Loading...
Sacred Heart Rectory Preferably Preserved Notification and supporting filesPL- ANNINO AND _DEVELOPMENT CITE- -OF NORTHAMPTON - - -- -- - planning • conservation • zoning • northampton G1S • historic • community preservation • central business architecture Sarah I. LaValley, Conservation, Preservation, & Land Use Planner • siavalley@NorthamptonMA.gov 413- 557 -1263 July 14, 2010 Louis Hasbrouck Northampton Building Commissioner Puchalski Municipal Building 212 Main Street Northampton, MA 01060 RE: Historical Commission demolition review, Sacred Heart Rectory Louis: In accordance with Chapter 161 of the Northampton Ordinance, "Demolition," the Historical Corrunission held a hearing July 13 to determine "Preferably Preserved" status following an initial determination of significance. The Commission voted that the rectory is Preferably Preserved according to the Ordinance, and enacted a 12 -month demolition delay. A demolition permit may not be issued until June 7,2011; one year from the initial application date. A copy of the Activity Tracking Sheet is enclosed. The Historical Commission wanted to communicate that the 12 -month delay applies only to the main rectory structure. Removal of the attached garage building and subsequent additions to the rear of the structure are permissible under the Ordinance, and it appeared as though their demolition may help to provide room for building or parking to the rear of the rectory in the coming year, while plans for the building are being finalized. Please contact me if permits for the removal of these additional elements are filed. Thanks very much V Sarah LaValley Conservation, Preservation & Land Use Phumer Enclosures: Demolition Review Application Activity Tracking Sheet, Rectory Cc: Edward Etheredge, Esq. Ed Skroski Central Business Architecture Committee Ronan Catholic Bishop of Springfield Reverend Joluz Conriors, St. Elizabeth Ann Seton Parish DEMOLITION REVIEW APPLICATION Activity Tracking Sheet Property: 101 King Street, Sacred Heart Rectory Map: 31B Parcel: 159 Year Built: 1850 Received in Building Department: June 7, 2010 Referred from Building Department: June 11, 2010 Action Taken/ Northampton Historical Commission Action Taken Bv : V Entire Commission Sub - Committee of the Commission Commission Designee/ Staff Date Action Taken June 21, 2010 Initial Determination June 21, 2010 Public Meeting held July 13, 2010 Public Hearing Held Determination Made Property has been determined not to be Significant according to Ordinance definition. No further action will be taken. Demolition Permit may be issued. Property has been determined to be Significant according to the Ordinance definition and a Public Hearing has been /will be scheduled. Demolition Permit may not be issued at this time. Public Hearing has been held, Property was determined Significant but not Preferably Preserved. No further action will be taken/ Demolition Permit may be issued. Photo documentation may be required. Public Hearing has been held. Property has been deemed to be Preferably Preserved. The demolition review period has been initiated. No demolition permit may be issued until the Historic Commission approves an alternative plan or the twelve month period concludes. Alternate plan has been approved/ delay terminated. Demolition may or may not be approved as part of plan. Twelve month time period has expired, demolition permit may be issued. / Referred by: Y Date Rectory 1. Name of Applicant: /-c.V Address: 3�- �Z %�o v-�i� a -z.► Telephone: 2. Owner of Property: tq �a Address: lephone: '732 3. - Status of Applicant: Owner Contract Purchaser Lessee Other (explain) R404 , `s 4. Job Location: 5. Existing Use of Structure /Property: v f-cf-d-W 2 . 6. Description of Proposed Use /Work/Project/Occupation: (Use additional sheets if necessary): .p�€i�o�sff 7. 'Attached Plans: Sketch Plan Site Plan Engineered /Surveyed Plans t•e' 4 #c.7 7 - 02/C4 4 4P rn�. �S✓ � 8. Has a Special Permit/Variance /Finding ever been issued for /on the site? NO DONT KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES IF YES: enter Book Page and /or Document # 9.Does the site contain a brook, body of water or wetlands? . NO _ DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , date issued: . (Form Continues On Other Side) W:\Documents\FORMS \original\ Building - Inspector\ Zoning - Permit- Application - passive .-doc 8/4/2004 t• Please type or print all information and return this form to the Building Inspector's Office with the $I5M' Ingfee (check ormoney order) payable to the City ofNorthampton IF YES, describe size, type and location: 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION Tbb 4column reserved for use by Me Building Department � %1 13. Certification: 1 hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: �° � �6 Applicant's Signature NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health, Conservation Commission, Historic and Architectural Boards, Department of Public Works and other applicable permit granting authorities. W :\Dor ments\FOAMS\origirW\Building- Inspector\Zoning- Permit - Application- passive.doc . 