0006 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 38B - 126 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: Deck BUILDING PERMIT Permit # BP- 2012 -0006 Project # JS- 2012- 000012 Est. Cost: $6000.00 Fee: $50.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: SCOTT NICKERSON 053156 Lot Size(sq. ft.): 9539.64 Owner: SPECTOR LEE A & REBECCA S NEIMARK Zoning: URB(100)/ Applicant: SCOTT NICKERSON AT: 34 COLUMBUS AVE Applicant Address: Phone: Insurance: 197 NORTH LEVERETT RD (413) 896 -3347 () LEVERETTMA01054 ISSUED ON: 7/11/2011 0:00:00 TO PERFORM THE FOLLOWING WORK: CONSTRUCT 6 X12 DECK POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 7/11/2011 0:00:00 $50.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Commissioner