Loading...
6 Oaks Cost to Complete Phases THE OAKS -COST TO COMPLETE Phase 1 Paving $31,285.00 Granite Curbs at Emergency Exit $1,680 Bus Shelter $6,000.00 62 Street Trees $18,600.00 Street Sign $200.00 Record Plan $2,500.00 Phase 1 Total $60,265.00 20% Contingency $12,053.00 Phase 1 Grand Total $72,318.00 Phase 2 Paving $19,746.00 30 Street Trees $9,000.00 Record Plan $1,000.00 Phase 2 Total $29,746.00 20% Contingency $5,949.20 Phase 2 Grand Total $35,695.20 Phase 3 Balance of Dietz Construction Contract (includes inspections) $130,700.00 Paving $105,247.00 Granite Curbs at Loop Road $2,280 83 Street Trees $24,900.00 Bike Path Signage $600.00 Record Plan $3,000.00 Phase 3 Total $266,727.00 20% Contingency $53,345.40 Phase 3 Grand Totat $320,072.40