Loading...
KE -Fireflow Report - Hydrant Flow Test Job Number: Date: 1-Jun-11 By: BCD Location: Westhampton Road, Northampton, MA HYDRANT FLOW TEST NUMBER 1 Location, Test Hydrant: See Sketch, Hydrant #1A Location, residual Hydrant: See Sketch, NHWydrant #1B Test time: From 4:30 a.m. To 5:00 a.m. Flow Pressure, Test hydrant: 12 PSI Converted Test Hydrant Flow (QF): 580 GPM Static Pressure, Residual hydrant (PS): 42 PSI Residual Pressure, Residual Hydrant (PR): 22 PSI . Calculated Available flow @20 PSI Residual Pressure (QR): QR = QF[(PS-20)/(PS-PR)] 0.54 Available Flow @20 PSI Residual: 611 GPM Comments: Test performed by Northampton Water Department and Brian Darnold of The Design Group, Inc. Berkshire Page 1 Berkshire Design. Flow rate briefly spiked to 630GPM and stabalized at 580GPM. Hydrant Flow Test Job Number: Date: 1-Jun-11 By: BCD Location: Glendale Road, Northampton, MA HYDRANT FLOW TEST NUMBER 2 Location, Test Hydrant: See Sketch, Hydrant #2A Location, residual Hydrant: See Sketch, NHWydrant #2B Test time: From 5:00 a.m. To 5:30 a.m. Flow Pressure, Test hydrant: 16 PSI Converted Test Hydrant Flow (QF): 670 GPM Static Pressure, residual hydrant (PS): 45 PSI Residual Pressure, Residual Hydrant (PR): 25 PSI . Calculated Available flow @20 PSI Residual Pressure (QR): QR = QF[(PS-20)/(PS-PR)] 0.54 Available Flow @20 PSI Residual: 756 GPM Comments: Test performed by Northampton Water Department and Brian Darnold of The Design Group, Inc. Berkshire Page 1 Berkshire Design. Flow rate measured read 670 gpm.