Loading...
NEW North Norwottuck NOI Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP: DEP File Number Document Transaction Number          City/Town  Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.  Note: Before completing this form consult your local Conservation Commission regarding any municipal bylaw or ordinance. A. General Information   1. Project Location (Note: electronic filers will click on button for GIS locator):   Florence Street and former railroad ROW to Northampton/Williamsburg town line a. Street Address Northampton b. City/Town 01060 c. Zip Code   Latitude and Longitude:       d. Latitude       e. Longitude   05 f. Assessors Map/Plat Number 34 g. Parcel /Lot Number   2. Applicant:   Wayne a. First Name Feiden b. Last Name City of Northampton c. Company   210 Main Street City Hall d. Mailing Address   Northampton e. City/Town  MA f. State 01060 g. Zip Code    413-587-1365 h. Phone Number 413-587-1264 i. Fax Number  wfeiden@northamptonma.gov j. Email address   3. Property owner (if different from applicant):   Check if more than one owner         a. First Name       b. Last Name       c. Company         d. Mailing Address         e. City/Town        f. State       g. Zip Code          h. Phone Number       i. Fax Number        j. Email address   4. Representative (if any):         a. Firm         b. Contact Person First Name       c. Contact Person Last Name         d. Mailing Address         e. City/Town       f. State       g. Zip Code          h. Phone Number       i. Fax Number       j. Email address   5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):   Exempt City of Northampton a. Total Fee Paid       b. State Fee Paid       c. City/Town Fee Paid   6. General Project Description:   See attached narrative      A. General Information (continued)   7. Project Type Checklist:    a.  Single Family Home  b.  Residential Subdivision    c.  Limited Project Driveway Crossing  d.  Commercial/Industrial    e.  Dock/Pier f.  Utilities    g.  Coastal Engineering Structure  h.  Agriculture – cranberries, forestry    i.  Transportation  j.  Other       8. Property recorded at the Registry of Deeds for:   Hampshire a. County 46 b. Page Number   8314 c. Book       d. Certificate # (if registered land)      9. Has work been performed on the property under an Order of Resource Area Delineation involving Simplified Review within 3 years of the date of this application?   a.  Yes b.  No    If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the 50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of Compliance, whichever is later.         10. Buffer Zone Only - Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal resource area? a.  Yes - answer 11 below, then skip to Section C. b.  No - skip to Section B.            11. Buffer Zone Setback – For projects that involve work only in the buffer zone, select the applicable adjacent resource area (check one): a.  BVW b.  inland bank c.  coastal resource area      The distance between the closest project disturbance and the associated resource area is:         d. linear feet         B. Resource Area Effects   1. Inland Resource Areas   Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.     Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. Resource Area Size of Proposed Alteration Proposed Replacement (if any)   a.  Bank       1. linear feet       2. linear feet   b.  Bordering Vegetated Wetland       1. square feet       2. square feet   c.  Land Under Waterbodies and Waterways       1. square feet       2. square feet          3. cubic yards dredged    d.  Bordering Land Subject to Flooding       1. square feet       2. square feet          3. cubic feet of flood storage lost       4. cubic feet of flood storage replaced   e.  Isolated Land Subject to Flooding       1. square feet           2. cubic feet of flood storage lost       3. cubic feet of flood storage replaced   For projects impacted by the riverfront area and a buffer zone of another resource area, add 50% to the total fee. f.  Riverfront area Mill River 1. Name of Waterway (if available)    1. Width of Riverfront Area (check one):     25 ft. - Designated Densely Developed Areas only  100 ft. - New agricultural projects only  200 ft. - All other projects          2. Total area of Riverfront Area on the site of the proposed project:  114,820 Square Feet    3. Proposed alteration of the Riverfront Area:   80,000 a. Total Square Feet 30,000 b. Square Feet within 100 ft. 50,000 c. Square Feet between 100 ft. and 200 ft.    4. Has an alternatives analysis been done and is it attached to this NOI?  Yes  No    5. Was the lot where the activity is proposed created prior to August 1, 1996?  Yes  No               B. Resource Area Effects   2. Coastal Resource Areas:   Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.     Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. Resource Area Size of Proposed Alteration Proposed Replacement (if any)   a.  Designated Port Areas Indicate size under Land Under the Ocean, below   b.  Land Under the Ocean       1. Square feet           2. Cubic yards dredged    c.  Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below   d.  Coastal Beaches       1. Square feet       2. Cubic yards beach nourishment   e.  Coastal Dunes       1. Square feet       2. Cubic yards dune nourishment   f.  Coastal Banks       1. Linear feet    g.  Rocky Intertidal Shores       1. Square feet    h.  Salt Marshes       1. Square feet       2. Sq ft restoration, rehab., or creation   i.  Land Under Salt Ponds       1. Square feet           2. Cubic yards dredged    j.  Land Containing Shellfish       1. Square feet       2. Square feet restoration, rehab.    k.  Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above              1. Cubic yards dredged     l.  Land Subject to Coastal Storm Flowage       1. Square feet       3. Limited Project:    Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53?    a.  Yes  No If yes, describe which limited project applies to this project:   10.53 (6) b. Limited Project   C. Bordering Vegetated Wetland Delineation Methodology   Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:  Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. 1.  