11A-003 Beaver Brook Traffic Studyi
Tr .qffir A.Q cmPn4 ;
E E 0 V E
L FEB 2 6 2008
CITY CLERKS OFFICE
NORTHAMPTON, MA 01060
Northampton,
Massachusetts
Prepared for Mr. Patrick J. Melnik
110 King Street
Northampton, MA 01060
Prepared by -Ya—s---ffau a m stin _L u r - -
Transportation, Land Development, Environmental'Services
One Federal Street, Building 103 -3N
Springfield, Massachusetts 01105
413.747.7113
( 1 ( 1
Transportation
Land Development
nvironmental__
S e r v i c e s
One Federal Si
TTa.�acs_ P T��res� Rr �c y , Inc
Building 102
Springfield, MA 01
413747-7
Memorandum To: Mr. Patrick J. Melnik Date: January 9, 2007 FAX 413 747 -0!
110 King Street
Northampton, MA 01060
Project No.: 10006.00
From: Matthew J. Chase, P.E.
Juliet Locke, E.I.T.
Re: Beaver Brook Estates
Northampton, MA
Vanasse Hangen Brustlin, Inc. (VHB) has been retained by Patrick Melnik (the proponent) to prepare
a traffic impact study report outlining the potential traffic issues associated with a proposed
residential development in Northampton, Massachusetts.
In summary, it is the finding of this assessment that the proposed use on the site is expected to
generate a minimal amount of traffic (approximately 25 to 30 peak hour trips) and would have an
insignificant effect on area traffic operations. The following documents these findings.
PROJECT DESCRIPTION
The property, approximate location shown on Figure 1, is a 54 ± acre parcel located on Evergreen
Road in Northampton, Massachusetts, and is currently occupied by a 4 -unit residential apartment
complex. The proposed development program consists of constructing a 21 -unit single family and a
4 -unit apartment residential subdivision. The existing 4 -unit apartment complex previously mentioned
will remain on site, and therefore a total of 29 units (21 single family homes proposed, 4 apartment
units proposed and 4 apartment units existing) will occupy the site during full build -out. Access to the
site will be provided via a new site driveway, consolidating the two existing driveways located on
Evergreen Road. This proposed driveway is will be located directly across from Chestnut Street
creating a four -way unsignalized location.
EXISTING CONDITIONS
Field observations and the expected transportation characteristics of the project helped identify the
roadway and intersections that could be affected by the proposed development. In addition, VHB
discussed the study area with the Northampton Planning Department to confirm areas of concern.
Study Area Roadways
Evergreen Road is a residential roadway in a small neighborhood bordered by Florence Street and
Route 9 (Haydenville Road). Directly across from the site driveway is Chestnut Street, forming a
four - legged intersection. Adjacent to the project site, Evergreen Road and Chestnut Street are two -
lane roadways with no pavement markings. The pavement width directly in front of the site is
approximately 20 -feet. Existing land use within the immediate vicinity of this site is residential.
In addition to reviewing Evergreen Road adjacent the site, the following three intersections are the
only access points to the surrounding neighborhood. These intersections were studied in addition to
the site driveway to determine existing traffic conditions and potential traffic impacts.
Was p ri nglprojects 110 006 .001docslmemoslBeaver Brook Memorandum 1 09 07.doc
k\Masprinq\pro*ects\10006.00\qraphics\FIGURE'S map.dwq
03,
M
K
rj
S i
N' ,
2 �' 3j C � { �ri own
y �rr ^���'^�c � .1 �•, � .� � � ,'.. r � 1 � uy��.� : ..k . :.' tt
.;,i -'^. I lrJ f 7 F,�, . S# ,., ,t ,w;� � J � *,;^�� yp � ; �` ` � � �� ' r � y J„ f
0
X
S j
r j,
All,
0 ,
J—;
e �.} "7.. R�� t ) �� )} 1 M 9 ..t �� I'f -f"`�5 'ap I }' � ._ ' �, � l ��- � � � ��'4
%
j i : -
A
A "WIT
7tll
. 7
Aft!
+
OF
4
Y IN
0"
'gr
- 7 -
rV I
� r'•ih'�"",�'""" �. � 'i\ ! trt � -1p, dl ' t t � $ � ; � '. 'y �i j �r. f �^`� 1 *)
W
04
la
% P a,
4
INX'� �N 1 1— 1
L
I VIt h
I
I
111 N1 k
� I.f I "j� ,t; .mow -`�' ti c� ( n'3 ',. "y op/ - dl k,
�ti � 'S. �, t� 1 � � L �r +, � 2 P � `� I r'"= "..r "`<.'.^' ` f a � f � 'r � �"'` '� 9f �C„ 1
k A
qa �t"'. � } ��"i ri � � f��j F � .� � l� ., t ._.. ''� - r ,4 � �h , _��" ti" �. �,, .. ,t ,� � iA i�
k
n
ar
ou n try C
h
7j
LOO
M E M 0- R AL
A: t
ON
PARK
N,
0i
�q
4
Aq
0.
C PU
.4,
3
F
Xv
Beaver Brook Estates Figure I
Northampton, MA Site Location Map
0 1000 2000 Feet
Janua ?007
10006 ;
-2-
Study Area Intersections
Florence Street at Front Street
Front Street intersects Florence Street at a 4 5- degree angle forming a skewe
unsignalized intersection. Front Street a d, three legged
an 8- percent downgrade. There is no stop p sign or s o line at Front Street approach. hick appears
Str is a two -lane roadway with one general - purpose lane in each direction. The ostte to l
on Florence Street is 25 mph in the vicinity of the intersection. Sidewalks are Present at Florence
speed i
intersection with a cross -walk from Front Street to the westerly side of Florence Street. There
bus stop shelter located at the intersection on Front Street and is serviced by PVTA on the
trip to Northampton on a regular basis while the outbound trip is serviced as requested. A detailed
is a
bus schedule is attached to this memorandum. inbound
Route 9 at East Center Street
East Center Street intersects Route 9 forming a three -le gged unsignalized intersection. There is no
stop sign or stop line present along East Center Street. The pavement width at the intersection '
approximately 18 -feet on East Center Street and 24 -feet on Route 9 with three -foot shoulde
surrounding area on Route 9 is primarily rs. Th wooded, while the existing land use Center's
along East
Street is residential. The posted speed
limit e
mit on Route 9 is 30 mph.
IlMaspringlproje cts110006.00ldocslmemoslBeaver Brook Memorandum 1_09 07.doc
Ja 1, 2007
100[
-3
Route 9 at
_Leonard Street
Leonard Street intersects Route 9 at an a pproximately 45 - degree an forming a skewed, three -
legged intersection. Leonard Street is under stop control with a pavement width of approximately 23_
feet. Existing land use in the vicinity of the intersection is primarily resirianf;�i
°
Traffic Volumes et v a[ Leonard Stre
Peak hour turning movement counts ( T
week Mcs) were conducted on December
or evening eak during the
weekday mornin g peak hour (7:00 -g :00 AM) and during the weekday at the above mentioned study area intersections. Figures 2 and 3 illustrate the
existing weekday morning and evening g peak hour
weekday morning and evening occurred from o u r to Si v lu p and 4.15 to c The peak hour for the
Seasonal Variation 5.15 PM.
To evaluate the potential for seasonal variation in the existing
historical seasonal adjustment factors were reviewed using the Mass Highway permanent count
station 11 located on Routes 5 and 10 south of the Hatfield Town Line ne (in Northampton). This data
hour traffic count data,
indicates that the existing December traffic two traffic volumes b volumes are typical) Highwa monthly
adjust the existing volumes toe y high
reflect the average traffic co higher than the average
percent. Therefore, to be conservative it was not necessary to
Vehicle Crash Summary condition for this area.
Vehicle crash data was obtained from the
the most recent three -year time Massachusetts Highway Department
and the three study area intersections to determine if any current safety period (2003 to 2005). This data was reviewed for the site driveway
be exacerbated b (MassHighway) for
recent three- y the proposed project - related traffic. No crashes were reported during
Year time the site
report at the
Y deficiencies exist that might
three intersections bordering the s to (Leonard Street -
Y: however four total crashes were t he
ed
Front Street = 1 crash). - 1 crash, East center Street =
A crash
2 crashes
summary table is attached to this memorandum. , and
MassHighway crash rates were calculated for each of the study area
effective tool to measure safety hazards. MassHighway develops standard crash rates for g
unsignalized intersections throughout the state and publishes average rates by and are an
are expressed in incidents per million vehicles entering g (MEV) the intersecti on. n. The calculated rate is
district. These rates
compared to the average rate for each of the study area intersections to determine All if crashes are
that there are no existing safety deficiencies at these locations. ersections for District 2 it i n t ersections do not exceed this rate and therefo re c appears
y area i
Il Mas grin glproj ec1s110006.001docslmemoslBeaver Brook Memorandum 1 Og_07.doc
o�
�1
i
2006 Existing
o umes
Northampton, Massachusetts
'' 1
NE
Cv
Weekday Morning Figure 2 ®0®
Peak Hour Traffic V 1
� 1
1
w
O
Not to Scale 1 �
a
10�
�
Janus g, 2007
100f
I 1
Intersection Sight Distance
- -- - - - -- - - - - - - ntersectiorr sight distance (ISD) is the view a driver has from the side stree t of approaching traffic.
The desirable values for intersection sight distance are such that the major
rave to substantially reduce its speed when the driver exits the side stree
traffic. street traffic would not
et and into the main flow o'
For the site driveway, existing intersection sight distances were measured
distances were determined using an estimated design speed limit of 30 nt
neighborhood. Intersection sight distance measurements (existing and re in the field and required
are summarized in Table 1. Ph for a residential
qurred) for each direction
Table 1
Sight Distance Summary
Intersection
Lookin Si ht Dista ®_e
+
Minimumb Desiredb
Measured
Site Driveway Left from Site Driveway 200'
at Evergreen Road 335'
> 700'
Right from Site Driveway 200'
which is more co
335' 250'
a Based on
Hi hwa guidelines established in A Polic on the Geo
b Required sight distance Transport n feet, based on speed of appro met Desi n t Hi hwa sand Streets, American Association of State
] 2004.
for vehicles turning left from the site driveway, oe consery e miles per hour for eastbound and westbound directions
ative than right turning vehicles.
Looking left from the site driveway the desired sight distance is met, as a
driveway can see to the intersection of Evergreen Road /Leonard Street (over
from the site driveway the desired sight distance does not meet the measured exiting the site
distance, and is due to a vertical crest in Evergreen Road; however, ( u interseion sight
700 feet). Looking right
ct
"If the available intersection sight distance for an entering �SHT0 ' recommends that:
appropriate stopping sight distance for the major road, then drivers have suffic e at least equal to the
anticipate and avoid collisions. sight distance to
Stopping sight distance (SSD) is the length of roadway ahead visible to a
drivers have sufficient visibility to anticipate and avoid collisions before re
in the roadway. Upon further review of the sight distance data in Table driver and ensures that
west (right) from the site driveway w a aching a stationary object looing
of 200 feet for the eastbound a g PPr °ximately 250 feet and exceeds the Min'
mum regDuiredkSSD
intersection are enhanced, accordin to h. Slnce ISD exceeds SSD traffic operations u this
distance in this direction meets the required d stance for 35 MPH (250 -fee
guidelines. Furthermore, the measured sight
t).
.....- -_ -
' A Policy on the Geometric Desi n of Hi liwa and Streets, American Association of State Highway and Transportation
Officials [AgSHTO], 2004
Waspring1projects110006 .001docslmemoslBeaver Brook Memorandum 1 09 07.doc
FUTURE CONDITIONS
The traffic analysis presented in this memorandum has been prepared in conformance with the
Executive Office of Environmental Affairs /Executive Office of Transportation EOE
Institute of Transportation Engineers ITE g uidelines ( A/EOTJ and the
In
with these guidelines, a future design year of 2011 (a fiive -y ar hori zon) izon) was reviewed accordance
assessment. as part of this
Background Traffic Growth
Traffic growth on area roadways is a function of the expected land development, economic activit y study
and changes in demographics. A frequently used procedure is to estimate traffic that could be
generated by planned new major developments,
alternative procedure is to estimate an overall ar a o ann t ual percentage t h increase a a and t
apply tha roadways. An
. For the rposes of this assessment an annual
increase to the study area traffic volumes purposes percentage growth rate was used. Based on information provided in recent traffic studies completed
in the area, a background growth rate of 1.5 percent per year was applied to the existing traffic
volumes and used in the future 2011 traffic analysis.
Figures 4 and 5 illustrate the morning and evening 2011 No -Build traffic volumes, respective)
Trip Generation y
As described earlier, the proposed residential development consists of constructing 21 new single
family homes and , 4 new apartment units on a 54 -acre parcel. Traffic expected to be generated by
this development was dete using data provided by the Institute of Transportation Engineers
Trip Generation Manual, 7 Edition. The Single - Family Detached Housing land use code (LUC ) 21
and Apartment LUC 220 were used to forecast traffic volumes generated by the proposed residential
development; Table 2 provides a summary of this data.
Table 2
Site- Generated Traffic Summa
Time Period Movement
Weekday Daily (vpd)1 Total Sin le Family a A artmentSb
246 Total
28 274
Weekday Morning Enter
Peak Hour (vph) 2 6 0
Exit 18 6
Tot 24 2 20
2 26
Weekday Evening Enter
Peak Hour (vph) 2 17 2 19
Exit
10
Total 1 11
1 Traffic volumes expressed in vehicles per day. 27 3 30
2 Traffic volumes expressed in vehicles per hour.
a Data based on ITE Trip Generation Rates for Single - Family Detached Housing (Land Use Code 210) with 21 units by
regression.
b Data based on ITE Trip Generation Rates for Apartments (Land Use Code 220) for 4 units by average.
c Sum of a and b
The proposed residential development is forecasted to generate approximately 27 vehicle trips
daily (246 for Single Family, 28 for Apartments). Approximately 26 (6 enter, 20 exit) vehicles tri s
during the weekday morning Ps
evenin 9 Peak hour and 30 (19 enter, 11 exit) vehicle trips during the weekday
g peak hour are expected to be generated by the residential development. The trip
S
ummarized above does not take into account residents using the adjacent Northampton bike path
or the PVTA transit stop at the end of Front Street, therefore, Providing generation
g _a conservative analysis.