8/4/2004 EXISTING PROPOSED , r� <.Y .0 '� �wti Kc Fi• � Lot Size :.�a• �} f `Y�l��i ' Frontage i Setbacks Front Side L: R: L: R: *_ +� 1 �• Rear Building Height Building Square Footage % Open Space: (lot area i minus building & paved p arkin g # of Parking Spades # of Loading Docks Fill: (volume & location) 13. Certification: 1 hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: �° � �6 Applicant's Signature NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health, Conservation Commission, Historic and Architectural Boards, Department of Public Works and other applicable permit granting authorities. W :\Dor ments\FOAMS\origirW\Building- Inspector\Zoning- Permit - Application- passive.doc . 8/4/2004 July 13, 2010 HAND DELIVERED Barbara Blumenthal, Chair Northampton Historic Commission 212 Main Street Northampton, MA 01060 Re: St. Elizabeth Ann Seaton Parish - Application under Chapter 61 Dear Ms. Blumenthal: This letter is to confirm that the applicant, St. Elizabeth Ann Seaton Parish, and the property owner, Roman Catholic Bishop of Springfield, make this application without waiving any rights under 42 U.S.C. 2000, et. seq., the Religious Land Use Act and Massachusetts Declaration of Rights and United States Constitution. See Attorney General v. Desilets, 418 Mass. 316, 322 (1994). Very truly yours, Edward D. Etheredge EDE/kap cc: Sarah LaValley client Etheredge_ &_Steuer,_ P.C. ATTORNEYS AT LAW 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 EDWARD D. ETHEREDGE (413) 584 -1600 FAX (413) 585 -8406 SHELLEY STEUER ed@noholaw.com ss@noholaw.com WHEATLY R, GULMI- LANDY' wheatly @noholaw.com 'Also Admitted in New York Also Admitted in California July 13, 2010 HAND DELIVERED Barbara Blumenthal, Chair Northampton Historic Commission 212 Main Street Northampton, MA 01060 Re: St. Elizabeth Ann Seaton Parish - Application under Chapter 61 Dear Ms. Blumenthal: This letter is to confirm that the applicant, St. Elizabeth Ann Seaton Parish, and the property owner, Roman Catholic Bishop of Springfield, make this application without waiving any rights under 42 U.S.C. 2000, et. seq., the Religious Land Use Act and Massachusetts Declaration of Rights and United States Constitution. See Attorney General v. Desilets, 418 Mass. 316, 322 (1994). Very truly yours, Edward D. Etheredge EDE/kap cc: Sarah LaValley client PAS NING -AN DEVELOPMEN CITY of 1\ToRTHA i -YrON- - planning • conservation • zoning • northampton GIs • historic • community preservation • central business architecture Sarah I. LaValley, Conservation, Preservation, & Land Use Planner • slavalley@NorthamptonMA.gov • 413- 587 -1263 June 30, 2010 Reverend John Connors Pastor, Saint Elizabeth Ann Seton Parish 3 Elm Street Northampton MA, 01060 RE: Historical Commission demolition review, 91 and 101 King Street: Menard Center, Rectory, and Christian Life Center Dear Reverend Connors: In accordance with Chapter 161 of the Northampton Ordinance, "Demolition," the Historical Commission at their June 21 meeting evaluated the three structures for which you filed demolition applications with the building inspector. Enclosed please find notification of the Commission's determinations. These were provided to the Building Inspector on June 22. The Menard Center was not determined to be significant under the Ordinance. No further action on this structure is required by the Historical Commission. The Christian Life Center, although of interest to the Historical Commission, is located within the Central Business District. According to 161 -3 C of the Demolition Ordinance, "Applications for demolition within the Central Business Architecture District will be reviewed by the Central Business Architecture Committee." The Central Business Architecture Committee has scheduled a public hearing regarding the proposed demolition for July 14 at 7:00 PM in Council Chambers. The Historical Commission determined that the rectory is a Significant structure in accordance with the Demolition Ordinance. The Commission will now hold a public hearing to determine whether the building is "Preferably Preserved." This hearing is set for July 13 at 6:30 pm, in the JFK Middle School Community Room; an agenda is enclosed. A determination as to whether the rectory should be Preferably Preserved must be made within fourteen days of the hearing. Section 161 -5 D of the Ordinance lists some evidence that the Commission might consider when making its determination of Preferably Preserved status. These includes, but aren't limited to, the rectory's condition, age, role in the streetscape, and construction elements. It would be helpful if you could provide any information you think would be useful for the Commission to review, including structural analyses and site plans. If these can be provided the week prior to the hearing, they will be included in packets for members to review in advance. i I, Thank you for taking the time to participate in the Commission's site visit last week. Please let me know if I can provide any assistance prior to the hearing. l a alley