Final Order of Resource Area Delineation issued by Conservation Commission or DEP (attached)   2.  DEP BVW Field Data Form (attached)   3.  Final Determination of Applicability issued by Conservation Commission or DEP (attached)   4.  Other Methods for Determining the BVW Boundary (attach documentation):    a.  50% or more wetland indicator plants    b.  Saturated/inundated conditions exist    c.  Groundwater indicators    d.  Direct observation  For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was delineated.  e.  Hydric soil indicators    f.  Credible evidence of conditions prior to disturbance    5. Other resource areas delineated:          D. Other Applicable Standards and Requirements   1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program?      a.  Yes  No  If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive Westborough, MA 01581       2005 b. Date of Map    2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run?   a.  Yes  No  If yes, include proof of mailing or hand delivery of NOI to: Division of Marine Fisheries - Southeast Marine Fisheries Station 50A Portside Drive Pocasset, MA 02559        b.  Not applicable – project is in inland resource area only   3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?   a.  Yes  No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website.         b. ACEC   D. Other Applicable Standards and Requirements  Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)?   a.  Yes  No      5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the wetlands regulations, 310 CMR 10.00.   a.  Yes  No If yes, describe which exemption applies to this project:          b. Exemption   6. Is this project subject to the DEP Stormwater Policy? a.  Yes  No   If yes, stormwater management measures are required. Applicants should complete the Stormwater Management Form and submit it with this form.    b. If no, explain why the project is exempt:              E. Additional Information    Applicants must include the following with this Notice of Intent (NOI). See instructions for details.   Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department.   1.  USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.)      2.  Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.      3.  Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form).   4.  List the titles and dates for all plans and other materials submitted with this NOI.   5.  If there is more than one property owner, please attach a list of these property owners not listed on this form.   6.  Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.   7.  Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.   8.  Attach NOI Wetland Fee Transmittal Form   9.  Attach Stormwater Management Form, if needed.   F. Fees   The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department (see Instructions and NOI Wetland Fee Transmittal Form). No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment:                EXEMPT 1. Municipal Check Number       2. Check date          3. State Check Number       4. Check date          5. Payor name on check: First Name       6. Payor name on check: Last Name   G. Signatures and Submittal Requirements   I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location.             Signature of Applicant       Date    Signature of Property Owner (if different)       Date    Signature of Representative (if any)       Date   For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents; two copies of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents; one copy of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to the DEP Regional Office (see Instructions) by certified mail or hand delivery. (E-filers may submit these electronically.) Other: If the applicant has checked the “yes” box in any part of Section D, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent.                        Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40    Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.  A. Applicant Information   1. Applicant:   City of Northampton a. First Name       b. Last Name       c. Company         d. Mailing Address         e. City/Town       f. State       g. Zip Code         h. Phone Number   2. Property Owner (if different):         a. First Name       b. Last Name       c. Company         d. Mailing Address         e. City/Town       f. State       g. Zip Code         h. Phone Number   3. Project Location:         a. Street Address       b. City/Town     To calculate filing fees, refer to the category fee list and examples in the instructions for filling out WPA Form 3 (Notice of Intent). B. Fees   Notice of Intent (Form 3) or Abbreviated Notice of Intent (Form 4): The fee should be calculated using the following six-step process and worksheet. Please see Instructions before filling out worksheet. Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.                                 B. Fees (continued)    Step 1/Type of Activity Step 2/Number of Activities Step 3/Individual Activity Fee Step 4/Subtotal Activity Fee         EXEMPT                                                                                                                                                                                                             Step 5/Total Project Fee:           Step 6/Fee Payments:      Total Project Fee:       a. Total fee from Step 5     State share of filing fee:       b. 1/2 total fee less $12.50    City/Town share of filling fee:       c. 1/2 total fee plus $12.50      C. Submittal Requirements Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.)                            Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Stormwater Management Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40    A. Property Information  Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key.  Note: This November 2000 version of the Stormwater Management Form supersedes earlier versions including those contained in DEP’s Stormwater Handbooks. 1. The proposed project is:    a. New development   Yes  No    b. Redevelopment   Yes  No    c. Combination   Yes  No (If yes, distinguish redevelopment components from new development components on plans).   