CCG Build email 10/14/2009 Wayne Feiden From:Brian Byrnes [bbyrnes@ccgbuild.com] Sent:Wednesday, October 14, 2009 9:23 PM To:Wayne Feiden Cc:Shardool Parmar; jlaurila@nohodpw.org Subject:RE: HGI Access Agreement] Attachments:SECTION 01370 Odor Control and Air Emmissions.pdf; SECTION 02000 Soil and Material Management.pdf; 02200 Excavation HGI.pdf; SECTION 02910 Clean Corridor HGI.pdf; HGI Soil Remediation Section Oct09.pdf Gentleman, in response to your previous requests. Attached are the revised and updated Specification Sections regarding the utility site work and soil conditions. I anticipate you will find this to your satisfaction. Hard copies with be delivered in the morning to Mr. Jim Laurilo at DPW. Please contact me if you may have any questions or are in need of further information. Section 01370 Odor control and Air Emissions Section 02000 Soil and Material Management Section 02200 Excavation and Backfilling Section 02910 MGP Clean Utility Corridors HGI Soil Remediation Section Oct 09 Brian M Byrnes CCG Wed, 10/14/09, Wayne Feiden <wfeiden@northamptonma.gov> --- On wrote: From: Wayne Feiden <wfeiden@northamptonma.gov> Subject: RE: HGI Access Agreement] To: "Brian Byrnes" <bbyrnes@ccgbuild.com> Cc: "Shardool Parmar" <sparmar@pvhg.com>, jlaurila@nohodpw.org Date: Wednesday, October 14, 2009, 7:50 AM Brian— When you send the version with the white background to DPW, please send me a copy as well. Thanks. Wayne Feiden, FAICP Director of Planning and Development City of Northampton 1 Email to or from the city is a public records except when it falls under one of the specific statutory exemptions. From: Brian Byrnes [mailto:bbyrnes@ccgbuild.com] Sent: Friday, October 09, 2009 5:31 PM To: Wayne Feiden Cc: Shardool S. Parmar; jlaurila@nohodpw.org Subject: Re: HGI Access Agreement] Gentleman: attached is an electronic version single sheet (U2) highlighted plan that shows all the utilities on the site (same as plan L-6 issued to DPW on 9-24-2009), the extent of the BSG Phase I clean up area and all BORINGS recorded for the site within Area 1&2. Logs for each of these borings was previously submitted to DPW. Please indicate if this satisfies your requirement before we complete the other plans. Brian M Byrnes Fri, 10/9/09, Wayne Feiden <wfeiden@northamptonma.gov> --- On wrote: From: Wayne Feiden <wfeiden@northamptonma.gov> Subject: HGI Access Agreement] To: "Brian Byrnes" <bbyrnes@ccgbuild.com> Cc: "Shardool S. Parmar" <sparmar@pvhg.com>, jlaurila@nohodpw.org Date: Friday, October 9, 2009, 8:29 AM Thanks Brian. I know that you provided much of the information, but the format DPW requested in September was: 1.A single sheet with ALL of the public utilities on that sheet, showing their final location (sewer and sanitary sharing a corridor), and showing all of the margins of the clean up and all of the borings (Bay State Gases and the ones that OTO did for us) all on one sheet. 2.The same sheet or a separate sheet with all of the borings results shown. 3.The same sheet or a separate sheet with all of the construction details shown.. 2 Thank you. They have committed to expedite their review as soon as we receive this information. Wayne Feiden, FAICP Director of Planning and Development City of Northampton Email to or from the city is a public records except when it falls under one of the specific statutory exemptions. From: Brian Byrnes [mailto:bbyrnes@ccgbuild.com] Sent: Wednesday, October 07, 2009 1:17 PM To: Wayne Feiden Subject: Fw: Re: HGI Access Agreement] Shardool, in reference to the forwarded e-mail please see below: Shardool” Two issues I want to bring you up-to-date on. First, we have had a couple of contacts recently that have made us nervous. Apparently someone is doing soil borings on the property without, at least as far as I can tell, any access agreement or permission from us and your contractor called DPW to ask permission to cut down some of the trees on the site. Soil borings were conducted on site with an approved permit issued by DPW on 10-2-2009 (see attached file). No work was performed without the proper authorization. The dig safe number is noted on the permit. In addition, no trees were removed for this operation. We are fully aware that the proper permits must be secured prior to the removal of existing trees and such permit will be in hand prior to the commencement of that particular activity. Nothing can happen on the site until either we transfer the property or we sign a site-access agreement. Please so notify your contractor. Our environmental attorney will be sending you a formal notice, but I wanted to give you a heads up. 3 Second, as you know, DPW sent a clear email on September 18, 2009 on exactly what they need so that they can act on the request for clean utility corridors. They have received some of this information, but not the full package that DPW requested. Jim Laurila at DPW has committed to expediting his review once the plans come in, but he cannot act until this information is provided, and so that is delaying the project. 1.The clean corridor plans and specifications do not show the detail that was requested. DPW needs construction drawing level detail to show these critical details. Details for a clean corridor for each line type were provided on seperate sheets. I will have these details incorporated onto the Berkshire plans. 2.The contaminated soil management plan was not submitted, nor were specifications to document what the process is for determining what is contaminated. There needs to be a clear standard, even if that standard is driven by odor. Section 01370 Odor Control Emissions and Section 02000 Soil & Material Management specifications were sent with previous package. I will forward the project site remediation plan reviewed with BSG under seperate cover by the end of the day. 3.The CCG plans now show clean corridor for the entire site - not just old MGP site. Is this correct? That is a big change that we have not heard about before. We will modify plans to only include area of old MGP site. CCG previously indicated worse case scenario to show overall potential impact to site. 4.The plans do not show the currently planned utilities, with the sewer and storm sewer still being the old layout, and the different utilities are shown on different plans. We want final plans showing all of the work on one sheet. A stamped final set of plans was issued to DPW on 9-24-2009. However, I will have Berkshire issue an overall utility plan with each utility identified. 5.show the old layout). They have to approve the final plans. Final stamped civil Plans were submitted to DPW on 9-24-2009 6.The final plans need to show all of the borings and clean fill area limits. All boring locations and data were submitted by BSG. This information is typically not provided on plans but in report form as previously submitted. Please advise. Wayne Feiden, FAICP Director of Planning and Development City of Northampton Email to or from the city is a public records except when it falls under one of the specific statutory exemptions. -- Shardool Parmar 4 President Pioneer Valley Hotel Group 321 Center St. Ludlow, MA 01056 Cell (413) 231-7540 Fax (413) 547-0488 www..pvhg.com “Lead, follow or get out of the way” Thomas Paine 5