11Masprin& roiects110006 .001docMmemoskeeaver Brook Memorandum 1_ 09 07.doc
�
�l
j
Not to Scale
2011 No -Build -�Enmm
Weekday Morning Figure 4
Peak Hour Traffic Volumes
Northampton, Massachusetts
V�
how
o�
S-
W
_0
j
Not to Scale
2011 No -Build -�Enmm
Weekday Morning Figure 4
Peak Hour Traffic Volumes
Northampton, Massachusetts
V�
how
o�
S-
W
1 No Sulld.dw
w
Not to Scale
January',, ,07
10006.00
-6
Trip Distribution
The trip distribution for the traffic generated by the proposed facility is expected to follow existing
travel patterns near the site. The anticipated trip distribution for the site - generated traffic is
summarized in Table 3.
Table 3
Vehicle Trip Distribution Summary
Roadway Via Direction Frorn/To
Percent of Total Site - Generated Traffic
Route 9 (Haydenville Rd) Leonard Street Weekday Morning Weekday Evening
Route 9 (Haydenville Rd) East Center Street North 10 % 5 %
Florence Street South 60 % 60 %
Front Street North 20 % e
Florence Street Front Street South 30 /e
Total 110 % 5 %
Based on TMC counts conducted in December 2006 10 100 %
The additional traffic associated with the proposed project was distributed along the study area
roadways using the trip distribution shown in Table 3. The site generated trips were then distributed
and assigned to the roadways and added to the 2011 future No -Build conditions to obtain the 2011
future Build conditions with the project. These morning and evening 2011 Build conditions traffic
volumes are illustrated in Figures 6 and 7, respectively. Site - generated traffic assigned to the study
area intersections is also illustrated in a figure attached to this memorandum in the Trip Generation
Attachment.
TRAFFIC OPERATIONS ANALYSIS
Level -of- Service Criteria
Level -of- service (LOS) is the term used to denote the different operating conditions that occur on a
given roadway segment under various traffic volume loads. It is a qualitative measure of the effect of
a number of factors including roadway geometry, speed, travel delay and freedom to maneuver.
Level -of- service provides an index to the operational qualities of a roadway segment or an
intersection. Level -of- service designations range from A to F, with LOS A representing the best
operating conditions and LOS F representing the worst operating conditions.
The level -of- service designation for unsignalized intersections assumes that traffic on the major
street approaches are not affected by traffic on the side streets. Thus, LOS designation is
critical movement, which is generally the left -turn out of the side street. for the
Level of Service Analysis
VHB conducted capacity analyses using the evaluation criteria recommended in the Hi hwa
Capacity Manual (HCM) to determine the traffic capacity impacts due to the proposed facility. These
analyses were conducted for the weekday morning and evening peak periods during the following
conditions for the study area intersections:
2006 Existing conditions;
2011 Future No -Build conditions (Existing conditions with a 1.5 % growth rate);
2011 Future Build conditions (2011 No -Build conditions, plus the additional traffic generated
by the proposed facility).
The capacity analysis output for the Existing, No- Build, and Build conditions are attached to this
memorandum, and are also summarized in Table 4.
2 Highway Capacity Manual Transportation Research Board; Washington D.C.; 2000.
1 lMasprl nglprojecls170006 .001docslmemoslBeaver Brook Memorandum 1 09 07.doc
�, r
•-�
�1
F°
7°•
N
P: \10006.00 \graphics \FIGURES\2011 Build.dwq — /
I
A
T_
*�T
OD
m
January 9, 2007
-7-
Table 4- - -- --
Unsignalized Capacity Analysis Summary
- 2011 Future No Build Co
Time Period Critical 2006 Existing Conditions (without project)
Location (Peak Hour) Movement Dem a VIC b Delay = LOS d Dem VIC Delay
1
with rolect
LOS I Dem VIC Delay LOS
Florence St Weekday AM SWLR
22
.02
9.1
A
23
.03
9.9
9.8
A
A
29
12
.04
9.8
9.8
A
A
at Front St Weekday PM SWLR
9
.01
9.7
A
9
.01
.02
Route 9 Weekday AM EBLR
37
.09
15.2
C
39
.11
16.2
11.8
C
B
52
21
.14
16.5
11.5
C
B
at East Center Weekday PM EBLR
12
.02
11.5
B
13
.02
.04
'
Route 9 Weekday AM NELR
21
.06
16.5
C
23
.08
17.8
15.2
! C
C
25
21
.08
18.3
15.6
C
C
at Leonard St Weekday PM NELR
17
.04
14.3
B
20
.05
I
.06
f
Evergreen Rd Weekday AM SBLR"
2
0
8.6
A
2
0
0
8.6
8.6
A
A
24
15
.03
9.1
9.0
A
A
at Site Drive Weekday PM SBLR"
2
0
8.6
A
f
2
I .02
_
^ During the 2006 Existing and 2011 No Build conditions the critical approach to this intersection is the northbound Chestnut Avenue approach which is directly across from the
proposed site driveway. During the 2011 Future Build condition the critical approach is the proposed site driveway.
in vehicles hour for the critical movement volume of the approach.
a Dem - Demand. Vehicular demand expressed per
b VIC - Volume -to- capacity ratio. V/C ratios range from 1.0 when demand equals capacity to 0 when demand is zero. Values over 1.0 indicate demand in excess of capacity.
initial deceleration delay, move -up time, stopped delay, and final acceleration delay.
c Delay - Control delay per vehicle, expressed in seconds, includes queue
d LOS - Level of Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions.
LR = Shared left right movement; SW = south /westbound; NE = north /eastbound; SB = southbound; EB = eastbound
During the 2006 Existing and 2011 Future conditions with and without the project, the study area
intersections operate between an acceptable level of service A and C. As Table 4 also indicates, the
levels of service remains unchanged from the 2011 Future No Build condition (without the project) to
the 2011 Future Build conditions (with the project).
The analysis indicates that the development will not result in any significant additional congestion
along area roadways in the future.
CONCLUSION
In summary, it is the finding of this evaluation that the traffic generated by the proposed residential
development (totaling 25 new units and 4 existing units) would not have a significant impact on traffic
operations on the surrounding area roadway network. The following summarizes the findings from
this memorandum:
• The proposed residential development will generate approximately 274 daily trips; I
• During the weekday morning peak hour approximately 26 vehicle trips (6 entering and 20
exiting) are expected, which is equivalent to less than one car every 2 minutes;
• During the weekday evening peak hour approximately 30 vehicle trips (19 entering and 11
exiting) are expected, or approximately one car every 2 minutes;
• Intersection sight distance at the site driveway is adequate;
• It is anticipated that residents could utilize the nearby Northampton bike path or PVTA transit
stop at the end of Front Street, which would reduce the number of single occupancy vehicles
traveling to /from this development; and
\ \Maspring\ projects N0006.001docslmemoslBeaver Brook Memorandum 1 0s- 07.doc
January 9, 2007 - -
10006.00
The Levels of Service at the three s tudy area intersections and the proposed site driveway
are expected to remain at an acceptable LOS "C or better with the - construction - of the - -
proposed residential development.
Lastly, the proponent has committed to connecting this subdivision with the proposed Northampton
bike path by way of a bike path connector shown on the site plan. In addition, the proponent has
committed to providing funding to assist in the construct of the bike path main corridor from the
connector Grove Avenue north toward the Williamsburg line. Details of this commitment are
summarized in a letter to the Northampton Planning Board dated July 27, 2006. The connection of
the bike path to the proposed subdivision will create opportunities for this project to generate less
traffic to the surrounding study area intersections.
11Masprt ngl projects110006 .001docslmemoslBeaver Brook Memorandum 1_09_07.doc
' 1
Attachments -
➢ Crash Summary
➢ Sight Distance
➢ Traffic Counts
➢ Trip Generation
➢ Intersection Capacity Analysis
➢ Public Transportation
- -- -- - - -P:\ 09983 :00\ddcslmemosV\ItacFmenl:doc' _ -- -- - -- -_ -� _ -� - -- - -- - _ -� - -- - -� --
P:1 09983. 001 docsl memos\Attachmenl.doc
Table 1
Accident-Summ
Vehicular Crash Summary (2003 - 2005)
®°®
Rt 9 (Haydenville Rd) at Rt 9 (Haydenville Rd) at
Florence St at
Leonard St
E Center St
Front St
Year
2003
0
1
0
2004
1
0
0
2005
0
1
1
Total
1
2
1
Average
0.3
0.7
0.3
Collision Type
Rear -end
0
1
0
Sideswipe
0
0
1
Single- vehicle crash
1
0
0
Unknown
0
1
0
Total
1
2
1
Severity
Properly- related
1
1
Total
1
2
1
Time of clay
Weekday, 7:00 AM - 9:00 AM
0
1
1
Weekday, 4:00 PM - 6:00 PM
0
1
0
Weekday, other time
1
0
0
Total
1
2
1
Pavement Conditions
Dry
0
2
0
Snow
0
0
1
Ice /Slush
1
0
0
Total
1
2
1
MassHighway Crash Rates:
0.08
0.08
0.27
District 2 Crash Rate: 0.85
Significant'
No
No
No
r _ jai
CRASH RATE WORKSHEET
Pi +yj
CITY/TOWN : Northampton COUNT DATE : 12/06/06 MHD USE ONLY
_l
DISTRICT: 2 UNSIGNALIZED : X SIGNALIZED: V source #
r ` � 1
sr:
INTERSECTION DATA _ c"
............................................................................... ............................. .1 -
MAJOR STREET: Route 9
RIN #
!!
MINOR STREET(S) : Leonard Street
RIN #
RIN #
f
RIN #
RIN #
I�
INTERSECTION
DIAGRAM
(Label Approaches)
APPROACH:
DIRECTION:
VOLUMES (PM) :
" K " FACTOR:
TOTAL # OF
ACCIDENTS:
1 2 3 4 5 6
NB SB EB
566 3313 16
OS APPROACH ADT : 11500 ADT =TOTAL VOU"K" FACT. "
# OF AVERAGE # OF 0
1 YEARS: 3 ACCIDENTS (A):
................................................................................ ............................ . -- ------- - - - - --
(A" 1,000,000 )
CRASH RATE CALCULATION: 0.0l3 RATE _ (ADT' 365 )
Source (optional): MassHighway
Comments:
INTERSECTION
REF #
Peak Hour Volumes
ME
Massnghway
CRASH RATE WORKSHEET
CITYfTOWN: Northampton
DISTRICT: 2
UNSIGNALIZED: x
- INTERSECTION DATA -
COUNT DATE: 12/06/06
SIGNALIZED:
I .........................................................................
MAJOR STREET: - Route 9
MINOR STREET(S) East Center Street
INTERSECTION
DIAGRAM
(Label Approaches)
APPROACH:
DIRECTION:
VOLUMES (PM) :
"K" FACTOR:
TOTAL # OF
ACCIDENTS:
Peak Hour Volumes
=.0-8= APPROACH ADT: 12100 ADT =TOTAL VOU"K" FACT.
4 OF AVERAGE # OF
YEARS: ACCIDENTS (A) :
------------ - .............................................................
MHD USE ONL
Source # =
RIN #
RIN 4t
RIN #
RIN #
RIN #
INTERSECTION
REF# =
............................................................................................... .............. .............
(A
CRASH RATE CALCULATION: 0.08 I RATE (ADT 365)
Source (optional) ,. MassHighway
Comments:
last updatecLAIM06/91
2
3
4
5
6
NB
SB
EB
599
1 358
11
1
=.0-8= APPROACH ADT: 12100 ADT =TOTAL VOU"K" FACT.
4 OF AVERAGE # OF
YEARS: ACCIDENTS (A) :
------------ - .............................................................
MHD USE ONL
Source # =
RIN #
RIN 4t
RIN #
RIN #
RIN #
INTERSECTION
REF# =
............................................................................................... .............. .............
(A
CRASH RATE CALCULATION: 0.08 I RATE (ADT 365)
Source (optional) ,. MassHighway
Comments:
last updatecLAIM06/91
l
assNighway
CRASH RATE WORI {SHEET
CITY/TOWN : Northampton
DISTRICT: 2
UNSIGNALIZED : X
-- INTERSECTION DATA -
COUNT DATE: 12/06/06 MHD USE ONLY
SIGNALIZED: Source #�
MAJOR STREET: forence Street
MINOR STREET(S) : Front Street
INTERSECTION
DIAGRAM
(Label Approaches)
APPROACH:
DIRECTION:
VOLUMES (PM) :
" K " FACTOR:
TOTAL # OF
ACCIDENTS:
1
2
3
4
5
6
NB
SB
WB
142
120
8
OS APPROACH ADT : 337 ADT =TOTAL VOL/ "K" FACT.
# OF AVERAGE # OF 0
1 YEARS : 3 ACCIDENTS (A) :
RIN #
RIN #
RIN # C]
RIN #
RIN #
INTERSECTION
REF #
.......................................... ..................... ..........
( A" 1,000,000)'"
CRASH RATE CALCULATION: 0.27 RATE _ -( ADT 365)
t
Source )ptional): MassHighway
Comments: „•
last updated: 11/06/01
Peak Hour Volurnes
Sight Distance
_983.0oNdo.sXmemog\Allachmeni.doc
19
AQ
O
0 >
.2
!o
v�
0 a a)
5 W o
0 o
0
3:: 2
>
C,
C,
B F
c
o
U
W 0
�
0
0 0
0
CQ
CO
E 2
a
>
12
:5
m 2 E. tS
a
C �o
'q E>
o o
E
J-
0
0
0
5 2
C � (u
;4 �i
co co co
M
co co co
ul
in
o
A
t T
m m
m m
U CJ
u u
0 co (U
-C—Z
U in (n En
w 0 w
4 cn
0 0 12
4
W
0 w M
0 A , 0
Ln
c a°
<
(V
:E
Z.
p
c,
F
i
u > W
2! Lr)
is
r
o
tj - Eu
0 a
m aj
76
-
vN P6
0 0 a
t:� E 5
LL
tP) 0 m
Q, 1 6 E -
•
-
LO
0 =
ro
CO co co
w
Co CO
LU 3:
u o 2 a
'E '
v ° h
w 3:
co
Ln
w E o
0
32
> >
Z
>
0 :s - � - . u
>
0
Ln
o Lo
T U t
M
C�
7K,
_0
—Qj
(U c
1 :5
a)
• r
th
'o
0
c c .
E E
m
qj
M r m
0
0
r.
L9
Ln
3 .c
C
a,
in US CL = a
m
2
12
I
m
Ix CL
CL
0 w 0 0
't A
a)
0
ow
b u
w Ln a.
C
0 B
19
AQ
O
P:\ 09983 .00 \docslmemos\Allachment.doc
i
Data Acquisition, Transformation & Analysis Inc.