Conservation, Preservation &Land Use Planner Enclosures: Demolition Review Application Activity Tracking Sheet, Menard Center Demolition Review Application Activity Tracking Sheet, Rectory Historical Commission Agenda, July 13 Cc: Louis Hasbrouck, Northampton Building Commissioner Ed Skroski Central Business Architecture Committee Roman Catholic Bishop of Springfield — _ -- -- vw:NorthamptorrlVIa:gov• Fax413 =587= 12Ci4 - - - -- --- - - - - -- DEMOLITION REVIEW APPLICATION Activity Tracking Sheet Property: 101 icing Street, Sacred Heart Menard Center Map: 31B Parcel: 159 Year Built: 1900 Received in Building Department: June 7, 2010 Referred from Building Department: June 11, 2010 Action Taken/ Northampton Historical Commission Action Taken By : V Entire Commission Sub - Committee of the Commission Commission Designee/ Staff Date Action Taken to 0'� l� d� ltd Initial Determination , o pt o l O Public Meeting held Public Hearing Held Determination Made /' V Property has been determined not to be Significant according to Ordinance definition. No further action will be taken. Demolition Permit may be issued. Property has been determined to be Significant according to the Ordinance definition and a Public Hearing has been /will be scheduled. Demolition Permit may not be issued at this time. Public Hearing has been held, Property was determined Significant but not Preferably Preserved. No further action will be taken/ Demolition Permit may be issued. Photo documentation may be required. Public Hearing has been held. Property has been deemed to be Preferably Preserved. The demolition review period has been initiated. No demolition permit may be issued until the Historic Commission approves an alternative plan or the twelve month period concludes. Alternate plan has been approved/ delay terminated. Demolition may or may not be approved as part of plan. Twelve month time period has expired, demolition permit may be issued. a Referred by: " I , � � Date DEMOLITION REVIEW APPLICATION Activity Tracking Sheet Property: 101 King Street, Sacred Heart Rectory Map: 31B Parcel: 159 Year Built: 1850 Received in Building Department: June 7, 2010 Referred from Building Department: June 11, 2010 Action Taken/ Northampton Historical Commission Action.Taken By : Entire Commission Sub - Committee of the Commission Commission Designee/ Staff Date Action Taken �VKL Ll , X 610 Initial Determination A t4 V-9 5L (, aDlo Public Meeting held Public Hearing Held Determination Made Property has been determined not to be Significant according to Ordinance definition. No further action will be taken. Demolition Permit may be issued. Property has been determined to be Significant according to the Ordinance definition and a Public Hearing has been /will be scheduled. Demolition Permit may not be issued at this time. Public Hearing has been held, Property was determined Significant but not Preferably Preserved. No further action will be taken/ Demolition Permit may be issued. Photo documentation may be required. Public Hearing has been held. Property has been deemed to be Preferably Preserved. The demolition review period has been initiated. No demolition permit may be issued until the Historic Commission approves an alternative plan or the twelve month period concludes. Alternate plan has been approved/ delay terminated. Demolition may or may not be approved as part of plan. Twelve month time period has expired, demolition permit may be issued. Referred by: d l�Gl v� Date a'� c} 'J l o PLANNING AND DEVELOPMENT • CITY OF NORTHAMPTON planning • conservation • zoning • northarnpton CIS • historic • community preservation • central business architecture Sarah I. LaValley, Conservation, Preservation, & Land Use Planner • slnvalle) • 413 -557 -1263 Northampton Historical Commission Meeting Notice DATE: Tuesday, July 13, 2010 TIME: 6:30 PM PLACE: JFK Middle School Community Room, 100 Bridge Road, Florence For questions contact: Sarah LaValley, slavalley @northamptonma.gov or Barbara Blumenthal, bblument @smith.edu Agenda 1. Public Comments 2. Approval of Minutes of June 21, 2010 3. Public Hearing: To determine whether the Sacred Heart Rectory, 101 King Street, Map ID 31B -159, should be determined "Preferably Preserved" pursuant to the Northampton Demolition Ordinance, Chapter 161 of the General Code. 4. Review of Mail S. Other business City Hall • 210 Man1 Street, Room 11 • Northampton, MA 01060 • www.Northampton:Ma.gov • Fax 41.3 - 587 -1264 original printed on recycled paper F0RX B .___ 7 _ BUILD1NG MASSACHUSETTS HISTORICAL COMMISSION Office of the Secretary, State House, Boston 4. Map. . Draw sketch of building location in relation to nearest cross streets and other buildings. Indicate north. I ✓t n YLIVI+b V I yo t W z D r�iZrcrH T' C� LT USGS Quadrant MHC Photo no, st " John; 'Hopki ng Hou ent use Rectory ent owner Oman Cathol c` Iii shad 6f Springfield ription: c, 1830 Durce ''visual eyi. dente Gre R-vrr v Architect _I saac Damon nr '1 h ma pratt Exterior wall fabric bri ck Outbuildings (describe) none. Other features 2 stories; 5 bays wide; enclosed pediment; single end ...