MID Construction Performance Testing Documentation
Date of Test 11/28/2011
Builder /Homeowner Thomas Malone, builder
Address 128 Ryan Rd Florence MA
Test completed by Beth Paulson
Test Information
Conditioned Floor Area 2419 _sq ft Number of Stories [ 2 _J
Duct System 1 Duct System 2 (if installed
Air Handler Installed? no Air Handler Installed? I 0
Duct Flow in CFM25 84 Duct Flow in CFM25 0
Pass or Fail? L_ pass Pass or Fail? 0
RESULTS of Rough -In Duct Leakage Test
Rough In Total Leakage Test at 25 Pascals
Total Leakage Test 3.47ICFM per 100 sq ft of conditioned floor area
Notes on Area Tested and /or Testing Conditions:
rough -in duct test without air handler; send report and invoice to Tom via email
2009 IECC Minimum Requirements
Rough In Test with Air Handler Installed < 6 CFM per 100 sq ft of conditioned floor area
Rough In Test with NO Air Handler Installed < 4 CFM per 100 sq ft of conditioned floor area
Questions about this Report?
Contact Megan McDonough - Phone: 413 - 586 -7350 x221 - E -Mail: MeganM @cetonline.org