-- - 50 Alden Ave. - ---
Belchertown, MA 01007
N / S: Front Street File Name : AM - Front @ Florence t
E / W: Florence Street Site Code : 02051979
City, State: Leeds, MA Start Date : 12/6/2006
Client: VHB / M. Chase Page No : 1
08:00 AM 2 0 4 0 2 10 0 0 0 0 0 0 0 34 3 0 55
08:15 AM 2 0 5 0 0 16 0 0 0 0 0 0 1 25 1 0 50
08:30 AM 1 0 5 0 5 23 0 0 0 0 0 0 0 46 0 0 80
0 8:45 AM 0 0 1 0 3 23 __ _ g 0 0 0 0 0 0 52 0 0 79
Total 5 0 15 0 10 72 0 0 0 0 0 0 1 157 4 0 264
Grand Total
19
Front Street
From North
isrou
S 1 "1111LCU- i l a aaiu a ua -
Florence Street
From East
as •
- -• -° — - - --
From South
0
Florence Street
From West
0
0
Start Time
Right
I Thru I Left
Peds
Right
I Thru I Left
Peds
Right
Tluv
Left
Peds
Right
Thru Left
Peds
Int. Totat
07:00 AM
1
0 2
0
0
11 0
0
0
0
0
0
0
32 1
1
0
0
47
52
07:15 AM
3
0 3
0
0
14 0
0
0
0
0
0
0
0
0
0
0
0
31
37 2
0
80
07:30 AM
8
0 7
3
0
0
2
0
24 0
16 0
0
0
0
0
0
0
0
49 2
0
72
_ 07:45 AM
Total
2
1 14
0
0 15
0
2
65 0
0
0
0
0
0
0
149 6
0
251
08:00 AM 2 0 4 0 2 10 0 0 0 0 0 0 0 34 3 0 55
08:15 AM 2 0 5 0 0 16 0 0 0 0 0 0 1 25 1 0 50
08:30 AM 1 0 5 0 5 23 0 0 0 0 0 0 0 46 0 0 80
0 8:45 AM 0 0 1 0 3 23 __ _ g 0 0 0 0 0 0 52 0 0 79
Total 5 0 15 0 10 72 0 0 0 0 0 0 1 157 4 0 264
Grand Total
19
0
30 0
12
137
0 0
0
0
0
0
1
306
10
0
515
Apprch %n
38.8
0
61.2 0
8.1
91.9
0 0
0
0
0
0
0.3
96.5
3.2
0
npp.Tmd
Total %
3.7
0
5.8 0
2.3
26.6
0 0
0
0
0
0
0.2
59.4
1.9
0
PCs and Peds
19
0
26 0
12
_
123
0 0
0
0
0
0
1
293
10
0
484
PCs and Peds
100
0
86.7 0
100
89.8
0 0
0
0
0
0
100
95.8
100
0
94
13
1-M and Bikes
0
0
0 0
0
5
0 0
0
0
0
0
0
0
0
8
2.6
0
0
0
0
2.5
_% HVs and Bikes
0
0
0 0
0
3.6
0 0
0
0
0
0
0
0
0
0
5
0
0
18
Buses
I
% Rses
0
0
0
0
4 0
13.3 0
0
0
9
6.6
0 0
0 0
0
0
0
0
0
1.6
0
0
3.5
Front Street
Florence Street
Florence Street
From North
From East
From South
From West
Start Time
Right Thru Left Peas npp.T.m,
Ri ^ne
Thru Left
_
Peas
npp.Tmd
Right
Thru
Left
Peas
np rmat
Right
Thru
Left
Peas
n i
m. rn nt
Peak Hour Analysis
From 07:00 AM to 08:45
AM Peak 1 of 1
Peak Hour for
Entire Intersection Begins at 08:00
AM
3
55
08:00 AM
2 0 4 0 6
2
10 0
0
12
0
0
0
0
0
0
1
34
25
1
0
0
37
27
50
08:15 AM
2 0 5 0 7
0
16 0
0
16
0
0
0
0
0
0
0
0
46
0
0
46
80
08:30 AM
1 0 5 0 6
5
23 0
0
28
0
0
0
0
0
0
0
0
52
0
0
52
7
08:45 AM
0 0 1 0 1
3
23 0
0
26
0
0
0
0
0
1
157
4
0
162
264
Total volume
5 0 15 0 20
10
72 0
0
82
0
0
0
0
0
1 0.6
96.9
2.5
0
7n App. Total
nTaF
25 0 75 0
.625 .000 .750 .000 .714
12.2
•500
87.8 0
.783 .000
0
.000
.732
•000
.000
.000
.000
.000
.250
.755
.333
.000
.779
.825
Data Acquisition Transformation Analysis Inc.
r 50 Alden Ave-. - --
Belchertown, MA 01007
N / S: Front Street File Name : AM - Front @ Florence
E / VV: Florence Street Site Code :02051979
City, State: Leeds, MA Start Date : 12/6/2006
Client: VHB / M. Chase Page No : 1
08:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2
08:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:30 AM 0 0 2 0 0 5 0 0 0 0 0 0 0 3 0 0 10
08:45 AM 0 0 0 0 0 3 0 _0 0 0 0 0 0 4 0 0 7
Total 0 0 2 0 0 8 0 0 0 0 0 0 0 9 0 0 19
Grand Total
0 0 4 0
Front Street
0 0 0 0
0 13 0 0
Florence Street
Apprch %
0
0
100 0
0
100
Florence Street
0
0
0 0
0
From North
0 0
0
From East
0
0
From South
0
45.2
0 0
From West
0
0 0
Start Time
Right
TThr-7 Left
I Peds
Right
Thru Left I
Peds
Right
I Thru
Left
Peds
Right
I Thru I Left I
Peds
Int. Total
07:00 AM
0
0 0
0
0
2 0
0
0
0
0
0
0
0 0
0
2
07:15 AM
0
0 0
0
0
1 0
0
0
0
0
0
0
1 0
0
2
07:30 AM
0
0 2
0
0
2 0
0
0
0
0
0
0
3 0
0
7
AM
0
0 0
0
0
1 0
0
0
0
0
0
0
0 0
0
1
_07:45
Total
0
0 2
0 1
0
6 0
0
0
0
0
0
0
4 0
0
12
08:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2
08:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
08:30 AM 0 0 2 0 0 5 0 0 0 0 0 0 0 3 0 0 10
08:45 AM 0 0 0 0 0 3 0 _0 0 0 0 0 0 4 0 0 7
Total 0 0 2 0 0 8 0 0 0 0 0 0 0 9 0 0 19
Grand Total
0 0 4 0
0 14 0 0
0 0 0 0
0 13 0 0
31
Apprch %
0
0
100 0
0
100
0 0
0
0
0 0
0
100
0 0
0
Total %
0
0
12.9 0
0
45.2
0 0
0
0
0 0
0
41.9
0 0
0
HVs and Bikes
0
0
0 0
0
5
0 0
0
0
0 0
0
8
0 0
13
HVs and Bikes
0
0
0 0
0
35.7
0 0
0
0
0 0
0
61.5
0 0
41.9
J Buses
0
0
4 0
0
9
0 0
0
0
0 0
0
5
0 0
18
% Buses
0
0
100 0
0
64.3
0 0
0
0
0 0
0
38.5
0 0
58.1
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Front Street
From North
Florence Street
From East
From South
Florence Street
From West
Stan Time
I Right Thru Left I Peas App. Taid
Right I Mu I Left I Peds App.Tnud
I Righl I Thru Left Peds I App.Tuut
Right I Thru I Left I Peds I ApryT omt
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
0 0
Peak Hour for Entire Intersection
Begins at 08:00 AM
0
5 0
0
08:00 AM
0
0
0
0
0
0
0
0
0
08:15 AM
0
0
0
0
0
0
0
0
0
08:30 AM
0
0
2
0
2
0
5
0
0
08:45 AM
0
0
0
0
0
0
3
0
0
Total Volurne
0
0
2
0
2
0
8
0
0
Total
Q
]QQ
Q
Q
]QQ
Q
0
_%App.
1 0
PHF
.000
.000
.250
.000
.250 1
.000
.400
.000
.000
0 0 0 0 0
0 0
0
0
0
5 0
0
0
0
3 0
0
0
0
3 0
0
0
0
0
0
0
0
1 .000
1
.000
.000
.000
0 0 2 0 0
0 0
0
0 0
0 0
3
0 0
0 0
4
0 0
0 0
9
0 0
0
100
0 0
1 .000
.563
.000 .000
IN. Toml
2 2
0 0
3 10
4 7
9.1 19
Data Acquisition, Transformation & Analy -is IrTc.
- - -50 Alden Ave.
Belchertown, MA 01007
N / S: Route 9 File Name : AM - Route 9 @ E. Center
E / W: East Center Street Site Code : 12060677
City, State: Leeds, MA Start Date : 12/6/2006
Client: VHB / M. Chase Page No : 1
Route 9
Vl VLL
- - - --
Route 9
East Center Street
From North
From East
From South
From West
Start Time
Right
Thu Left
Peds
Right
Thru
Left
Peds
Right
Thru
Left
Peds
Right
Thru
Left Peds
int. Total
07:00 AM
0
138 0
0
0
0
0
0
0 46
1
0
12
0
0
0
197
07:15 AM
0
149 0
0
0
0
0
0
0 24
0
0
10
0
0
0
183
07:30 AM
0
181 0
0
0
0
0
0
0 70
2
0
6
0
0
0
259
07:45 AM
0
142 0
0
0
0
0
0
0 73
3
0
6
0
1
0
225
Total
0
610 0
0
0
0
0
0
1
0 213
6
0
34
0
1
0
864
08:00 AM
0
151 0
0
0
0
0
0
0 68
2
0
12
0
0
0
233
08:15 AM
0
178 0
0
0
0
0
0
0 70
2
0
4
0
1
0
255
08:30 AM
0
179 0
0
0
0
0
0
0 61
1
0
7
0
0
0
248
08:45 AM
0
179 0
0
0
0
0
0
0 66
2
0
8
0
2
0
257
Total
0
687 0
0
0
0
0
0
0 265
7
0
31
0
3
0
993
Grand Total
0
1297 0
0
0
0
0
0
0 478
13
0
65
0
4
0
1857
Apprch %
0
100 0
0
0
0
0
0
0 97.4
2.6
0
94.2
0
5.8
'
