Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
42-062
BP- 2010 -0510 GIs #: COMMONWEALTH OF MASSACHUSETTS CITY OF NORTHAMPTON I ,ot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Cates,ory_ BUILDING PERMIT Permit # BP- 2010 -0510 Project # JS- 2010 - 000709 Est. Cost: $2000.00 Fec: $35.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq. ft.): 15202.44 Owner: MOFFETT JOSEPH J SR & BARBARA Zoning: SR(100) / /WSP I1 Applicant: MOFFETT JOSEPH J SR & BARBARA AT. 15 GLENDALE RD Applicant Address: Phone: Insurance: 15 GLENDALE RD (413) 586 -2909 (� FLORENCEMA01062 ISSUED ON. 111912009 0:00:00 TO PERFORM THE FOLLOWING WORK.-SHINGLE ROOF OVER 1 LAYER POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector 1 Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature FeeType: Date Paid: Amount: Building 11/9/2009 0:00:00 $35.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Building Commissioner - Anthony Patillo City of Northamptonerrrij� Building Department Cta gyp' - 212 Main Street sAvtt `rte Room 100 . 'r ✓ :3. cl -) j Northampton, MA 01060 phone 413- 587 -1240 Fax 413 - 587 -12721 fie.... a APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION I.- SITE INFORMATION This section to be completed by office 1 Property Address Map Lot Unit Zone Overlay District "'Elm St"District CB District SECTION! 2 - PROPERTY' OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record ;N7ae (Print) � Cunent Mailing Address: �c2 Lo t— /� . /'� �� /- Telephone Signature 2.2 Authorized Agent: Name (Print) Current Mailing Address: Signature Telephone SECTION 3 - ESTIMATED!CONSTRUCTION COSTS Item Estimated Cost (Dollars) to be Official Use Only completed by ermit applicant Building (a) Building Permit Fee r 2. Electrical (b) Estimated Total Costo€ Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total = (1 + 2 + 3 + 4 + 5) Check Number �!}° This Section For Official Use Onl Date Building Permit Number. Issued: Signature: Building Commissioner /Inspector of Buildings Date J Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size _ ._.__._ ....._... Frontage Setbacks Front P Side L: R L _ . R M_ Rear l �" Building Height Bldg. Square Footage '" """m " °'') OX Open Space Footage % (Lot area minus bldg & paved p arking) # of Parking Spaces Fill: (volume & Location).,._...__ A. Has a Special Permit /Variance /Finding ever been issued for /on the site? NO 0 DONT KNOW 0 YES IF YES, date issue&: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW 0 YES 0 IF YES: enter Book � Page! Document # B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are tyre any propose c anges - td -& a rtlons o signs intendedfor the property ? YES 0 NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing El Or Doors Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [C] Siding [0] Other [a of Description of Proposed Work: k� - 44IL&LZ e — Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll - Sheet ta. tf Neiu.house ar" rd' �or` aadrtlori' to. seieisf��ctuta' ousing ,.comszle #e- the.fol�tirir�c#: a. Use of building: One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction L Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a.- OWNER AUTHORIZATION!; - TO BE COMPLETED ;WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR DUILDING PERMIT as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date as Owner /Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. P ' t Name l _ Signature of Owner /Agent a , , Date /% r SECTION 8 - CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor Not Applicable ❑ Name of License Holder License Number Address Expiration Date Signature Telephone 9.,:Re. -red,f ame Ira 'r. ©veraier�t Coritractor: , r ;, ,. Not Applicable ❑ Company Name Registration Number Address Expiration Date Telephone SECTION 10- WORKERS COMPENSATION WSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ W Q _The_current_exemption for_ "homeowners ",was extended to include Owner-occupied Dwellings of one (1) or two(2) families and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts as supervisor. CAM 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner Person (s) who own a parcel of land on which he /she resides or intends to reside, on which there is, ut is itacaded to lie, a one or two family dwelling, attached or detached structures accessory to simh Ilse anti/ or farm structures. A person who constructs more than one home in a two -year period shall not be conside a homeowner. Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official that he /she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference'to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of s-General -Laws Annotated Northampton r tnances,. - a e - Homeowner Signature The Commonwealth of Massachusetts Department oflndustrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov /dia - Workers' Compensation Insurance Affidavit: Builders / Contractors /Electricians/Plumbers Applicant Information Please Print Legibly Name ( Business /Organintion/IndividuaI): Address: City /State/Zip: Phone. #: Are you an employer? Check the appropriate box: Type of project (required): 1. ❑ I am a employer with 4.. E] I am a general contractor and I employees (full and/or part-time). * have hired the sub- contractors 6. ❑ New construction 2. ❑ I am a sole proprietor or partner - listed on the attached sheet. 7. Remodeling ship and have no em ployees These sub - contractors have g_ Demolition working for me is any capacity. employees and have workers' 9. Butt � ' addition [No work � workers' comp. insurance comp...ins Q required -] 5. We are a corporation and its 10.0 Electrical repairs or additions cersa vexer c� _tlaei� _ 3� I am -a �iomee�vner�ieia ¢�1�vc�Ic - - - - - -- - - -- - �- 1?lumb�g -repairs or additions myself. [No workers' comp_ right of exemption per MGL 12.F Roof repairs insuran required.] t c. 152, § 1(4), and we have no employees. [No workers' 13.❑ Other comp. insurance required.] `Any applicant that checks box #1 :mist also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit. indicating they are doingal] work and then hire outside contractors trust submit a new affidavit indicating such. Tcontractors that check this box must.attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees they must .provide their workers' comp..policy number. lam an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site formation. Insurance Company Name: Policy # or Self-ins. Lic. #: Expiration Date: Job Site Address: City /Stafe/Zp: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage_ as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one. -year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fire of up to $250.00 a day against the violator: lye advised that a copy of this statement maybe forwarded to the Off'ii;P of Investigations of the MA for insurance coveraze verification I d _ ereby certify under thepains and penalties ofperjury that the iazfornta on.provided above_iytrue_audcvrrect___ i tare: � � ate• 1 - O �' Phone #: T�> Official use only. Do not wrrte ui this area, to be completed?y ciiy or town official City or Town- Permit/License # Issuing Authority (circle one): I - Board of Health 2. Building Department 3. City/Town Clerk 4. Electrica Inspector 5. Plumbing Inspector __._. 6. Other Contact Person: Phone #: r HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two -year period shall not be considered a home owner." The building department for the City of Northampton wants person(s) who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and rep lat_ions The inspection Droc��q�ires that the building department be calle inspect work at various stages, which include foundation /footings (before backfill), sonotube holes (before your), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secu -re these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper _- _— _---- ___pej-- nuts.i. con} unction_to_the_huildingTermit - issued,.- and_that they get their required inspections. Failure of the individual trades to secure, the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made �` l i understand the above. V .(Home owner /reside0i /reside signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Address of work location