Loading...
PermitApplication_Fairway Village CondominiumPermit Application Todav's Date- 05/24/2011 Owner Applicant Fairway Village Condominium Kohl Construction, Inc. 455 Spring Street 31 Campus Plaza Road Hadley, Massachusetts 01035 Leeds, Massachusetts 01063 413 - 256 -0321 glm @kohl construction. com City of Northampton department: No Work Location Information How many lots involved in the project: 1 Map/ Block Lots of all lots in project: IOD -30 Deed Book of all lots in project: 0000 -000 Project work address: 455 Spring Street City / State / Zip: Leeds 01053 Zoning District: URA/WP Application for following Permit Types ❑ Planning Bd. Special Permit w/ Site Plan ❑ Planning Bd. Special Permit w/ MAJOR Site Plan NO Special Permit ❑ Planning Bd. Major Site Plan Approval (No Special Permit), including 40R projects ❑ Subdivision Preliminary ❑ Planning Bd. Special Permit w/ Site Plan for flag lots ❑ Planning Bd. Site Plan (NO Special Permit) ❑ Approval Not Required Plans ❑ Subdivision Definitive with Preliminary Approved ❑ Subdivision Definitive with no Preliminary Approved ❑ Zoning Board Special Permit ❑ Appeal of Building Commissioner - Zoning ❑ Variance ❑ Historic District (Elm St) Determination of Appropriateness ❑ Wetlands Notice of Intent IF state wetlands Wetlands Request for Determination OR Resource Delineation ❑ Wetlands Certificate of Compliance reauest ❑ Subdivision Definitive Amendment ❑ Zoning Board Finding ❑ Comprehensive Permit (40B) ❑ Demolition (Demolition Delav) ❑ Central Business Architecture ❑ Wetlands Notice of Intent IF ONLY local wetlands ❑ Wetlands Amendment or extension 210 Main St., Rm. 11, City Hall, Northampton, MA 01060 (413) 587 -1262 Fee Information Wetlands Request for Determination OR Resource Delineation $125 (WPA form 1 or 4a) - $125 Total Fee Amount: $125.00 Existing Use Residential /Condominiums Planned Use Use will be the same; this Request is for repaving within the same footprint all roadways, driveways and sidewalks within the complex. Detailed Project Information Wetlands Description: This Request for Determination is for repaving within the same footprint all roadways, driveways and sidewalks within the complex. A portion of the work falls within Riverfront Area, but an NOI is not required based on 10.58(6)(a) of the WPA. Files Uploaded: Supporting Information: Fairway Village DEP wetlands.pdf Plan Sheets: FAIRWAY VILLAGE RDA plan 2011- 05- 19.pdf Wetlands Information: Fairway Village repaving RDA.pdf By typing my name in the signature box, I certify that all the information above is accurate to the best of my knowledge, I am the property owner or have permission from the property owner to apply for this permit. I also grant permission to the City of Northampton to inspect the proposed work Signature: Gloria McPherson Date Signed: 05/24/2011 210 Main St., Rm. 11, City Hall, Northampton, MA 01060 (413) 587 -1262