0
Total %
0
69.8 0
0
0
0
0
0
0 25.7
0.7
0
3.5
0
0.2
0
PCs and Peds
0
1256 0
0
0
0
0
0
0 453
12
0
65
0
4
0
1790
t PCs and Peds
0
96.8 0
0
0
0
0
0
0 94.8
92.3
0
100
0
100
0
96.4
HVs d Bikes
an
0
35 0
0
0
0
0
0
0 20
1
0
0
0
0
0
56
7 HVs and Bikes
0
2.7 0
0
0
0
0
0
1
0 4.2
7.7
0
0
0
0
0
3
Buses
0
6 0
0
0
0
0
0
0 5
0
0
0
0
0
0
11
% Buses
0
0.5 0
0
0
0
0
0
0 I
0
0
0
0
0
0
0.6
Route 9
Route
9
East Center Street
From North
From East
From South
From West
Start Time
Right Thru
Left Peds
A T-1
Right
Thnt
Left
Peds
n��.rm�i
Right
TJuu Lett
Peas
n��. ro��i
Right
Thru Left
Peds
n,�. rooi
m,. Tomt
Peak Hour Analysis
From 07:00 AM to 08:45 AM
- Peak 1
of 1
Peak Hour for
Entire
Intersection Begins at 08:00
AM
08:00 AM
0 151
0 0
151
0
0
0
0
0
0
68 2
0
70
12
0 0
0
12
233
08:15 AM
0 178
0 0
178
0
0
0
0
0
0
70 2
0
72
4
0 1
0
5
255
08:30 AM
0 179
0 0
179
0
0
0
0
0
0
61 1
0
62
7
0 0
0
7
248
08:45 AM
0 179
0 0
179
0
0
0
0
0
0
66 2
0
68
8
0 2
0
10
257
Total Volume
0 687
0 0
687
0
0
0
0
0
0
265 7
0
272
31
0 3
0
34
993
'k App. Total
1 0 100
0 0
0
0
0
0
0
.000
97.4 2.6
.946 .875
0
.000
.944
91.2
.646
0 8.8
.000 .375
0
.000
.708
.966
PHF
.000
.959
.000 .000
.959
.000
.000
.000
.000
.000
Data
N / S: Route 9
E / W: Leonard Street
City, State: Leeds, MA
Client: VHB / M. Chase
�quisiti®n Transformation & An Inc. -
- -50 Alden Ave. -- - _
Belchertown, MA 01007
File Name : PM - Route 9 @ Leonard
Site Code : 23456789
Start Date : 12/6/2006
Page No : 1
05:00 PM 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2
05:15 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1
05:30 PM 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2
05 :45 PM 0 3 0 0 ___ 0 _.— 0 0 0 0 3 0_ 0 0 0 0_ 0 6
Total 1 4 0 0 0 0 0 0 0 6 0 0 0 0 0 0 11
Grand Total
3
Route 9
0 0
0
0
0
1
Route 9
16
0
Leonard Street
0
0
F_
0
From North
Apprch %
16.7
From East
0 0
0
From South
0
100
From West
100
0
Start Time
Right
Thru Left I
Peds
Right
Thru Left
Peds
Right
I Thru I Left I
Peds
Right
Thru I Left I
Peds
1nt. Total
04:00 PM
0
2 0
0
0
0 0
1
0
4 0
0
0
0 0
0
7
04:15 PM
1
4 0
0
0
0 0
0
0
3 0
0
0
0 0
0
8
04:30 PM
1
3 0
0
0
0 0
0
0
1 0
0
0
0 0
0
5
04:45 PM
0
2 0
0
0_
0 0
0
0
2 0
0
0
0 0
0
4
Total
2
11 0
0
0
0 0
1
0
10 0
0
0
0 0
0
24
05:00 PM 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2
05:15 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1
05:30 PM 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2
05 :45 PM 0 3 0 0 ___ 0 _.— 0 0 0 0 3 0_ 0 0 0 0_ 0 6
Total 1 4 0 0 0 0 0 0 0 6 0 0 0 0 0 0 11
Grand Total
3
15
0 0
0
0
0
1
0
16
0
0
0
0
0
0
35
Apprch %
16.7
83.3
0 0
0
0
0
100
0
100
0
0
0
0
0
0
T otal %
8.6
42.9
0 0
0
0
2.9
0
45.7
0
0
0
0
0
0
0 2 0 0 2 0
HVs and Bikes
1
13
0 0
.__0___
0
0
0
1
0
13
0
0
0
0
0
0
28
y fiw a ad Bikes
33.3
86.7
0 0
0
0
0
100
0
8 1.2
0
0
0
0
0
0
80
Buses
2
2
0 0
0
0
0
0
0
3
0
0
0
0
0
0
7
% Buses
66.7
13.3
0 0
0
0
0
0
0
18.8
0
0
0
0
0
0
20
Route 9
From North
From East
Route 9
From South
Leonard Street
From West
Start Time
Right Tla Left Peds n�.T..t
Right Thru Left Peds npp.'rm.t
Right Thru Left Peds n�.mw
Right Thru Left reds np
M1rmm
Int.Tumt
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak
1 of
1
Peak Hour for Entire Intersection Begins at 04:00 PM
0 2 0 0 2 0
0
0
1
1
0
4
0
0
4
0
0
0
0
0
7
04:00 I'M
04:15 I'M 1 4 0 0 5 0
0
0
0
0
0
3
0
0
3
0
0
0
0
0
8
04:30 I'M 1 3 0 0 4 0
0
0
0
0
0
1
0
0
1
0
0
0
0
0
5
04:45 I 'M 0 2 0 0 2 0
0
0
0
0
0
2
0
0
2
0
0
0 _
0
0
4
Total Volume
2 11 0 0 13
0
0
0
1
1
0
10
0
0
10
0
0
0
0
0
24
'90 App. T otal
15.4 84.6 0 0
0
0
0
100
0
100
0
0
0
0
0
0
PHF
.500 .688 .000 .000 .650 1
.000
.000
.000
.250
,250
.000
.625
.000
.000_ -
.625
.000
.000
.000
.000
.000
.750
/
r
Data Acquisition, Transformation - & -
50 Alden _Ave.
__
Belchertown, MA 01007
N / S: Route 9
E / W: Leonard Street
City, State: Leeds, MA
Client: VHB / M. Chase
File Name
: AM - Route 9 @ Leonard
Site Code
; 12345678
Start Date
: 12/6/2006
Page No
: 1
Route 9
From North
l]a
UU
J a aulwu
From East
- _ - - --
Route 9
From South
Leonard Street
From West
Start Time
Right
Tlvu Left
Peds
Right
Thru
Left
Peds
Right
Tluu
Left
Peds
Right
Thru
Left
Peds
Int.'rotal
07:00 AM
2
127
0 0
0
0
0
0
0 39
1
2
4
0
0
0
175
07:15 AM
1
152
0 0
0
0
0
0
0 35
0
0
1
0
0
0
189
07:30 AM
2
182
0 0
0
0
0
0
0 63
0
0
1
0
1
0
249
07:45 AM
0
133
0 0
0
0
0
0
0 70
0
0
2
0
0
0
205
Total
5
594
0 0
0
0
0
0
0 207
1
2
8
0
1
0
818
0
2
0
2
0
217
08:00 AM
1
142
0 0
0
0
0
0
0
0
0 70
0 78
0
0
0
2
0
1
0
248
08:15 AM
1
166
0 0
0 0
0
0
0
0
0
0
0 55
0
0
2
0
3
0
247
08:30 AM
4
183
0 0
0
0
0
0
0 69
1
0
4
0
3
0
240
08:45 AM
4
159 ____
0
0 272
1
0
10
0
9
0
952
Total
10
650
0 0
0
0
0
Grand Total
15
1244
0 0
0
0
0
0
0 479
2
2
18
0
10
0
1770
Apprch %
1.2
98.8
0 0
0
0
0
0
0 99.2
0.4
0.4
64.3
0 35.7
0
Total %
0.8
70.3
0 0
0
0
0
0
0 27.1
0.1
0.1
1
0
0.6
0
PCs and Peds
11
1208
0 0
0
0
0
0
0 455
2
0
18
0
10
0
1704
% PCs and Peas
73.3
97.1
0 0
0
0
0
0
0 95
100
0
100
0
100
0
96.3
HVs and Bikes
0
34
0 0
0
0
0
0
0 19
0
2
0
0
0
0
55
'7 HVs and Bikes
0
2.7
0 0
0
0
0
0
0 4
0
100
0
0
0
0
3.1
11
Buses
4
2
0 0
0
0
0
0
0 5
0
0
0
0
0
0
% Buses
26.7
0.2
0 0
0
0
0
0
0 1
0
0
0
0
0
0
0.6
Route 9
Route
9
Leonard Street
From North
From East
From South
From West
Start Tlme
Right Thru
Left Peds
nrr.T.�i
Right
17W
Left
Peds
nrr.T.-i
Right
Ttuv Left
Peds
nrr.Tmm
Right
Tluu Left
Peds
nrryT -1
InLTouJ
Peak Hour Analysis
From 07:00 AM to 08:45 AM
- Peak I
of 1
Peak Hour for
Entire
Intersection Begins
at 08:00
AM
08:00 AM
1 142
0 0
143
0
0
0
0
0
0
70 0
0
70
2
0 2
0
4
217
248
08:15 AM
1 166
0 0
167
0
0
0
0
0
0
78 0
0
78
2
0 1
0
3
08:30 AM
4 183
0 0
187
0
0
0
0
0
0
55 0
0
55
2
0 3
0
5
247
08:45 AM
4 159
0 0
163
0
0
0
0
0
0
69 1
0
70
4
0 3
0
7
240
Total Volume
10 650
0 0
660
0
0
0
0
0
0
272 1
0
273
10
0 9
0
19
952
App. Total
1.5 98.5
0 0
0
0
0
0
0
99. 0.4
0
52.6
0 47.4
0
pI1F
.625 .888
.000 .000
g$2
.000
.000
.000
.000
.000
.000
.872 L50
.000
.875
.625
.000 .750
.000
.679
.960
Data Acquisition, Transfc rrrmat cin & An Inc. -
50 Alden Ave,
Belchertown, MA 01007
'N / S: Route 9 File Name : PM - Route 9 @ E. Center
E / W: East Center Street Site Code : 12060678
City, ;3tate: Leeds, MA Start Date : 12/6/2006
Client.: VHB / M. Chase Page No : 1
1 TT[I.. .. —A I} :I..... T2....c
Route 9
kf
Route 9
East Center Street
From North
From
East
From South
_
From West
Start Time
Right Thru Left
Peds
Right I
Thru
Left
Peds
Right Tluv Left Peds
Right Thru Left Peds
Int. Total
04:00 PM
0 4
0 0
0
0
0
0
0 4 0
0
0 0 0 0
8
04:15 PM
0 3
0 0
0
0
0
0
0 3 0
0
0 0 0 0
6
04:30 PM
0 3
0 0
0
0
0
0
0 1 0
0
0 0 0 0
4
04:45 PM
0 1
0 0
0
_ 60
0
0
0
0 3 0
0
0 0 0 0
4
Total 0 11
0 0
F
0
0
0 11 0
0
0 0 0 0 22
05:00 PM 0 2
05:15 PM 0 0
0 0
0 0
0
0
0
0
0
0
0
0
0 0 0
0 1 0
0
0
0 0 0 0 2
0 0 0 0 1
05:30 PM 0 0
0 0
0
0
0
0
0 0 0
0
1 0 0 0 1
05:4 PM 0 _ 2
0 0
0
0
0
0
0 3 0
0
0 0 0 0 5
Total 0 4
0 0
0
0
0
0
0 4 0
0
1 0 0 0 9
Grand'rotal 0 15
Apprch % 0 100
0 0
0 0
0
0
0
0
0
0
0
0
0 15 0
0 100 0
0
0
1 0 0 0 31
100 0 0 0
% 0 48.
0 0
0
0
0
0
0 48.4 0
0
3.2 0 0 0
-- To tal
HVs and Bikes 0 14
0 0
0
0
0
0
0 12 0
0
1 0 0 0 27
% } rvs and Bikes 0 93.3
0 0
0
0
0
0
0 80 0
0
100 0 0 0 87.1
Buses 0 1
0 0
0
0
0
0
0 3 0
0
0 0 0 0 4
% Buses 0 6.7
0 0
0
0
0
0
0 20 0
0
0 0 0 0 12.9
9
East Center Street
Route 9
Route
From North
From East
From South
From West
Th .
S[art T1me RighTh. Le {t Peds
nrr. romt
Right Thru
Left
Peds
n,,.rmm
Right Thru Left Peds
nrr r
Right Thru Left I Peds n� root m.tmat
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins
at 04:00 PM
4 0 0
4
0 0 0 0 0 8
04:00 PM 0 4 0 0
4
0 0
0
0
0
0
04:15 PM 0 3 0 0
3
0 0
0
0
0
0 3 0 0
3
0 0 0 0 0 6
04:30 PM 0 3 0 0
3
0 0
0
0
0
0 1 0 0
I
0 0 0 0 0 4
04:45 PM _ 0 1 0 0
1
0 0
0
0
0
0 3 0 0
3 —
_ 0 0 0 0 0 4
Total Volume
0 11 0 0
11
0 0
0
0
0
0 11 0 0
11
0 0 0 0 0
22
7 App.
0 100 0 0
1
0 0
0
0
0 100 0 0
0 0 0 0
_ Total
PHI
1 .000 .688 .000 .000
.688 1
.000 .000
.000
.000
.000 t
.0 00 .688 .000 .000
.688
1 .000 .000 .000 .000 .000
.688
Data Acquisiti T ransfor - & Anal-ysis Inc.
50 -Alden Ave.-
Belchertown, MA 01007
N / S: Front Street - File Name : PM - Front @ Florence
E / W: Florence Street Site Code : 05161961
City, State: Leeds, MA Start Date : 12/6/2006 -
Client: VHB / M. Chase Page No : 1
05:00 PM
1 0 1 0
Front Street
b ruu
s r ituLCU a w .,.,., _ ...,� -
Florence Street
._ . � ---�
- --- - -�
_ ____
0
0
Florence Street
28
8
0
72
From North
1 0 0 0
From East
0
25
From South
0
0
From West
0
0
0
Start Time
Right
I Thru Left
Peds
Right I Thru Left I
Peds
Right
I Thru I
Left
Peds
Right
I Thru I Left I
Peds
Int. Total
04:00 PM
2
0 0
0
4 25 0
0
0
0
0
0
0
0
0
23 3
20 0
0
0
57
60
04:15 PM
1
0 1
0
0 38 0
0
0
0
0
0
0
0
0
0
0
26 4
0
60
04:30 PM
1
0 1
0
0
1 27 0
2 40 0
0
0
0
0
0
0
29 5
0
78
04:45 PM
Total
1
1 5
0 1
0 3
0
7 130 0
0
1 0
0
0
0
0
98 12
0
255
05:00 PM
1 0 1 0
0
34
0
0
0
0
0
0
0
28
8
0
72
05:15 PM
1 0 0 0
Apprch %
0
25
0
0
0
0
0
0
0
0
0
28
31
1
2
0
0
55
63
05:30 PM
1 0 3 0
0 0 0
0
0
26
33
0
0
0
0
0
0
0
0
0
0
0
0
21
2
0
57
05:45 PM
Total
1
4 0 4 0
0
0
0
118
0
0
0
0
0
0
0
108
13
0
247
Grand Total
9
0
7
0
7
248
0 0
0
0
0
0
0
206
25
0
502
Apprch %
56.2
0
43.8
0
2.7
97.3
0 0
0
0
0
0
0
89.2
10.8
0
Total %
1.8
0
1.4
0
1.4
49.4
0 0
0
0
0
0
0
0
41
202
5
25
0
0
493
PCs and Peds
8
0
5
0
7
246
0 0
0
0
0
0
0
0
0
98.1
100
0
98.2
1 PCs and Peds
88.9
0
71.4
0
100
99.2
0 0
0
0
34
78
04:45 PM 1 0 1 0 2 2
1
0
0
1
HVs and Bikes
0
0
0
0
0
0
0 0
0
0
0
0
0
0
0
0
0.5
0
0
1 0.2
1Ns mid Bikes
0
0
0
0
0
0
0 0
0 0
0
0
0
0
0
0
0
3
0
0
8
Buses
Ruses
1
11.1
0
0
2
28.6
0
0
0
0
2
0.8
0 0
0
0
0
0
0
1.5
0
0
1.6
Start Time
Front Street
Florence Street
Thru Left Peds
Florence Street
Right
From or North
From East
From South
From West
Right
Thru
Left
Peds
npprm,t
Start Time
Right Thru Leff Peds nP�.rmm
Right
Thru Left Peds
n�..rm „i
Right
Thal
Left
Peds
aP�.row
Right
Thru
Left
Peds
npprm,t
1nt.Towl
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak
1 of
1
Peak Hour for Entire Intersection Begins at 04:15 PM
0
20
0
0
20
60
04:15 PM 1 0 1 . 0 2 0
38
0
0
38
0
0
0
0
0
0
0
0
26
4
0
30
60
04:30 PM 1 0 1 0 2 1
27
0
0
28
0
0
0
0
0
0
29
5
0
34
78
04:45 PM 1 0 1 0 2 2
40
0
0
42
0
0
0
0
0
0
0
28
. 8
0
36
72
05:00 PM 1 0 1 0 2 0
34
0
0
34
0
0
0
0
0
0
103
17
0
120
270 .
Total Volume 4 0 4 0 8 3
139
0
0
142
0
0
0
0
0
0
85.8
14.2
0
40 App. Total 50 0 50 0 2.1
97
0
0
0
.000
.000
.888
.531
.000
.833
.865
P�1F l.000 .000 1.000 .000 1.000 .375
.869
.000
.000
.845
.000
.000
.000
.000
Data Acquisition, Trans formatic►n &Analysis - Inc.