2. Stormwater runoff to be treated for water quality is based on the following calculations:   a.  1 inch of runoff x total impervious area of post-development site for discharge to critical areas (Outstanding Resource Waters, recharge areas of public water supplies, shellfish growing areas, swimming beaches, cold water fisheries). b.  0.5 inches of runoff x total impervious area of post-development site for other resource areas.            B. Stormwater Management Standards   DEP’s Stormwater Management Policy (March 1997) includes nine standards that are listed on the following pages. Check the appropriate boxes for each standard and provide documentation and additional information when applicable.       Standard #1: Untreated stormwater   a.  The project is designed so that new stormwater point discharges do not discharge untreated stormwater into, or cause erosion to, wetlands and waters.    Standard #2: Post-development peak discharges rates   a.  Not applicable – project site contains waters subject to tidal action. Post-development peak discharge does not exceed pre-development rates on the site at the point of discharge or downgradient property boundary for the 2-yr, 10-yr, and 100-yr, 24-hr storm. b.  Without stormwater controls c.  With stormwater controls designed for the 2-yr, and 10-yr storm, 24-hr storm. d.  The project as designed will not increase off-site flooding impacts from the 100-yr, 24-hr storm.                              B. Stormwater Management Standards (cont.)    Standard #3: Recharge to groundwater    Amount of impervious area (sq. ft.) to be infiltrated:       a. square feet    Volume to be recharged is based on: b.  The following Natural Resources Conservation Service hydrologic soils groups (e.g. A, B, C, D, or UA) or any combination of groups:            1. % of impervious area       2. Hydrologic soil group       3. % of impervious area       4. Hydrologic soil group         5. % of impervious area       6. Hydrologic soil group       7. % of impervious area       8. Hydrologic soil group       c.  Site specific pre-development conditions:       1. Recharge rate        2. Volume       d. Describe how the calculations were determined:                  e. List each BMP or nonstructural measure used to meet Standard #3 (e.g. dry well, infiltration trench).                     Does the annual groundwater recharge for the post-development site approximate the annual recharge from existing site conditions?    f.  Yes  No    Standard #4: 80% TSS Removal   a.  The proposed stormwater management system will remove 80% of the post-development site’s average annual Total Suspended Solids (TSS) load.   b. Identify the BMP’s proposed for the project and describe how the 80% TSS removal will be achieved.               B. Stormwater Management Standards (cont.)   c. If the project is redevelopment, explain how much TSS will be removed and briefly explain why 80% removal cannot be achieved.                   Standard #5: Higher potential pollutant loads  See Stormwater Policy Handbook Vol. I, page I-23, for land uses of high pollutant loading (see Instructions). Does the project site contain land uses with higher potential pollutant loads    a.  Yes  No b. If yes, describe land uses:               c. Identify the BMPs selected to treat stormwater runoff. If infiltration measures are proposed, describe the pretreatment. (Note: If the area of higher potential pollutant loading is upgradient of a critical area, infiltration is not allowed.)                            Standard #6: Protection of critical areas  See Stormwater Policy Handbook Vol. I, page I -25, for critical areas (see Instructions). Will the project discharge to or affect a critical area?    a.  Yes  No  b. If yes, describe areas:            c. Identify the BMPs selected for stormwater discharges in these areas and describe how BMPs meet restrictions listed on pages I-27 and I-28 of the Stormwater Policy Handbook – Vol. I:                     B. Stormwater Management Standards (cont.)  Note: components of redevelopment projects which plan to develop previously undeveloped areas do not fall under the scope of Standard 7.  Standard #7: Redevelopment projects   Is the proposed activity a redevelopment project?    a.  Yes  No  b. If yes, the following stormwater management standards have been met:                    c. The following stormwater standards have not been met for the following reasons:                  d.  The proposed project will reduce the annual pollutant load on the site with new or improved stormwater control.       Standard #8: Erosion/sediment control   a.  Erosion and sediment controls are incorporated into the project design to prevent erosion, control sediments, and stabilize exposed soils during construction or land disturbance.          Standard #9: Operation/maintenance plan   a.  An operation and maintenance plan for the post-development stormwater controls have been developed. The plan includes ownership of the stormwater BMPs, parties responsible for operation and maintenance, schedule for inspection and maintenance, routine and long-term maintenance responsibilities, and provision for appropriate access and maintenance easements extending from a public right-of-way to the stormwater controls.                b. Plan/Title       c. Date          d. Plan/Title       e. Date            C. Submittal Requirements  Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department. DEP recommends that applicants submit this form, as well as, supporting documentation and plans, with the Notice of Intent to provide stormwater management information for Commission review consistent with the wetland regulations (310 CMR 10.05 (6)(b)) and DEP’s Stormwater Management Policy (March 1997). If a particular stormwater management standard cannot be met, information should be provided to demonstrate how equivalent water quality and water quantity protection will be provided. DEP encourages engineers to use this form to certify that the project meets the stormwater management standards as well as acceptable engineering standards. For more information, consult the Stormwater Management Policy.               D. Signatures             Applicant Name       Date       Signature             Representative (if any)       Date       Signature