PermitApplication_Fairway Village CondominiumPermit Application
Todav's Date- 05/24/2011
Owner
Applicant
Fairway Village Condominium
Kohl Construction, Inc.
455 Spring Street
31 Campus Plaza Road
Hadley, Massachusetts 01035
Leeds, Massachusetts 01063
413 - 256 -0321
glm @kohl construction. com
City of Northampton department: No
Work Location Information
How many lots involved in the project: 1
Map/ Block Lots of all lots in project: IOD -30
Deed Book of all lots in project: 0000 -000
Project work address: 455 Spring Street
City / State / Zip: Leeds 01053
Zoning District: URA/WP
Application for following Permit Types
❑ Planning Bd. Special Permit w/ Site Plan
❑ Planning Bd. Special Permit w/
MAJOR Site Plan NO Special Permit
❑ Planning Bd. Major Site Plan Approval (No
Special Permit), including 40R projects
❑ Subdivision Preliminary
❑ Planning Bd. Special Permit w/ Site Plan for flag
lots
❑ Planning Bd. Site Plan (NO Special Permit)
❑ Approval Not Required Plans
❑ Subdivision Definitive with Preliminary Approved
❑ Subdivision Definitive with no Preliminary
Approved
❑ Zoning Board Special Permit
❑ Appeal of Building Commissioner - Zoning
❑ Variance
❑ Historic District (Elm St) Determination of
Appropriateness
❑ Wetlands Notice of Intent IF state wetlands
Wetlands Request for Determination OR
Resource Delineation
❑ Wetlands Certificate of Compliance
reauest
❑ Subdivision Definitive Amendment
❑ Zoning Board Finding
❑ Comprehensive Permit (40B)
❑ Demolition (Demolition
Delav)
❑ Central Business Architecture
❑ Wetlands Notice of Intent IF ONLY local
wetlands
❑ Wetlands Amendment or
extension
210 Main St., Rm. 11, City Hall, Northampton, MA 01060
(413) 587 -1262
Fee Information
Wetlands Request for Determination OR Resource Delineation $125
(WPA form 1 or 4a) - $125
Total Fee Amount:
$125.00
Existing Use
Residential /Condominiums
Planned Use
Use will be the same; this Request is for repaving within the same footprint all roadways, driveways and
sidewalks within the complex.
Detailed Project Information
Wetlands Description: This Request for Determination is for repaving within the same footprint all
roadways, driveways and sidewalks within the complex. A portion of the work falls within Riverfront
Area, but an NOI is not required based on 10.58(6)(a) of the WPA.
Files Uploaded:
Supporting Information: Fairway Village DEP wetlands.pdf
Plan Sheets: FAIRWAY VILLAGE RDA plan 2011- 05- 19.pdf
Wetlands Information: Fairway Village repaving RDA.pdf
By typing my name in the signature box, I certify that all the information above is accurate to the best of my
knowledge, I am the property owner or have permission from the property owner to apply for this permit. I also
grant permission to the City of Northampton to inspect the proposed work
Signature: Gloria McPherson Date Signed: 05/24/2011
210 Main St., Rm. 11, City Hall, Northampton, MA 01060
(413) 587 -1262