=-- chimti,ey�_: - de.ta.3.�led- ..entran"cewav .. _ -- es =bri ck, nd Altered a uminum si cin , Date Moved no Date 5. Lot size: Less than one acre Over one acre x Approximate frontage Approximate distance of building from street 50 feet 6. Recorded by Co Dubie Organization Northampton Historical (�ommission Date An P OE W E D ,`i MAY 5 1976 MASS. H1ST. COMM. a-. 2� D by A ID` - _ ---- - - - - -- -- - - - - -- - - - R - t t-t• THIS SPACE (over) st " John; 'Hopki ng Hou ent use Rectory ent owner Oman Cathol c` Iii shad 6f Springfield ription: c, 1830 Durce ''visual eyi. dente Gre R-vrr v Architect _I saac Damon nr '1 h ma pratt Exterior wall fabric bri ck Outbuildings (describe) none. Other features 2 stories; 5 bays wide; enclosed pediment; single end ...=-- chimti,ey�_: - de.ta.3.�led- ..entran"cewav .. _ -- es =bri ck, nd Altered a uminum si cin , Date Moved no Date 5. Lot size: Less than one acre Over one acre x Approximate frontage Approximate distance of building from street 50 feet 6. Recorded by Co Dubie Organization Northampton Historical (�ommission Date An P OE W E D ,`i MAY 5 1976 MASS. H1ST. COMM. 10. Bibliography anal /or references (such as. local histories, deeds, assessor's records, early maps, etc.) picturesque Hamp shire Forbes Library. Obituary of Thomas Pratt, 12/8/186&; article on William Fa Pratt, 12/26/1565; Hampshire Oateti:e David Oa Merril. a Isaac Damon and the Architecture of the Federal Period in New England Yale University dissertation. At Northampton Historical Society, O O O O -I D 2 ZZZZZZ 0 .m.'om N -I D mmm O o00 c 0 A NN _0 m --I D = Cn -I MmM vvv m -i - Am HD x ;o m m c D_. v ow DDO a _____.m_. - a)i Z-no z _-i - D vcn ° mmn o O P- m 3 c D m � O < 3 m z --i z m •• m 70 < mmmmmm 000000 C m �r m m N <n m •• < Hz o- 1.A D D (/� X v D z� mmmmmm 3 W C710JJ N c o m ON - n [n N T N 8vZ 0411NW m D O N C) �i N \ 3 fi7 N o r C 3 D w ° D v � 0 v 0 DODO r 0 W O O O O m m m 2 ZZZZZZ 0 N O < v z -I w .O cn 0 mmmmmm OS Z< J m D r D O D A 3 D vcn D o W m c m D 3 < m Cl m •• m 70 < mmmmmm 000000 C m r m m •• mmmmmm Hz o- 1.A D (/� m v D m mmmmmm rn C710JJ N OOrOf m - n T 8vZ m D m D MCI fi7 z r -j�0- m � 0 v 0 DODO r 0 W 2 N 1 -r\)-- < W O i - moo D m 0 co -I -1-1 -I 4141 -I --I m � N c m m r ;o ;a rr- -i 00000000 W D ZZ -D-I� rc7vvDD v\mmr - N W.10J m CDM- - w-I ;a - I D 0 0 3 0 m D 0 0 0 owrn(O - w W(O.1 O w o ZC C)DD - �O) W-POO 'O C m m cn D 0 < Z \ J J J O m D O T D-I;0• A > H z 2 n o �� O ° D f D - Z m N -Zi H °� ° 0 � r v mmmaw m v i; ' - Z < D n (O(O(OJ L7 ° m m � nnn" Z -j -I - z c A S N 3 mmm70C D D T !D n ➢ m D - m z �., Oz*km W I r D _ r ° cfl MW Z - D or 0 WN�m I I 1 DCD- rzmr W -I 0 J41 r z C m z O a O • mm m mmmm HH v Z 00 D C) - 5 z C/A -i mmm- -ism- <Cn -0 m Z ° m x P N 000 0 < - N H r mmm- O m W WVt O CL D W OOOZ � - D ( r - ornww (OWrn C) c -I 33307 Cncncn- D v ZZZZ222Z 0000zzzo S m r c OWN -i 0 w 00- -0100 m m - zzzz\\\z D m m ;a o C (Z7 O0 z ➢ cn - z mmmm-cni-cniom ti Cl) W 3 3 n z z m m m _ DD D 33 3 0 O .'o co H D m D co -< Ul ZZZZCCCz z v v E z -I v v cm HD ® - O - c000zzzo zzzZ - - -z D r mmmmmm - I - Im D - 03 D -mf•_o 0 w o m m m 2 ZZZZZZ 0 N O < v z -I w .O cn 0 mmmmmm OS Z< J m D r D D 3 mmmmmm vcn D o W m c m D m Cl m •• m 70 < mmmmmm 000000 C m NN N D m •• mmmmmm Hz o- 1.A m mmmmmm rn C710JJ N OOrOf T 8vZ D MCI z r -j�0- � m ° - moo m < c m m D I c ZZ -D-I� rc7vvDD v\mmr - N W.10J Z CDM- - w-I ;a - I D m m = DMZ owrn(O W(O.1 O w o ZC C)DD - �O) W-POO 'O >; m cn H O CI� 000 o m C/) T D-I;0• D r m H z n o �� O D - Z m N -Zi � r v ()I (n Ul-1 i\S H 0 Z i; -N i - Z < D (O(O(OJ L7 ° m m � m ou r A 3 N 3 m n ➢ OlW D m _ r ° H MW Z - D J41 z 410) O Z- • J M 00 m C P N 000 0 < N - O W WVt D W (n (n U r - ornww (OWrn C) c -I WO NODOI ° OWN A 00- -0100 -I 4101J m 000 - z "O D 0 m m r _w W 0 I O O O H Z N r O (o C 7 cF (n N in m rn O c7 m a O - Ii Lo 0 rn \ N n \_ 3 O 3 r'n� >W H (O C 3 A r t� r�0 0 m m { Z C-) 0 U ° C) D iL7 ° Z 0 - 2 D 3 0 O Z 3 ti ti 2 C cn m m m m m H m ° D -I m O D r C m C� D Z _ C D -�G (ov (OD Om 1 � JUN 2 5 2010 1 Conditions Assessment Report Sacred Heart Church and Rectory �1 99 King Street Northampton, Massachusetts Prepared For.• Diocese of Springfield 63 Elliot Street Springfield, MA 01105 Prepared By. Engineering Design Associates, Inc. 11 Central.Street West Springfield, Massachusetts in association with Reinhardt Associates, Inc. (Architects) 430 Main Street Agawam, Massachusetts Project No. 10 -11 March 22, 2010 INTRODUCTION The Diocese of Springfield requested that Engineering Design Associates, Inc. (EDA) conduct a field investigation to assess the physical condition of the Sacred Heart Church and the Rectory located on King Street in Northampton, Massachusetts. This review is limited in scope and will be conducted to the extent necessary to render an opinion regarding the structural integrity of the two buildings. At no time shall it be, construed that Engineering Design Associates, Inc., in providing our services, is attesting to the load carrying capacity of the structural members used in the construction since no design -check calculations