-
50 Alden Ave:
Belchertown, MA 01007
N / S: Front Street File Name PM - Front @ Florence
E / W: Florence Street Site Code : 05161961
City, State: Leeds, MA Start Date :12/6/2006
Client: VHB / M. Chase Page No : 1
Grand Total
1 0 2 0
Front Street
0
0
Florence Street
0
0
0
0 0 0 0
1
05:00 PM
Florence Street
0
0 0
[Sta:Aj
1
From North
0
0 0
From Fast
0
05:15 PM
From South
0
0 0
0
From West
0 0
0
0 0 0
Right
Thru Left
Peds
Right
Tlnv Left
Peds
Right
Thru
Left
Peds
Right
Tluu Left
Peds
Int. Total
04:00 PM
0
0 0
0
0
0 0
0
0
0
0
0
0
0 0
0
0
04:15 PM
0
0 1
0
0
0 0
0
0
0
0
0
0
0 0
0
1
04:30 PM
1
0 0
0
0
0 0
0
0
0
0
0
0
1 0
0
2
04:4 PM
0
0 0
0
0
1 0
0
0
0
0
0
0
0 0
0
1
Total
1
0 1
01
0
1 0
0
0
0
0
0
0
1 0
0
4
Grand Total
1 0 2 0
0 2 0 0
0
0
0
0
0
0
0 0 0 0
1
05:00 PM
0
0
0 0
0
1
0 0
0
0 0
0
0
05:15 PM
0
0
0 0
0
0
0 0
0
0 0 0
0 0 0 0
0
05:30 PM
0
0
1 0
0
0
0 0
0
0 0 0
0 2 0 0
3
05:45 PM
0
0
0 0
0
0
0 0
0
0 0 0
0 1 0 0
1
Total
0
0
1 0
0
1
0 0
0
0 0 0
0 3 0 0
5
Grand Total
1 0 2 0
0 2 0 0
0
0
0
0
0
4
0 0
9
Apprch °0
33.3
0
66.7 0
0
100
0
0
0
0
0
0
0
100
0 0
To tal %
11.1
0
22.2 0
0
22.2
0
0
0
0
0
0
0
44.4
0 0
0
HVs and Bikes
0
0
0 0
0
0
0
0
0
0
0
0
0
1
0 0
1
�p FIVs and Bikes
0
0
0 0
0
0
0
0
0
0
0
0
0
25
0 0
11.1
Buses
1
0
2 0
0
2
0
0
0
0
0
0
0
3
0 0
8
Buses
100
0
100 0
0
100
0
0
0
0
0
0
0
75
0 0
88.9
Front Street
From North
Florence Street
From East
From South
Florence Street
From West
Stan Time
Right Thru Left Peds npp.Ted
Right Thru Left Peds nppTmm
Right Thru :Left Peds npp.Tew
Right Ttw Left Peds A..-.-'
Iat.Toml
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak
I of
I
Peak Hour for Entire Intersection Begins at 04:15 PM
0
0
0
0
0
0
0
1
04:15 PM 0 0 1 0 1 0
0
0
0
0
0
0
0
04:30 PM 1 0 0 0 1 0
0
0
0
0
0
0
0
0
0
0
1
0
0
1
2
04:45 PM 0 0 0 0 0 0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
1
05:00 PM 0 0 0 0 0 0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
1
Total Volume
1 0 1 0 2
0
2
0
0
2
0
0
0
0
0
0
1
0
0
1
5
% App. Tot
50 0 50 0
0
100
0
0
0
0
0
0
0
100
0
0
1 Pi-l'F
.250 .000 l50 .000 .500
.000
.500
.000
.000
.500
.000
.000
.000
.000
.000
.000
.250
.000
.000
.250
625
Data Acquisition, Transformation & Analysis inc.
50 Alden Ave: - - - -
Belchertown, MA 01007
N / S: Route 9 File Name : PM - Route 9 @ E. Center
E / W: East Center Street Site Code :12060678
City, State: Leeds, MA Start Date : 12/6/2006
Client: VHB / M. Chase Page No : 1
05:00 PM 0 94 0 0 0 0 0 0 0 165 7 0 2 0 0 0 268
05:15 PM 1 84 0 0 0 0 0 0 0 155 5 0 8 0 0 0 253
05:30 PM 0 83 0 0 0 0 0 0 0 146 9 0 4 0 0 0 242
05:45 PM 0_ 78 0 0 0 0 0 0 0 131 -_ 8 0 10 0 1 0 228
Total 1 339 0 0 0 0 0 0 0 597 29 0 24 0 1 0 991
Grand Total
2
Route 9
From North
%"I
Vll J•A111—U - A
From East
0
0 0
- --- --
Route 9
From South
-
East Center Street
From West
0
33
Start Time
Right
Thru Left
Peds
Right
Thru
Left
Peds
Right
Thru Left
Peds
Right
Thru Left
Peds
tot. Totat
04:00 PM
1
86 0
0
0
0
0
0
0
125 6
0
1
0 0
0
.219
04:15 PM
0
84 0
0
0
0
0
0
0
148 5
0
3
0 0
0
240
04:30 PM
0
78 0
0
0
0
0
0
0
133 3
0
3
0 0
0
217
04:45 PM
0
102 0
0
0
0
0
0
0
128 10
0
2
0 1
0
243
Total
1
350 0
0
0
0
0
01
27
534 24
0
9
0 1
0
919
05:00 PM 0 94 0 0 0 0 0 0 0 165 7 0 2 0 0 0 268
05:15 PM 1 84 0 0 0 0 0 0 0 155 5 0 8 0 0 0 253
05:30 PM 0 83 0 0 0 0 0 0 0 146 9 0 4 0 0 0 242
05:45 PM 0_ 78 0 0 0 0 0 0 0 131 -_ 8 0 10 0 1 0 228
Total 1 339 0 0 0 0 0 0 0 597 29 0 24 0 1 0 991
Grand Total
2
689
0 0
0
0
0 0
0
1131
53
0
33
0
2
0
1910
Apprch %
0.3
99.7
0 0
0
0
0 0
0
95.5
4.5
0
94.3
0
5.7
0
Start7'ime
Total %
0.1
36.1
0 0
0
0
0 0
0
59.2
2.8
0
1.7
0
0.1
0
Left
PCs and Peds
2
674
0 0
0
0
0 0
0
1 116
53
0
32
0
2
0
1879
7 PCs and Ped
100
97.8
0 0
0
0
0 0
0
98.7
100
0
97
0
100
0
98.4
HVs and Bikes
0
14
0 0
0
0
0 0
0
12
0
0
1
0
0
0
27
}iVs and Bikes
0
2
0 0
0
0
0 0
0
1.1
_ 0
0
3
0
0
0
1.4
Buses
0
1
0 0
0
0
0 0
0
3
0
0
0
0
0
0
4
�ln Roses i i
0
0.1
0 0
0
0
0 0
0
0.3
0
0
0
0
0
0
0.2
Route 9
Route 9
East Center Street
From North
From East
From South
From West
Start7'ime
Right
TIuTt
Left
Peds
npp.Tmul
Right
Thru
I Left
Peds
App.T -1
Right
I TIM I
Left
Peas
npp.T -1
Int. Total
Peak Hour Analysis
From 04:00 PM to
05:45 PM - Peak
1 of
1
Peak Hour for Entire Intersection Begins at 04:45
PM
04:45 PM
0
102 0 0
102
0
0
0
0
0
0
128
1
0
138
2
0
1
0
3
243
05:00 PM
0
94 0 0
94
0
0
0
0
0
0
165
7
0
172
2
0
0
0
2
268
05:15 PM
1
84 0 0
85
0
0
0
0
0
0
155
5
0
160
8
0
0
0
8
253
05:30 PM
0
83 0 0
83
0
0
0
0
0
0
146
9
0
155
4
0
0
0
4
242
7'otnl Volume
1
363 0 0
364
0
0
0
0
0
0
594
31
0
625
16
0
1
0
17
1006
APP• Totat
0.3
99 0 0
0
i
0
0
0
0
95
5
0
94.1
•500
0
.000
5.9
.250
0
.000
.531
.938
PTiF
.250
.890 .000 .000
.892
. 000
.000
.000
.000
.000 1
.000
.900
.775
.000
.908
1
Data Acquisition, Transformation Analysis
50 Alden Ave. -
Belchertown, MA 01007
N / S: Route 9 File Name : PM - Route 9 @ Leonard
E / W: Leonard Street Site Code :23456789
City, State: Leeds, MA Start Date :12/6/2006
Client: VHB / M. Chase Page No :1
05:00 PM. 0 76 0 0 0 0 0 0 0 156 3 0 4 0 3 0 242
05:15 PM 1 80 0 0 0 0 0 0 0 147 1 0 2 0 1 0 232
05:30 PM 1 74 0 0 0 0 0 0 0 141 2 0 1 0 2 0 221
05:45 PM 2 74 0 0 0 0 0 0 0 119 1 0_ 2 0 2 0 200
Total 4 304 0 0 0 0 0 0 0 563 7 0 9 0 8 0 895
Grand Total
8
Route 9
From North
0 0
From East
0
0
Route 9
From South
0
1088
Leonard Street
From West
15
0
Start Time
Right
Thru Left
Peds
Riglit
Thru Left
Peds
Right
Tluv Left
Peds
Right
Thru Left
Peds
Int. Total
04:00 PM
1
86 0
0
0
0 0
1
0
118 1
0
1
0 0
0
208
04:15 PM
2
81 0
0
0
0 0
0
0
158 3
0
1
0 1
0
246
04:30 PM
1
76 0
0
0
0 0
0
0
130 0
0
2
0 1
0
210
04:45 PM
0
102 0
0
0
0 0
0
0
119 3
0
2
0 2
0
228
Total
4
345 0
0
0
0 0
1
0
525 7
0
6
0 4
0
892
05:00 PM. 0 76 0 0 0 0 0 0 0 156 3 0 4 0 3 0 242
05:15 PM 1 80 0 0 0 0 0 0 0 147 1 0 2 0 1 0 232
05:30 PM 1 74 0 0 0 0 0 0 0 141 2 0 1 0 2 0 221
05:45 PM 2 74 0 0 0 0 0 0 0 119 1 0_ 2 0 2 0 200
Total 4 304 0 0 0 0 0 0 0 563 7 0 9 0 8 0 895
Grand Total
8
649
0 0
0
0
0
1
0
1088
14 0
15
0
12 0
1787
Apprch %
1.2
98.8
0 0
0
0
0
100
0
98.7
1.3 0
.55.6
0
44.4 0
Total %
0.4
36.3
0 0
0
0
0.1
0
60.9
0.8 0
0.8
0
0.7 0
PCs and Peds
5
634
0 0
0
0
0
0
0
1072
14 0
15
0
12 0
1752
PCs a Peds
62.5
97.7
0 0
0
0
0
0
0
98.5
100 0
100
0
100 0
98
HVs and Bikes
1
13
0 0
0
0
0
1
0
13
0 0
0
0
0 0
28
H Vs mtd Bikes
12.5
2
0 0
0
0
0
100
0
1.2
0 0
0
0
0 0
1.6
Buses
2
2
_
0 0
0
0
0
0
0
3
0 0
0
0
0 0
7
Rnses
25
0.3
0 0
0
0
0
0
0
0.3
0 0
0
0
0 0
0.4
T- Route 9 Route 9 Leonard Street
From North From East From South I From West
Start Time I Right I Thru I Left I Peds I App.Tmd Right Tluu I Left Peds APITaw Right I Thru I Left I Peds Apr. -1 I Right Thru I Left I Peds Arr T-1 Int.Tmot
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of I
Peak Hour for Entire Intersection Begins at 04:15 PM 246
04:15 PM 2 81 0 0 83 0 0 0 0 0 0 158 3 0 161 1 0 1 0 2
04:30 PM 1 76 0 0 77 0 0 0 0 0 0 130 0 0 130 2 0 1 0 3 210
04:45 PM 0 102 0 0 102 0 0 0 0 0 0 119 3 0 122 2 0 2 0 4 228
05:00 PM 0 76 0 0 76 0 0 0 0 0 0 156 3 0 159 11 0 3 0 7 242
Toml Volume 3 335 0 0 338 0 0 0 0 0 0 563 9 0 572 9 0 7 0 16 926
�• A Tot.t 0.9 99 0 0 0 0 0 0 0 98.4 1.6 0 56.2 0 43.8 0
pf4F 1 .375 .821 .000 .000 ,828 1 .000 .000 .000 .000 .000 1 .000 .891 .750 .000 .888 1 .563 .000 .583 .000 .571 1 .941
� t ,
i
Data Acquisition, Transformation - & Analysis - In
50 Alden Ave.
Belchertown, MA 01007
: AM - Route 9 @ Leonard
:12345678
:12/6/2006
:1
N / S: Route 9
E / Wt: Leonard Street
City, State: Leeds, MA
Client: VHB / M. Chase
File Name
Site Code
Start Date
Page No
EStart
Route 9
From North
l A vu 1J 1
From East
Route 9
From South
Leonard Street
From West
_
Right
Thru
Left Peds Right Thru
Left
Peds
Right
Tinru
Left
Peds
Right
Thru Left
Peds
Int. Total
07:00 AM
0
5
0 0 0
0
0
0
0
5
0
2
0
0 0
0
12
07:1.5 AM
0
6
0 0 0
0
0
0
0
3
0
0
0
0 0
0
9
07:30 AM
2
6
0 0 0
0
0
0
0
7
0
0
0
0 0
0
15
07:45 AM
0
3
0 0 0 _
0
0
0
0
5
0
0
0
0 0
0
8
Total
2
20
0 0 0
0
0
0
0
20
0
2
0
0 0
0
44
08:00 AM
08:15 AM
0
0
2
3
0 0 0
0 0 0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0 0
0 0
0 0
0
0
0
2
6
10
08:30 AM
2
7
0 0 0
0
0
0
0
1
0 0
0
0
0
0
0
0
0
0
0 0
0
4
08:45 AM
0
4_
0
0 0
0
0
0
0
4 0
0 0 0 0
0
22
Total
2
16
0
0
24
0
2
0
0 0
0
66
Grand Total
4
36
0 0 0
0
0
0
0 0
0
Apprch %
10
90
0 0 0
0
0
0
0
92.3
0
7.7
0
Total %
6.1
54.5
0 0 0
0
0
0
0
36.4
0
3
0
0 _ 0
0
HVs and Bikers
0
34
0 0 0
0
0
0
0
19
0
2
0
0 0
0
55
%HVs
0
94.4
0 0 0
0
0
0
0
79.2
0
100
0
0 0
0
83.3
Buses
4
2
0 0 0
0
0
0
0
5
0
0
0
0 0
0
11
% Buses
100
5.6
0 0 0
0
0
0
0
20.8
0
0
0
0 0
0
16.7
Route
9
Route
9
Leonard Street
From North
From East
From South
From West
_
Start Tinle
Right Thru
Left
Peds n,T.T.0
Right TIM
Lef[
Peds
nrry Tomt
Right Thru Left
Peds
App. T-1
Right
Thru Left Peds
nrry Tuim
Int. Tomt
Peak Hour Analysis
From
07:00
AM to 08:45 AM
- Peak I of
I
Peak Hour for
Entire Intersection
Begins at 07:00
AM
2
7
0
0 0 0
0
12
07:00 AM
0 5
0
0 5
0 0
0
0
0
0
5 0
0
0
9
07:15 AM
0 6
0
0 6
0 0
0
0
0
0
3 0
0
3
0
0 0
15
07:30 AM
2 6
0
0 8
0 0
0
0
0
0
7 0
0
7
0
0 0 0
0
07:45 A
0 3
0
0 3
0 0
0
0
0
0
5 0
0
5
0
0 0 0
0
8
Total Volurne
2 20
0
0 22
0 0
0
0
0
0
20 0
2
22
0
0 0 0
0
44
%n App. Total
1 9.1
90.9
0
0
0 0
0
0
0 9 0
9.1
0
0 '0 0
PHF
250 .83
.000
.000 .6881
.000 .000
.000
.000
.000
.000 .714
.000
—
786
.000
.000 .000 .000
.000
.733
Data Acquisition T- r-ansformation -& Analysiss In � -
- 50 Alden Ave.
