Loading...
22D-031 (2) @CET j � J '1't'cl„,oit}};v' � � / ( / f - / t —/ www.cetonline.org MID Construction Performance Testing Documentation Date of Test 11/28/2011 Builder /Homeowner Thomas Malone, builder Address 128 Ryan Rd Florence MA Test completed by Beth Paulson Test Information Conditioned Floor Area 2419 _sq ft Number of Stories [ 2 _J Duct System 1 Duct System 2 (if installed Air Handler Installed? no Air Handler Installed? I 0 Duct Flow in CFM25 84 Duct Flow in CFM25 0 Pass or Fail? L_ pass Pass or Fail? 0 RESULTS of Rough -In Duct Leakage Test Rough In Total Leakage Test at 25 Pascals Total Leakage Test 3.47ICFM per 100 sq ft of conditioned floor area Notes on Area Tested and /or Testing Conditions: rough -in duct test without air handler; send report and invoice to Tom via email 2009 IECC Minimum Requirements Rough In Test with Air Handler Installed < 6 CFM per 100 sq ft of conditioned floor area Rough In Test with NO Air Handler Installed < 4 CFM per 100 sq ft of conditioned floor area Questions about this Report? Contact Megan McDonough - Phone: 413 - 586 -7350 x221 - E -Mail: MeganM @cetonline.org