will be performed. EDA contracted with Reinhardt Associates, Inc. (RAI), architects from Agawam, Massachusetts, to provide their expertise in evaluating the building envelopes and architectural components. On the 12"' of March, EDA and RAI visited the property and made visual observations of Church and Rectory. Photographs were taken to document and record the general condition as well as the distressed areas. All descriptions of the site conditions present herein accurately reflect the observations as of the latest date of its on- site visits. For the purposes of this report, the front of the building (cover photograph) will be referred to as the West Elevation. Sacred Heart Church and Rectory - - Page 2 EDA Project No. 10 -11 FIELD OBSERVATIONS FDA's initial field observation was performed on 12 of March. The Church was the first building to be investigated. There was access to view the roof framing via a catwalk and the first floor framing was also accessible to view. The Rectory was next to be investigated. The roof framing was viewed from the attic. The second floor framing was not accessible due to ceiling finishes. The first floor framing was also not accessible due to a lath and plaster ceiling in the basement. Photographs were used to document the various conditions observed (Appendix 'A'). The Church The conditions assessment of the Church began with the roof framing. The framing was viewed from a catwalk that was constructed above the ceiling within the framing members. The main support system for the roof consists of steel trusses that support heavy timber wood secondary beams.'The timbers in turn support tongue and grooved wood planks that is the roof sheathing. Past water infiltration was noted as staining of the timber beams and planking was evident. Two sections of planking were replaced toward the domed tower, apparently when the Church was re- roofed. From the catwalk, this reporter proceeded to the lower level of the domed tower by way of a ladder and an opening in the tower floor. The tower is heavy timber framed with a wood clad interior. The timber members were in generally good condition and the jointing was tight. The framing for the main level of the Church could not be observed due to wall and ceiling finishes. The condition of the walls and ceiling was observed and all were in generally good condition with minimal cracks observed in the plaster. Peeling paint was observed throughout the arches below the clerestory windows. The plaster surrounding the column, located to the right of the Sanctuary, appears to have moved. There is an open joint between the column wrap and wall. Water infiltration has damaged the plaster ceiling to the left of the Sanctuary. Finally, the basement was investigated. There is a full basement level located beneath the Sanctuary and a crawl space located beneath the remainder of the Church. Much of the framing beneath the Sanctuary was covered with plaster ceiling but exposed steel beams were observed. The concrete slab on grade is cracked and uneven. The floor framing above the crawl space was observed. The framing consists of steel beams supporting wood floor joists. There were no cracks or checks observed in the floor joists. The steel beams are supported on steel bearing plates that are anchored to brick piers. There is no concrete slab on grade within the crawl space. The exposed soil is very fine silt that dusts up when disturbed. The exterior of the building consists of brick veneer and structural glazed tiles. The roof is covered with asphalt shingles. There are two free standing entry columns that are clad with structural glazed tile. The tile is also the ceiling finish of the exterior portion of the entry. The west face of the structural glazed tiles of the columns show signs of deterioration. Structural glazed the also covers the two side niches. The exterior entry steps are concrete and appear that they have been repaired several times over the years. The domed tower is wood clad and is in need of painting. The brick veneer above the clerestory windows needs repointing. The canopies covering the two side entries show signs of deterioration. The underside of the plywood sheathing is water stained and the plywood is delaminating. At the rear left corner of the Church there was a diagonal crack observed. The crack appears to have originated due to some sort of differential settlement. This reporter was informed that a buried oil tank was removed from this area and this could be the reason for the settlement. The crack does not appear to have been repaired and does not appear to be active. The downspout located at the northwest corner of the Church does not extend far enough to allow runoff to flow away from the Church. At this location the runoff has eroded the soil and has created a large hole. Shrubs to the right and left of the entry are overgrown and need to be cut back in order to prevent future deterioration of the building envelope. Sacred Heart Church and Rectory Page 3 EDA Project No. 10 -11 March 22, 2010 The Rectory The Rectory has a full