Belchertown, MA 01007
N / S: Route 9 File Name : AM - Route 9 @ E. Center
E / W: East Center Street Site Code : 12060677
City, State: Leeds, MA Start Date : 12/6/2006
Client: V'HB / M. Chase Page No : 1
1717.......1 1}:1..... D --
08:00 AM
0
Route 9
0
0
0 0 0 0
0
0
0
Route 9
0
East Center Street
0
0
3
08:15 AM
From North
2
0
From East
0 0 0 0
0
From South
0
From West
0
0
_
Start T'iine
Right
Thru Left
Peds
Right
Thru
Left
Peds
Right
Thru Left
Peds
Right Thru Left
Peds
It. Total
07:00 AM
_
0
7 0
0
0
0
0
0
0
8 0
0
0 0 0
0
15
07:15 AM
0
6 0
0
0
0
0
0
0
2 0
0
0 0 0
0
8
07:30 AM
0
6 0
0
0
0
0
0
0
6 0
0
0 0 0
0
12
07:45 AM
0__6
0
0
0
0
0
0
0
5 0
0
0 0 0
0
11
Total
0
25 0
0
0
0
0
0
0
:21 0
0
1 0 0 0
0
46
08:00 AM
0
3
0
0
0 0 0 0
0
0
0
0
0
0
0
0
3
08:15 AM
0
2
0
0
0 0 0 0
0
3
0
0
0
0
0
0
5
08:30 AM
0
6
0
0
0 0 0 0
0
1
0
0
0
0
0
0
7
08:45 AM
0
5
0
0
0 0 0 0
0
0
1
0
0
0
0
0
6
Total
0
16
0
0
0 0 0 0
0
4
1
0
0
0
0
0
21
Grand Total
Apprch %
0
0
41
100
0 0
0 0
0
0
0
0
0
0
0
0
0
0
25 1 0
96.2 3.8 0
0 0 0 0 67
0 0 0 0
To tal %
0
61.2
0 0
0
0
0
0
0
37.3 1.5 0
0 0 0 0
HVs Bikes
0 35 0
0
0
0
0
0
0
20 1 0
0 0 0 0 56
and
Y HV s and Bikes
0
85.4
0 0
0
0
0
0
0
80 100 0
0 0 0 0 83.6
Buses
0
_
6
0 0
0
0
0
0
0
5 0 0
0 0 0 0 11
%Buses
0
14.6
0 0
0
0
0
0
0
20 0 0
0 0 0 0 16.4
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:00 AM
8
0
0
8
0
0
0
0
0
15
07:00 AM 0 7 0 0 7 0
0
0
0
0
0
07:15 AM 0 6 0 0 6 0
0
0
0
0
0
2
0
0
2
0
0
0
0
0
8
07:30 AIA 0 6 0 0 6 0
0
0
0
0
0
6
0
0
6
0
0
0
0
0
12
07:45 AM 0 6 0_ 0 6 0
0
0
0
0
0
5
0
0
5
0
0
0
0
0
11
Total Volume
0 25 0 0 25
0
0
0
0
0
0
21
0
0
21
0
0
0
0
0
46
`7n App. Tota
0 100 0 0
0
0
0
0
0
100
0
0
0
0
0
0
_
PT
.000 .893 .000 .000 .893
.000
.000
.000
.000
.000
.000
.656
.000
.000
.656
.000
.000
.000
.000
.000
.767
I �
- - _ - Trip Generation
P_:1 09983 .00\do..\m.mo,Vlttachment.doc - - - -. -- -- - - -- -- - -- - - - - - - -
Site Generated Traffic
AM (PM)
Northampton, Massachusetts
ITE TRIP GENERATION WORKSHEET
(7th Edition, Updated January 2004)
LANDUSE: Single - Family Detached Housing
LANDUSE CODE: 210 Independent Variable - -- Number of Units
JOB NAME:
JOB NUMBER:
UNITS ( #): _ 21
WEEKDAY
TRIPS: BY AVERAGE BY REGRESSION
Total Enter Exit Total Enter Exit
DAILY 212:_' 106, 108 243 121 121
PEAK OF GENERATOR 20.:: 11 .. 9:. 30 16 14
SUNDAY
Directional
RATES: Total Trip Ends Independent Variable Range Distribution
# Studies RA2 Average Low High Average Low High Enter Exit
DAILY 69 0.94 8.78 4.74 12.31 218 15 1,000 50% 50%
PEAK OF GENERATOR 51 0.88 0.86 0.55 1.48 217 15 675 53% 47%
TRIPS: BY AVERAGE BY REGRESSION
Total Enter Exit Total Enter Exit
DAILY 184 92 92' 176 88 88;..`
PEAK OF GENERATOR 1.8,. 10 8 23 12
P: \10006.00 \ssheets \Trip Gen \Trip Gen 210 - Single Fam Single Family Housing - 210 1/4/2007
Directional
RATES:
Total Trip Ends
Independent Variable Range
Distribution
# Studies
RA2
Average
Low
High
Average Low
High
Enter Exit
DAILY
350
0.96
9.57
4.31
21.85
197 2
2,900
50% 50%
AM PEAK (ADJACENT ST)
274
0.89
0.75
0.33
2.27
201 2
2,900
75%
PM PEAK (ADJACENT ST)
302
0.91
1.01
0.42
2.98
214 2
2,900
63% 37%
6 3 %
BY AVERAGE
BY REGRESSION
TRIPS:
Total
Enter
Exit
Total Enter
Exit
DAILY
201
100.
100.
247 124..
' 124`
AM PEAK (ADJACENT ST)
16
4
12
24 6
PM PEAK (ADJACENT ST)
21
13 .
8
26 17 ?
10 ,.
SATURDAY
Directional
RATES:
Total Trip Ends
Independent Variable Range
Distribution
# Studies
RA2
Average
Low
High
Average Low
High
Enter Exit
DAILY
73
0.93
10.10
5.32
15.25
214 15
1,000
50% 50%
PEAK OF GENERATOR
52
0.90
0.94
0.50
1.75
220 15
675
54% 46%
TRIPS: BY AVERAGE BY REGRESSION
Total Enter Exit Total Enter Exit
DAILY 212:_' 106, 108 243 121 121
PEAK OF GENERATOR 20.:: 11 .. 9:. 30 16 14
SUNDAY
Directional
RATES: Total Trip Ends Independent Variable Range Distribution
# Studies RA2 Average Low High Average Low High Enter Exit
DAILY 69 0.94 8.78 4.74 12.31 218 15 1,000 50% 50%
PEAK OF GENERATOR 51 0.88 0.86 0.55 1.48 217 15 675 53% 47%
TRIPS: BY AVERAGE BY REGRESSION
Total Enter Exit Total Enter Exit
DAILY 184 92 92' 176 88 88;..`
PEAK OF GENERATOR 1.8,. 10 8 23 12
P: \10006.00 \ssheets \Trip Gen \Trip Gen 210 - Single Fam Single Family Housing - 210 1/4/2007
ITE TRIP GENERATION WORKSHEET
(7th Edition, Updated January 2004)
LANDUSE: Apartment
LANDUSE CODE: 220 Independent Variable - -- Number of Units
JOB NAME:
JOB NUMBER:
UNITS ( #): 4
WEEKDA Y
SATURDAY
Directional
RATES:
Total Trip Ends
Independent Variable Range
Distribution
# Studies RA2
Average
Low
High
Average Low
High
Enter Exit
DAILY 86 0.88
6.72
2.00
12.50
212 0
1000
50% 50%
AM PEAK (ADJACENT ST) 78 0.83
0.51
0.10
1.02
235 0
1100
20% 80%
PM PEAK (ADJACENT ST) 90 0.77
0.62
0.10
1.64
233 0
1100
65% 35%
TRIPS:
BY AV ERAGE
BY REGRESSION
TRIPS:
Total
Enter
Exit
Total Enter
Exit
BY AVERAGE
DAILY
27
13
13
174. :.. :..87- c;.::,:.::.
87.,
Exit
AM PEAK (ADJACENT ST)
..2..
0
2
6 1
5 `
i.12:'.
PM PEAK (ADJACENT ST)
;;. 2' ..
2.
1
20
21
SATURDAY
SUNDAY
Directional
RATES: Total Trip Ends Independent Variable Range Distribution
# Studies RA2 Average Low High Average Low High Enter Exit
DAILY 14 0.82 5.86 3.21 7.53 182 90 360 50% 50%
PEAK OF GENERATOR 13 0.51 0.26 1.43 186 90 380 Peak Distribution
Not Availble
TRIPS: BY AVERAGE BY REGRESSION
Total Enter Exit Total Enter Exit
DAILY 23 12 12 -75 -38 -38
PEAK OF GENERATOR 2. NA N A NA NA::: NA.
PA10006.00 \ssheets \Trip Gen \Trip Gen 220 Apt 4 units Apartment - 220 1/4/2007
Directional
RATES:
Total Trip Ends
Independent Variable Range
Distribution
# Studies RA2
Average
Low
High
Average Low
High
Enter Exit
DAILY 15 0.85
6.39
2.84
8.40
175 65
360
50% 50%
PEAK OF GENERATOR 14 0.56
0.52
0.26
1.05
178 65
360
Peak Distribution
Not Availble
TRIPS:
BY REGRESSION
BY AVERAGE
Total
Enter
Exit
Total Enter
Exit
DAILY
2G,`
13
13
-225 112
i.12:'.
PEAK OF GENERATOR
2
NA
NA
21
SUNDAY
Directional
RATES: Total Trip Ends Independent Variable Range Distribution
# Studies RA2 Average Low High Average Low High Enter Exit
DAILY 14 0.82 5.86 3.21 7.53 182 90 360 50% 50%
PEAK OF GENERATOR 13 0.51 0.26 1.43 186 90 380 Peak Distribution
Not Availble
TRIPS: BY AVERAGE BY REGRESSION
Total Enter Exit Total Enter Exit
DAILY 23 12 12 -75 -38 -38
PEAK OF GENERATOR 2. NA N A NA NA::: NA.
PA10006.00 \ssheets \Trip Gen \Trip Gen 220 Apt 4 units Apartment - 220 1/4/2007
Intersection Capacity Analysis
p..Xo9983.00XdomXmemos\Attachment.doe
HCM Unsignalized Intersection - Capacity Analysis 2006 -E- xisting -AM
12: Florence & Front
t r u
Peak Hour Factor 0 92 0.92 0.92 0.92 0.92 0.92
Hourly flow
Pedestrians
Walking Speed (ft/s)
RercentBlockage
Right turn flare (veh)
Median
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, confl(6 volume:
vC1. staae 1 conf vol
vCu, unblocked vol 89 263 84
ti
4 - <
tC, 2 stage (s)
p0 queue free % 100 99 98
r r
cM capacity (veh /h) r 3 1506 } 724 976 _ ,.
Volume Left 0 4 5
17nn 15oG 89s
Synchro 6 Report
P: \10006.00 \graphics \BASES\2006 AM.sy7 Page 1
vhb, inc.
G rade 0 0 /0 u% u%
Lane LOS A A
Approach LOS 1... P .
_HCM Unsim alized Intersection Capacity Analysis 2011 Build PM
15: Evergreen & Site Dr
Lane Configurationsi
Grade 0% 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
platoon unblocked
conflieting;uolume
..
i
stage 1 conf vol
stage 2 conf vol w r s r
unblocked vol 9 12 53 47 12 63 45 7
tC, 2 stage (s)
tF s T f 22 22 z A sE! 35 f 40' X3 4 , 0 :'� 3
p0 queue free % 100 100 100 99 99 100 99 100
cM ca acit Leh /h 1 1`607 Y T.> 929 5„ 838 1069' 905 f 840 1075
P: \10006.00 \graphics \BASES\2011 B PM.sy7
vhb, inc.
Synchro 6 Report
Page 1
Uolume F{r ht k a �� h nr
cSH 1611 1607 939 911
Approach LOS A A
I�r1te, J' seG #�OII�.�„urTtm��:�!t�F � _? }� . €��x��>����.. "�,�. r,�:a.. Y ": ..:���6����?Y��v�,.te";a�� }•
HC-M- Unsignalized- Intersection- Capacity Anal-y-s.is 2006 Existin AM
5• Haydenville Rd (Rt 9) & Leonard
A) t
Lane Confiqurations
Grade 0% 0% 0%
Volume (veh/h) :.. " 1.} ., 272 .65,x...`:10 9r 10 a...... ,
Peak Hour IF 0.92 0.92 0.92 0.92 0.92 0.92
1 ..;. 296 707 11 "' 10
Hourly
Pedestrians
Walking Speed (ft/s)
Percent _Blockage_ r�_' , . ,
Right turn flare (veh)
Median type , t
Median storage veh)
Upstream signal'
pX, platoon unblocked
vC, conflctmg,volume
vC1, stage 1 conf vol
vC2,{ stage 2 conf vol ' f
vCu, unblocked vol 717
yq single= (S)I_.. z 4.1r
tC, 2 stage (s)
Lane
1010 712
P: \10006.00 \graphics \BASES\2006 AM.sy7
vhb, inc.
Synchro 6 Report
Page 1
p0 queue free % 100 96
884
cM
Approach LOS C
y� Y ~gym,•
1!1,
a#�a
FICK-Unsignalized-I We rsection-Capacity-An-alyals- 2011 Build PM
Lane Confiqurations
Peak
vCu. unblocked vo|
Queue Length 95th (ft) 3 3 0
Lane LOS B A
SynomSReport
P:\10006.00\onaphina\BASES\2011 8pyW.sy7 Page
vhb, inc.
pO queue free % 90 97 06
cSH 571 1140 1700
Approach LOS B
- HCM- Unsignalized_Inte.rsection Capacity Analy_ais 2006 Existin PM
12: Florence & Front
:v�ae°r i' ,f?�,f}�i`'�j.R, 3,� ��c . ,+, -4 � • -5�• f '_ 3i ..- ....,...- ,.�'° "� r �,' ✓ ti r :'47� ,r � s � '�' �•--`�'tf-frr�,F�1 ���' ��� �m
, r . _ •,.r`�36Yi.�ss r, .,;1„'�: `.,E..,..:�.�.�'L.� .,.e.c_ . >n.,..7.� _ �YS T 9Lei >, .t... - ._srr�a ,. *s _
Lane Confiqurations
Grade 0% 0% 0%
Median storage ve
atoon unblocked
vC1, stage 1 conf vol
vCu unblocked vol 54
1 302 153
1
tC, 2 stage (s)
• t � � , °� r 2' 2 3 5'' `:3 3 4 r `` r� r : ��
tF F
p0 queue free % 99 99 100 c
Volume Left 0 18 4
cSH 1700 1426 773
Volume to Capacity t 0 0 0 01 0 01
Queue Length 95th (ft) 0 1 1
Lane LOS A A
Synchro 6 Report
P: \10006.00 \graphics \BASES\2006 PM.sy7 Page 1
vhb, inc.
Approach LOS A
ura S"�.�.,- f r^a Ar"•x� -'_'_x �+. W R '� .n!.�%r .�"fF�h'i t ^ w rfi*�ii r �ni''"'^5T't shS+ y��
�
?....., „km ..<<,?e...,.., .. u.•.+�.... r ..M ;.� -nrt �fi�.�. rA�.. �is��F �. cF� �» �. an' �: i�.- c? zbr2f�...:r,,��,..:.�!_.u�r.€.i ,.,�.:1"��- 'Sti_.ras., .. v:��'aE ,....,. n_2.�P .�= .s�6S'?.:'.ffi.ifi �t?.'M:1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Porloctrinnc
2011 Build AM
15: Evergreen & Site Dr
Lane Conficiurations 41
~~~~~~^~~~-- -------'' 0.92 0.92 0.92 0.92 0.92 092 0.92
PO queue free % 100 100 100
Volume Left 2 12 0
1605 1687 1007 905
ueueLonqthQ5th(ft) 0 1 1
--- A A A A
Synnhm6Report
PA10006.00\onophica\BASES\2011 BAM.uy7 Page
vhb, inc.
, vCu, unblocked vol 13 12 67 53 12 66 53 12
------ � A /\
I — 1
-HCM- Unsignalized - Intersection- Capacity Analysis uw e mvi
5: Haydenville (Rt 9) & Leonard
t
, platoon unblocked
1, stage 1 conf vol
i inhln( -kari vnl 370 998 367
Volume Left 10 0 8
c H 1189 1700 406
Synchro 6 Report
P: \10006.00 \graphics \BASES\2006 PM.sy7 Page 1
vhb, inc.
Grade 0% 0% u%
Peak Hour Factor 0.92 0.92 0 9� 0 92 0 92 0 92
Hourly flow rate (vgh) 10 612. .. 364 5. , . 8 10 r ,.. ...
Parinstrinns z
cM capacity (veh /h) 118J ,� . ,.,. 7
Approach LOS B
t .a! 'E•'rrt� ^;�t:�P�'��k�xrzr }C ,�, � ��"�yt'° � I '�`"�%,�,�Yzc3- vS " ��r � .� t! ��L *. ',�f�C, a,� ��.'N-" a �.
n /� A
HCM _UnsignaIize_d_Inter_s_ecti_on Capacit_y_Anaty
3 : E Center & Haydenville (Rt 9)
�•T^zn r -rs, F y +� �• err r
Jy[o�ve"�n�n� '.,.�����.;���a E�L�`���EBR����NB �•�?N,B1'� ��SB,��.
Lane Configurations v +T T
Grade 0% 0% 0
.
2011 Build AM
O
" Ir war
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
ans
Volume Left 3 12 0
Volume Might 49 �.... 0
cSH 366 820 1700
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 B AM.sy7 Page 1
vhb, inc.
...r..,.,
vr'i i i inhinnkari vnl 1 1 is snA Rntl
cM ca acct
Approach LOS C
4� a�,� ^r+mz�.c r s. '�2� r •TM'H�t'�n' ."; - F." �, `••rte .....{ r r� ^� � . � �`"tba J � � ,T`4' � _ �.,,�- r....*'�t'�' v'�HS`i $'t� y j_ c } i��''�'y
• p R
1,1,�„G� 524.' �IOJl��� ' &1'� } i_��=r�l� t .�tl {,z w .��ti- �'z"r��.���s.�'y =! >f. #�- o-'�.ar�� u. �..�',�`z" t� .�t...v..a�,t�'.�t���I.r;,._ _`i1�_2
HCM- Unsignalized- Intersection- Capacity - Analysis 2011_NoBuild AM
1 2: Florencd & Front - - -
t
Lane Configurations
Grade 0% 0% 0%
Hour
Volurne.- (veh /h)
Pe .
ak F a 0.92 0.92 0.92 0.92 0.92 0 92
D— Inefrinne
latoon un
1, stage 1 conf vol
i'nhlnr in vnl 97 283 91
Volume Left 0 4
cSl-i 1700 1497 754
Queue Length 95th (ft) 0 0 2
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 NB AM.sy7 Page 1
vhb, inc.
Right turn flare (veh)
g � f
Median storage veh) -_
p0 queue free °/
0 IUU
r � 7
Lane LOS A A
Approach LOS A
�•. �. �i st'T �; � cs .3^ s �7pf2"e T3 ° '�^� �.�i� z v `i rIF "" YY; � .� �^ r rE� � ' � �� #�t a��'.'�.� - t'� i��''��Y r �,i
�:' lle rb'. �,.,,( itLOn `3., ,�.m�...�.�„a. ' r�'. ` :� _..; r�; c rd�' �^�����'�vr��sn,,,� +�aE� �_'�...rt ,. ...:t�.F•_Y.^!�;Y Y..,,. �'. �F', � '��,.�A�r_..!,- ra�+r - v�. s' w�l� .pa"''x'. ,v:!
HCM Unsignalized Intersection Capacity_ Anal 2011 NoBuild PM
1 5: Evergreen & Site Dr
•-. 1� +�^ F ':. r - a 'x'29 s st -' �""_` s "'°a� '>L st
Lane Confiaurations, +T+
Grade 0% 0% 0% 0%
Volume (veh /h) 1; 11 0 5 5 1 0 0 11 1 Qrr'fi
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate
Pedestrians
r V
Median storage veh)
Upstream'signal (ft)
pX, platoon unblocke
uC; conflicting velum
vC1, stage 1 conf vol
unblocked vol 7 12 32 32 12 43 31 6
tC, 2
p0 queue free % 100 100 100 100 99 100 100 100
cM capacity (veh /h) r 1614 1607 t 972 f 858= 1069 946 858 ' 1077
Volume Left 1 5 0 1
Volume Rlghti r M 0L� 1 t 12 `, 1 1 1 zr Y om' T' r J
cSH 1614 1607 1069 1007
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 NB PM.sy7 Page 1
vhb, inc.
Approach LOS A A
sr '•'cararrS aa -a �i t rn Fs tr+ a s �
LE 6� � a
z
�w- �.a_'4�. <:6 �.
HCM-Unsignalized-intersection-C-apac.it-y-An-al-y-alS 2011 NoBuild AM
5: HaVdenville (Rt 9) & Leonard
MY zmvh
-11-�. -"IfAINDI, I
Lane Configurations
Grade 0% 0% 0%
"d e
.. TP
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 ------
H iurly flow W(
01
Paria
toon unblocked
1, stage 1 conf vol
ofume Left 1 0 11
PA1 0006.00\graphics\BASES\201 1 NB AM.sy7
vhb, inc.
Synchro 6 Report
Page 1
Right turn flare (veh)
66
Median storage veh)
of i - i .-I i i . n . hIn r, . L-ori . if . nI 77'3 1088 767
,( w PAP 170n .90.
Approach L C
/ \ I
HCM Unsignal.ized_Intersection Capac tty_ 2011 NoBuild PM
3: E Center & Haydenville (Rt 9)
` t
i
„'7ri,. """ y "r• » � c - 3-' t n sM L '�i � °',� 1 � �' C F � °�T �"�+s� 7 y' �+Yi� jr �1'x" °'�
f `.'•�, a. ������17 s����t�. ..J.kr��,.. r ��"�. � ;.....f'�ck�`1 -.., .tL_ -s.+, �1: ��..,.. rn�. � ..,+) ra.. �s,('+ a. "�t.�s',::f �7�iktN�,r�'S�kSz.:£ �a�.�4�.�'.'.�is.. �'t�#?.Y�
Lane Confiaurations fT T+
Grade 0% 0% 0%
Volumh /h� ; a 1 11 2 =7 618 386 OF
r
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92
Hourly flow rate; v h 1, 12 29 672 420` 0 `" uhf
Pedestrians
Lane Width ft � � m
( i
vC1, stage 1 conf vol
vCu. unblocked vol 1150 420 420
2
p0 queue free % 99 98 97
cM capacity (veh /h) 214 634 11 X40
..r.
Average Delay 0.6
InteYsectiori Capaaty Utilization 64 4 %{Nh ICU Level of Service j � , C,� "y ,
Analysis Period (min) 15
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 NB PM.sy7 Page 1
vhb, inc.
Upstream signal,(ft) 1..... s. l
pX, platoon unblocked
cSH 544 1140 1700
Lane LOS B A
Approach LOS B
HCM_Unsignalized__Lr_
12: Florence & Front
2011 NoBuild PM
t/
Lane Configurations
Sign Control
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
i
Haurly,flow rate {vph) 1.3 . _ ;3 ' 20; 1'21 4.
nne
vC1. stage 1 conf vol
unblocked vol 166 324 165
tC, 2 stage
p0 queue free % 99 99 100 i
60 880 y
Volume Left 0 20 4
cSH 1700 1412 754
Queue Length 95th (ft) 0 1 1
Lane LOS A A
q 'pproach�Delaya {s)...; : -._�_ X ,r.,1; - .: 9�r�8.y_ .,�: .. \Yir. r.-Yo.,7.t.,. 1. ....,�_'.�.. �.. �..rrt... ..'. ? . .. �t ;..' ... r \•.:
Approach LOS A
. d� �, ;� .l..yci4ts��di �. E.��r�i�`:�'�..:u -an ..,> fi. o-{` �. ..^���..7t'f�.,..•rs,Sa�.�Yt�w' 1s�- {� _ ss�x_ ,rc_»•e.. �cl. . r''�:_
Averaae Delav 0.8
Analysis Period (min) 15
•;'
P: \10006.00 \graphics \BASES\2011 NB PM.sy7
vhb, inc.
Synchro 6 Report
Page 1
liCM- Unsignalized- Intersection- Capacit -y- Analysis 2011_NoB_uild -AM
15: Evergreen & Site Dr I
Lane Confiqurations
Grade 0% 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Pedestrians
Median storaqe veh
, platoon unblocked
vC1, stage 1 conf vol
vCu, unblocked vol 12 12 49 48 12 60 48 12
tC, 2 stage (s)
p0 queue free % 100 99 100 100 99 100 100 100
cM,capacity (ueh /h)_ 16074 ,�� � K , 1607 t��, - 94, 5 ,, X1069 _ �920� r � 837 ; � 1069;
proach LOS A A
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 NB AM.sy7 Page 1
vhb, inc.
Volume
cSH 1607 1607 1069 989
n a "�• & I"�' h3X 3"Yn E. b °W ¢
i
HCM- Unsignalized - Intersection- Capacity Analysis
5: Haydenville (Rt 9) & Leonard _
a.xa, �^-� tgrns• rzl�'3F J� � nrtaz y v . ,,€ 1 .2 ° 4 � 3r�"��'',�,ya`L {k aTj - �t"� Sa.
Lane Confiqurations +' T)
:................._ ....
0% 0% 0%
10
Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
A
20 11 NoBuild PM
tC, 2 stage (s)
p0 queue free
99 96 98
cMcapacity (vehlh) x � 1163 ;� r � .;.,,_._ � � . _ _ . r j ,.. _ . _ �.,� _. . _�..<a�,._,._
Volume Left 11 0 9
� Y s c
Volume Right _ A _3_ . 1 '1 F: ., , .. I N ' ,
cSH 1163 1700 371
ueue Length 95th (ft) 1 0 4
Lane LOS A C
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 NB PM.sy7 Page 1
vhb, inc.
vCu, unblocked vol 396 10 394
Approach LOS C
... ,:..Y..u:.«r .,,....�.. ..�..Re.R�+Y "?31�2Mn..rr.tg�} +i.Y41 S.il. ...e);N.Yu�E�..•.:vK'.. ... :�35- cP�...:�h K+ .ex 1..7..,.f...F� l��f�. cat i.4"'.f•''+;5 3
HCM Unsianalized Intersection Capacity Analvsis 2011 NoBuild AM
3: E Center & Haydenville
(Rt 9)
Lane Confiqurations +T T1>
Grade 0% 0% 0%
4
5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Pedestrians
vC1. staae 1 conf vol
vCu, unblocked vol 1132 804 804
Volume Left 3 9 0
V olume
cSH 361 820 1700
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 NB AM.sy7 Page 1
vhb, inc.
pX, platoon unblocked ------
Approach LOS C
I RJR � . ......
1: gg' Tpg-� 7A- g rg - -X.vl T;,
t - I
g t
F7
- �110
-HCM-Unsignalized-intersection-Capacity-Analysis 20-11--RWI-d-MA
12: Florence & Front
t
(I
W ":�, W
MEN -T""wS .00 VR - , V
B RUN 1 �
L a U m &jrTft L RE
i m
Lane Configurations +T
G rade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
vC1, stage 1 conf vol
VCU. unblocked vol 98 286 91
ueue Length 95th (ft) 0 0 3
Lane LOS A A
Synchro 6 Report
P: \10006.00 \graphics \BASES\201 B AM-SY7 Page 1
vhb, inc.
FRO,
DX. r)latoon unblocked
po queue free % 100 97 99
'M
70 2 K, D g
cSH 1700 1495 772
Approach LOS A
aaacity An
s
2006 Existing PM
15: Evergreen & Site Dr
Lane Confi
estrians
ueue Lenqth 95th (ft) 0 0 1 0
P: \10006.00 \graphics \BASES\2006 PM.sy7
vhb, inc.
Synchro 6 Report
Page.1
Grade 0 %p 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
vCu. unblocked vol 7 11 31 30 11 41 30 6
p0 queue free % 100 100 1 uu I uu yy i uu i uu i uu
eM capacity (veh /h)s 1614' 1608 y x „ M ` 973 859 t 1070 950> 859 t 1077
cSH 1614 1608 1070 1010
Lane LOS A A A A
ApproacfDela (s) ��_• �,� 0�7 ..' . , 3 {�' ... 84
y
Approach LOS A A
f rtaxrh d � y r rs,Frgx•. r , --� h^y,�.. �� � 7'�" '5T t'' �*'�' �i i77 ,.s'ti• c �"n �^ ii�
Lane Confi
estrians
ueue Lenqth 95th (ft) 0 0 1 0
P: \10006.00 \graphics \BASES\2006 PM.sy7
vhb, inc.