basement, two framed floors and a walk -up attic. The basement is used for mechanical equipment and storage and has a concrete floor. The foundation walls are comprised of a combination of stone and brick. The upper floors are framed with wood floor joists, supported by exterior brick bearing walls, interior bearing walls, and wood beams where dictated by the floor plan. The roof is framed with wood rafters supported by a heavy timber framework and supporting the lx sheathing and slate roof. The foundation walls are constructed with stone and brick. The foundation wall of the storage area in the boiler room shows signs of water infiltration. The concrete slab on grade has cracks and is uneven. Several of the brick piers have been replaced with concrete block piers. Several other brick piers have been re- pointed. The framing for the first floor was hidden from view by a plaster ceiling. The rear portion of the Rectory has a Family/Living room. The floor framing for this area is in poor condition. Additional support beams and temporary screw jacks were added at some point in time. One column has since loosened and fell over. Walking around the first floor, the floor appears uneven throughout the Rectory. The kitchen floor is covered with ceramic tile and is uneven. There were no cracks observed in the tile or mortar joints. The other rooms in the Rectory are covered with carpet and appear to slope. The furniture in the Dining Room was observed to be uneven. As stated above, the framing for the first floor could not be observed so the exact cause could not be ascertained. The framing for the second floor was also hidden from view by the ceiling finishes. The roof framing consists of timber frames supporting roof rafters. The jointing of the timbers appeared tight. There was evidence of a fire at some time in the past. The timber frames, rafters and sheathing all were observed to be heavily charred. A small section of the sheathing was replaced due to fire damage. The two story exterior walls of the Rectory are constructed using brick veneer and wood trim that had been clad with aluminum. This portion of the Rectory has a slate roof. The roof plane is wavy, the ridge line is uneven and the slates are uneven with broken and missing slates. There are two chimneys penetrating through the roof. The chimney located in the southeast corner is in need of rebuilding while the chimney at the southwest corner needs re- pointing. The one story rear section is clad with vinyl siding and the roof is clad with asphalt shingles.. The one story section has the Family/Living room and a two car garage. There is a one story lean to addition at the east end of the Rectory. This addition has a dirt floor with board and batten wood siding and an asphalt shingled roof. There is an overhead garage door on the south side and the space appears to be used for storage. This addition is in generally poor condition, the base of the siding is rotting and the garage door is buckling and is off the door tracks. STRUCTURAL EVALUATION Overall, the Church is in generally good condition but the Rectory is in generally fair condition. Both buildings require some remedial work. The Church The existing brick veneer is in need of some repointing, especially above the clerestory windows. The diagonal crack at the southeast corner needs to be repaired in order to eliminate future water infiltration and monitored to determine whether or not it is actively settling. The structural glazed tiles surrounding the two entry columns need to be repaired to prevent water infiltration. Both canopies at the side doors need to be rebuilt and the plywood sheathing needs to be replaced. Downspout extensions should be installed in order to drain the rain water away from the Church. Re- grading of the perimeter of the Church should also be done, again to provide positive drainage away from the Church. As for the issue with the dust created within the crawl space, this can be resolved by either installing a new concrete slab on grade or attaching a damp - proofing material (system) to the underside of the floor framing. Typically, the concrete slab, 2 to 3 inch thick, would be placed on a vapor retarding material. The front concrete entry stairs need to be repaired in order to prevent tripping hazards. The mortar joints in the exterior brick veneer, especially the joints above the clerestory windows, need to be re- pointed. The main roof and each of the low roofs need to be stripped and re- shingled. Sacred Heart Church and Rectory Page 4 EDA Project No. 10 -11 March 22, 2010 The Rectory The Family/Living room floor framing needs to be re- supported with new permanent columns and concrete footings. Positive connections between the beams and columns and between the floor joists and beams will also be required. A new concrete slab on grade will need to be installed in this area of the basement. Since the reason for the uneven first floor could not be determined the extent of the remedial work can not be addressed without conducting some selective demolition. The roof framing timber frames and