Synchro 6 Report
Page.1
Grade 0 %p 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
vCu. unblocked vol 7 11 31 30 11 41 30 6
p0 queue free % 100 100 1 uu I uu yy i uu i uu i uu
eM capacity (veh /h)s 1614' 1608 y x „ M ` 973 859 t 1070 950> 859 t 1077
cSH 1614 1608 1070 1010
Lane LOS A A A A
ApproacfDela (s) ��_• �,� 0�7 ..' . , 3 {�' ... 84
y
Approach LOS A A
f rtaxrh d � y r rs,Frgx•. r , --� h^y,�.. �� � 7'�" '5T t'' �*'�' �i i77 ,.s'ti• c �"n �^ ii�
3: E Center & Haydenville (Rt 9)
Lane Configurations v ''
r �
2006 Existinq PM
NBL�NBT{
3 + . � , � �ts�,.._
4 H
Grade 0% 0% 0%
our Factor 0.92 0.92 0.92 0.92 0.92 0.92
, stage 1 conf vol
v(:i i i inhlnrkarl vnl 1 nF7 389 389
Volume Left 1 27 0
Volume - Right 11� $ 0 O
rr
cSH 569 1169 1700
Synchro 6 Report
P: \10006.00 \graphics \BASES\2006 PM.sy7 Page 1
vhb, inc.
Upstream signal (ft) f 4 ' . •... ...' , . ,. . _ .,.' .U...<< . , , _..... J' ... _�. ....`,` .. __.., �' , ... s ;; �., .5 h '1
pX, platoon unblocked
x i et
Approach LOS B
•vn rr-4�•"f s,-= -y -r,�T�r a-"crr.� •�p �° "YU T" F � �i �"' . '3' �n T � mar sT+'r• ,�4 r C
�� , 4 IMETI MI I,
I 1
-- -HC-M- Unsignalized- Intersection- Capacity - Analysis — 2011 -Bui
5: Haydenville (Rt 9) & Leonard
vCu, unblocked vol 774 1088 767
tC, 2 stage (s)
35 33
p0 queue free% 100 95 97
cM capacity
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 B AM.sy7 Page 1
vhb, inc.
Grade 0% 0% 0%
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
H °ourly #low 761
F
Pedestrians
` 1088 76
vC1. stage 1 conf vol
volume Righft 0 4 313 1'2� _ ..
r.q H 842 1700 296
Ap
:;
Approach LOS C {
-n �._xr^ ^[w•r ..rn a ,nrr-sxx�oe 'C' d� -���� �,s t ' � �ia�, ,�r ..'-�qin • ^:+r•.� i.�, .•r �r� 4n s�'�auE+��
lnterssc'tifl�S .. � ! 1.�.•�e�w . :t�, v.) . YI" Ei�+ �. u�i'. A. �' ���. ��+. 5�,^, ��Aa: �� �� .�`'r�. `�..z�i�,����� - �= 2 ,+E � .��"z'7.:....*� . r �
i
HCM_UnsignaIized_Inter_secti_on Capamity Anal 2006 Existin AM
1 5: Evergreen & Site Dr
� MY
IBM '
Vloy ent n � tE EBT ,,=EBR W1 �.. WBT B.? Nt� BT�:��NBR���.�;
Lane Configurations 4+ __ E .. -_ ... ..
Grade 0% 0 O
_.. ...,..,.
O
Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
vC1, stage 1 conf vol
v®2, stage 2 conf col t a .. `
r
vCu, unblocked vol 11 11 23 22 11 33 22. 11
tC, 2 stage (s)
tF?ts).Y..� .. ., •w,'r...:. ....22a....' ?� ; =` 35 ''::40_ x 33 `;. 3�5' 40,E S 33
p0 queue free % 100 100 100 100 99 100 100 100
Volume Left 0 0 0 1
.. ...... ... ..r:. .. r.i ...r_ • -..S .: i... tit � .�L.. ... ... ...f .. .. .. ..._ ..y .. � �... ��
cSH 1608 1608 1070 1015
e Lenqth 95th (ft) 0 0 1 0
Synchro 6 Report
P: \10006.00 \graphics \BASES\2006 AM.sy7 Page 1
vhb, inc.
Upstream signal (ft) � t ; ;� -;' , , - '• � r, -� _ .. .. „ . . , . �<� �, � .. ..., .a. ,. ,. �_� ".. � ._ ..
pX, platoon unblocked
Lane LOS A A
Approach LOS A A
.w 1 : M i + ��
.r .a ":7 r ✓a. F'*: d T „1 r� x ". k ' .
-" HCM - Unsi 9 nalized- Intersection- C- apacity- Analysis 2011_Build -P_M
- 12: Florence & Front
Walki
IN turn flare (veh)
S 1 4
dean type � r }
-dian storage veh)
stream signal_ (ft)
platoon unblockE
conflicting yolun
1, stage 1 conf vo
Queue Length 95th (ft) 0 1 1
Lane LOS A A s
Approach Delay {s) k 0 0 ' 1 '4 r 9:81 ' . s " '... '
_R�
App roach LOS A on S ��„ _. rH�4rt. � r�s„� ?4At f�t .. .U! �. .h ,'ttG •r�'.c: r, *w. 3_�. a.. �7 e., 1 ' �,�` . ,•�ni „�.r' �
Synchro 6 Report
PA10006.00 \graphics \BASES\2011 B PM.sy7 Page 1
vhb, inc.
.. _ 1AR 334 166
p0 queue free % Ub yy yy
cM capacity
(V
MIA
_. ,r....... ,,.
7 . •t.. !I t! Y It!,< "",'- pFI Z- .. -+-- -� ^ '4j !� ef�1 -e`2. � 'f' ,}a• �:Fi
Lane Configurations
Sign Control Free Free'
St P x....,,'. , ........r...zf...? ,.
Grade 0% 0%
0%
Volume
Peak Hour Factor 0.92 0.92 0.92 0.92
0 92 0 92
Walki
IN turn flare (veh)
S 1 4
dean type � r }
-dian storage veh)
stream signal_ (ft)
platoon unblockE
conflicting yolun
1, stage 1 conf vo
Queue Length 95th (ft) 0 1 1
Lane LOS A A s
Approach Delay {s) k 0 0 ' 1 '4 r 9:81 ' . s " '... '
_R�
App roach LOS A on S ��„ _. rH�4rt. � r�s„� ?4At f�t .. .U! �. .h ,'ttG •r�'.c: r, *w. 3_�. a.. �7 e., 1 ' �,�` . ,•�ni „�.r' �
Synchro 6 Report
PA10006.00 \graphics \BASES\2011 B PM.sy7 Page 1
vhb, inc.
.. _ 1AR 334 166
p0 queue free % Ub yy yy
cM capacity
(V
MIA
_. ,r....... ,,.
20 06 Existing AM
HCM- Unsignalized - Intersection- Capacity Analysis
3' E Center St & Hayden Rd (Rt 9 )
_ I
t
r �B_ �LR;N'gNBT�SB�SuB` hE,zF at 1r17La�. , '.
3�2;s � 7#�Ap I,'�� t� .a4�! °`nz s � 1 � ' x
Lane Configurations '�' � �'
Stop;'
'Free 'Free
, , .... .. ,.
0% 0% 0%
Grade - s f�
Voaume' ueh /h ;; 3;;: > 31
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 a
Walking Speed (ft s
Percent Blockage
Flight turn flare (veh)
Median type ';,,
Median storage veh)
Upstream signal(ft) „`
pX, platoon unblocked
uC, conflicting volume
vC1, stage 1 conf Vol
Lane LU
Approac
Approac
Average
g 8 0
0 862 1700
Synchro 6 Report
P: \10006.00 \graphics \BASES\2006 AM.sy7
Page 1
vhb, inc.
00 aueue free % UV
— HCM -- Unsignalized -- Intersection C apacit - y - Analysis 2011 _B . uild_P_ M _
5: Haydenville (Rt 9) & Leonard
[1 �r2 L� Ott ��tr SBT'SBRa c 3�
jV1,oVeme
k '
Lane Configurationsy
unblocked vol 398 1076 395
tC, 2 stage (s) r .
p0 queue free % 99
96 98
cM capacity X, 96
7 1161 .. ?,
volume Left 11 0 10
1161 1700 361
Queue Length 95th (ft) 1 0 5
Lane LOS A C
Synchro 6 Report
P: \10006.00 \graphics \BASES\2011 B PM.sy7 Page 1
vhb, inc.
O % 0%
Grade oo
volume veh /h) 10 606 ` 3
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Hourly flow rate_(vph)° - _ .11' 659
D nAmetrinne
A pP roach LOS C
jn'ti��se��ir �j�u�►��a����� °. ��r ' ,�t ' ' :r ' �� �� �� ��..u�.:d:,»..,4��k��? , � 1 y ` _� i� ' �ac�,T��� 2 s 4 � tJ+tf ;ta: •. �i'�,`� - ��� -"`?'
®® Public Transportation
P % o9983 .o01docslmemoslAtlachment.doo
v
i a Williamsburg Library
tom' Williamsburg Center I 5
to s
Nash WILLIAMSBURG I HATFIELD
a! Hill �`'
sr I
t:� I
Haydenville
91
DN7
Leeds bnnectic
VA Hospital G,� a
i
Service to Leeds Center = F
inbound to Northampton
only. Outbound trips will
serve Leeds Center by
request.
NORTHAMPTON
li
NOflTH 1/2 � 1 Mile
n I-I6spital
High School
Peter Pan Bus TEirmiiialw
Walter Salvo�Housea
66 1�R4'1
RED
IV®rthamptan/
Wi//eamshurg
PVTA Route RED 42
Connecting Route
• Major Bus Stop
I WANT TO JOIN THE TIRANSIT CLUB!
PLEASE SEND ME THE PASSES INDICATED BELOW:
® Elderly & Persons with Disabilities Pass - $18.00 /month
® Regular Pass - $36.00 /month
® Ticket Pack - $9.00 /ten rides
Name
Address
City, State, Zip Phone
CONFIDENTIAL PVTA OFFICE USE ONLY
❑ Check enclosed for month of: Please make check payable to PVTA.
Mail to: PVTA Information Center
1776 Main Street, Springfleld, MA 01103
RED WEEKDAY
Effective -
NORTHAMPTON/WILLIAMSBURG Sep206er3,
LEAVE
NORTHAMPTON
COURTHOUSE
V.A. HOSPITAL
WILLIAMSBURG
CENTER
V.A. HOSPITAL
SMITH COLLEGE
WALTER SALVO
H U
ARRIVE
NORTHAMPTON
COURTHOUSE
- --
- --
- --
- --
- --
6:00 G
6:05
6:05
6:15
6:30
6:45
6:55
7:00
7:05
7:05
7:15
7:30
7:45
7:55
8:00
8:05
8:05
8:15
8:30
8:45
8:55
9:00
9:05
- --
;9.15 .:.
9:90
9:45-
9:55`
10.00,`.:
10:05
12:05
12:15
12:30
12:45
12:55
10:30
10:35
10:35
10:45
10:45
10:55
11:00
11:05 CG
2:05
2:15
2:30
2:45
2:55
1240,G';=
`12:45''
12:45
12:55
1:10
1:25
1:35
1:40
1:45
4:00
4:10
4:25
4:40
4:50
2:20
2:25
2:25
2:40
2:55
3:10
3:20
3:25
3:35
6:15
5
6:40
6:50
4.
7:05
4.45.:. :
4:45
5:00
5:15
5:30
5:40
5:45
5:55
5:55
6:05
6:20
6:35
6:45
6 :50
6:55
6:55
7:05
7:20
7:35
7:45
7:50
7:55 CG
RED SATURDAY
42 Effective
NORTHAMPTON /WILLIAMSBURG Sep206er3,
LEAVE
NORTHAMPTON
COURTHOUSE
V.A. HOSPITAL
WILLIAMSBURG
CENTER
V.A. HOSPITAL
SMITH COLLEGE
WALTER SALVO
HOUSE
ARRIVE
NORTHAMPTON
COURTHOUSE
- --
- --
- --
- --
- --
7:00
7:05
7:05
7:15
7:30
7:45
7:55
8:00
8:05
8:05
8:15
8:30
8:45
8:55
9:00
9:05
,._.9:15.._.,
9:30.
9.45:, ..,
.:.'. 9.56 1:'..
.. ,Y0.00.*
10:05.CG ,
- --
- --
- --
- --
- --
12:00
12:05
12:05
12:15
12:30
12:45
12:55
1:00
1:05
Y G
z2
2:05
2:15
2:30
2:45
2:55
3:00
3:05 CG
--
-
- --
- --
- --
3:50
4:00
4:00
4:10
4:25
4:40
4:50
4:55
5:05
.A.,.. 5.15 ,._ . _;
-
5.3Q ..,..
?.. 5 45,,. F
- 5 55._ ...
,.__ :6.05._.., r...
.,
.,_ 6:15....
6:15
6:25
6:40
6:50
7:00
7:05
7:10 CG'
C - bus stops on King St. at Calvin Theatre (not Courthouse) Service to Leeds Center inbound to Northampton only.
G - to PVTA Garage at 54 Industrial Drive, Northampton Outbound trips will serve Leeds Center by request to driver.
l nps service Nash Hiq by request For pick up caJj586 3548 Far drop off speak to-bus
New Year's Day
Now you can purchase your PVTA
Martin Luther King Day
monthly bus pass by mail.
Memorial Day
Call 781 -PVTA
Independence Day
for more information or
Labor Day
mail in order form on
Columbus Day
reverse side of schedule.
Veterans Day
Thanksgiving
Christmas Day
. i > r i �
Pioneer Valley Transit Authority
ROUTE INFORMATION
Due to traffic and weather conditions, times are subject to change
Fares:
Elderly and Persons with Disabilities and Medicare card holders are eligible for 1 /2 fare when they show a PVTA E &D identification card available
at the Information Center.
Elderly & Persons with Disabilities (with PVTA ID) 50 -cents
Regular Cash Fare $1.00
Children 6 -12 years 75 -cents
Children 5 years and under FREE
Regular and Children's Transfer 25 -cents
Elderly & Persons with Disabilities Transfer 10 -cents (with PVTA E &D identification card)
Types of Bus Passes:
Elderly & Persons with Disabilities ($18 /month) • Regular Pass ($36 /month)
PVTA Information Center:
Services offered include identification cards for elderly, persons with disabilities and Medicate cardholders, bus tokens and monthly passes. The
office is located at 1776 Main Street at the Springfield Bus Terminal. Schedule and fare information is available by calling 781 -PVTA or 586 -5806.
Transfers
PVTA's routes are designed to create a network so that by transferring from one bus to another you can reach your destination. If you are going to
transfer, purchase a transfer from the operator at the time you pay your fare. Transfers are good only until the latest time shown, and never for a
round -trip or stopover.