rafters that are charred from the fire need to be cleaned and sealed. The slate roofing is in fair condition but broken and loose slate need to be removed and replaced. Also, any missing slates need to be replaced. The two chimneys need to be rebuilt above the roof line. The lean to addition on the east side of the Rectory needs to either be re -built or removed. As part of the Assessment for the Rectory, we were asked to evaluate the feasibility of converting the existing Rectory into offices. This change in use will trigger several aspects of the Commonwealth of Massachusetts State Building Code. The first Code issue is changing from a single family residence which is governed by the One and Two Family Residential Code to office which is governed by the Commercial Code. The next issue will be the change in minimum floor loads. In addition, the building's lateral bracing system will need to be idenitified and evaluated for compliance with the minimum loads per Code. The final issue that will be required for the structural aspect to change the use of the building is the lateral force resisting system. Lateral loads are generated due to wind and seismic. BUILDING ENVELOPE STUDY Introduction Sacred Heart Church and Rectory are located at 101 King St., Northampton, MA. Reinhardt Associates, Inc. (R.AI), architects of Agawam, MA was retained by Engineering Design Associates, Inc. (EDA), structural engineers of West Springfield, MA to assist them in preparing a building condition assessment of the church and rectory. On March 12, 2010, My -Ron Hatchett of RAI accompanied Andrew Pavlica, Jr. of EDA to conduct an inspection of the building's exterior and interior existing conditions, took photographs and notations describing the findings which became a part of this report. Sacred Heart Church and Rectory Page 5 EDA Project No. 10 -11 March 22, 2010 EXTERIOR OBSERVATIONS The Church The Sacred Heart Church is a classical style building built in 1916. The main body of the building mass has of a large gable roof with a large steeple on top, flanked by lower projecting wings on both sides covered by shed roofs. The church has a large portico in the front, supported by two round glazed tile columns. The pitched roof is covered with asphalt shingles with built -in gutters and copper and aluminum downspouts. The gable is trimmed with glazes tile as well as the entablature and the trim around the eaves. The exterior walls are brick masonry laid in a Flemish pattern with glazed tile belt courses. Clearstory wood windows occupy the upper portion of the building and large stained glass arched windows dominate the main walls of the church. The front stairs are cast in place concrete, a concrete handicapped ramp and stair are located at the south side entrance, and concrete stair are at a north side door. Three pairs of double wood paneled doors serve the entry, a newer metal door is at the south entrance and a wood door is at the north side entrance. The roof was replaced with asphalt shingles in 1997. The choir loft was inaccessible at the time of inspection. There are reported leaks to the roof in the northwest and southeast corners. There is also staining to the ceiling in the southwest corner of the sanctuary. The roof is 13 years old and is approaching the end of its service life. The brick work is also in good condition. There is a minimal amount of re- pointing required to the exterior walls, given the age of the building. The majority of the re- pointing work is needed at the joints of the glazed tile trim at the roof eaves, behind a few downspouts, the belt course, and at a few windows. There is an isolated crack in the masonry in the lower wall of the southeast corner. The windows are painted fixed wood windows. The arched windows have a small operable vent in the lower section. The windows are protected by Plexiglas panels that have faded with time. The steeple needs painting, yet appears to be weather -tight. Canopy roofs cover the two side entrances that are in need of repair due to deterioration of the underside soffits probably caused by water leaks. The rear of the church has a one story bump -out with a slate roof and copper flashing, which seems to be in serviceable condition. Shrubs in front of the building should be trimmed back to avoid the build -up of mold and any moisture infiltration. The exterior grade around the building should be regarded to direct water away from the building, again to prevent water /moisture infiltration to the interior. Interior of the church is in overall good condition with no apparent deficiencies, except as mentioned above. Sacred Heart Church and Rectory Page 6 EDA Project No. 10 -11 March 22, 2010 The Rectory The rectory is comprised of a two story brick and wood framed structure in the front of the building and a one story wood framed structure in the rear. The one story portion apparently is the original section, has a stone foundation, crawl space, vinyl and wood siding, a pitched asphalt shingled roof, wood casement windows, two overhead garage wood doors and a small shed addition to its rear, also with an overhead garage door. The two story section has a brick fagade, vinyl sided gable ends, slate pitched roof, aluminum corner boards, front entry porch with square wood columns, concrete stairs, iron railings, side and rear entry enclosed porches and concrete stairs, aluminum window trim and vinyl double -hung replacement windows. Gutters and downspouts connect to an underground drainage system which is concealed from view. Sacred Heart Church and Rectory P age 7 EDA Project No. 10 -11 March 22, 2010 The building exterior is in fairly good condition. The oldest section's wood siding and windows require painting as well as the wood trim at the roof eaves of the two story building. The brickwork is in good condition. The roofs appear serviceable with no apparent evidence of recent leaks on the interior. The remaining interior spaces are also in fairly good condition. Some minor peeling paint and cracked wall plaster were found that should be repaired/painted. The attic has signs of a small fire on top of a storage platform. The damage is not extensive, and seems limited to the platform and roof joists and decking above. The damage has not been repaired. The basement concrete floor slab is cracked and broken in a few places. This report also addresses the conversion of the rectory to office use. The change in use from what is considered a residence to an office or business use will trigger the requirement for accessibility and building code updates. A full code review would be required to determine the extent of all of the code implications. The entrance and second floors are not presently accessible, nor any toilet rooms. An exterior ramp or lift must be added to gain entry to the building. The side or rear doors would be recommended as entry points due to their . proximity to the parking areas. A limited use elevator would be recommended to serve access to the second floor. Locating the lift on the exterior of the building would provide the advantage of not having to take away valuable interior space and allow the majority of the construction to be on the outside. Further investigation may be warranted regarding available electrical service requirements for the lift. Office program requirements and spatial needs would have to be provided prior to a final interior office design could be completed. Sacred Heart Church and Rectory Page 8 EDA Project No. 10 -11 Mar 22, 20 OPINION OF PROBABLE. CONSTRUCTION COST The Church 1. Church Re -Roof approximately 9,675 sf of roof area x $8.00 /sf = $77,400. Complete strip and replacement of asphalt shingles and sheet metal work. 2. Church Re- Pointing approximately 10,290 sf of masonry wall area x 8% requiring re- pointing = 823 sf. 823 sf x $13 /sf = $10,699. 3. Church Steeple and Window Painting Budget $35,000. 4. Church Site Work Budget $5,000. 5. Concrete Slab in Crawl Space: $4,790. 6. Canopy Re -Build $1,670. 7. Entry Stair Repair $1,750. The Rectory 1. Rectory Repairs/Painting Budget $8,000. 2. Rectory Accessibility (Exterior Limited Access Lift with Enclosure, Exterior Ramp, (2) Bathroom Renovations) 3. , Structural Repairs to Framing in Family/Living Room (Columns, Footings, Concrete Slab) 4. Demo East Storage Addition $4,800. 5. Slate Roof Repair $1,200. 6. Chimney Rebuild $2,750. 7. Chimney Repointing $ 890 8. Roof Framing Fire Damage Repair Budget: $3,500. General Conditions $65,000. $5,175. 1. Bonding, Insurance, Cutting, Patching, Temporary Facilities, Project Cleaning, Contract Close -Out, and Overhead & Profit (OH&P) 30% of Construction Cost = 0.30 x $ 227,624. = $ 68,287. 20 Contingency 1. Hidden and Unforeseen Conditions 15% of Construction Cost = 0.15 x $ 227,624. = $ 34,143. 60 Total Cost of Repairs, Reinforcement, and Rehabilitation of the Church & Rectory 1. Church = $136,309. 2. Rectory= $91,315. 3. General Conditions and Contingency = $102,430. 4. Grand Total = $330,054. Sacred Heart Church and Rectory page 9 EDA Project No. 10 -11 March 22, 2010 Appendix `A' PHOTOGRAPHS (Structural) Sacred Heart Church and Rectory Page 10 EDA Project No. 10 -11 March 22, 2010 Sacred Heart Church Photo No. 1- One of Two Entry Columns - Deteriorated Tile Sacred Heart Church and Rectory Page 11 EDA Project No. 10 -11 March 22, 2010 Photo No. 2 - Column Base - Deteriorated Tile Sacred Heart Church and Rectory Page 12 EDA Project No. 10 -11 March 22, 2010 Photo No. 3 - Tower Base Requiring Painting. and New Flashing Photo No. 4 - Typical Condition Requiring Brick Joint Re- Pointing Sacred Heart Church and Rectory Page 13 EDA Project No. 10 -11 March 22, 2010 Photo No. 5 - Side Entry Canopy Photo No. 6 - Diagonal Veneer Crack Sacred Heart Church and Rectory Page 14 EDA Project No. 10 -11 March 22. 20 10 Photo No. 7 - Column Wrap Separation Photo No. 8 - Typical Crawl Space Showing Dirt Floor I f q t " r Sacred Heart Rectory Photo No. 11- One of Two Chimneys Requiring Rebuilding. Sacred Heart Church and Rectory Page 16 EDA Project No. 10 -11 ..Mar_ch_22,201.0 Photo No. 10 - Wavy Roof Plane and Poor Slate Condition. . � m z_ . .... . : fg .§ `. . +� Ar - � jjjj