Sacred Heart Rectory Preferably Preserved Notification and supporting filesPL- ANNINO AND _DEVELOPMENT CITE- -OF NORTHAMPTON - - -- -- -
planning • conservation • zoning • northampton G1S • historic • community preservation • central business architecture
Sarah I. LaValley, Conservation, Preservation, & Land Use Planner • siavalley@NorthamptonMA.gov 413- 557 -1263
July 14, 2010
Louis Hasbrouck
Northampton Building Commissioner
Puchalski Municipal Building
212 Main Street
Northampton, MA 01060
RE: Historical Commission demolition review, Sacred Heart Rectory
Louis:
In accordance with Chapter 161 of the Northampton Ordinance, "Demolition," the Historical
Corrunission held a hearing July 13 to determine "Preferably Preserved" status following an
initial determination of significance. The Commission voted that the rectory is Preferably
Preserved according to the Ordinance, and enacted a 12 -month demolition delay. A demolition
permit may not be issued until June 7,2011; one year from the initial application date. A copy
of the Activity Tracking Sheet is enclosed.
The Historical Commission wanted to communicate that the 12 -month delay applies only to the
main rectory structure. Removal of the attached garage building and subsequent additions to
the rear of the structure are permissible under the Ordinance, and it appeared as though their
demolition may help to provide room for building or parking to the rear of the rectory in the
coming year, while plans for the building are being finalized. Please contact me if permits for
the removal of these additional elements are filed.
Thanks very much
V
Sarah LaValley
Conservation, Preservation & Land Use Phumer
Enclosures: Demolition Review Application Activity Tracking Sheet, Rectory
Cc: Edward Etheredge, Esq.
Ed Skroski
Central Business Architecture Committee
Ronan Catholic Bishop of Springfield
Reverend Joluz Conriors, St. Elizabeth Ann Seton Parish
DEMOLITION REVIEW APPLICATION
Activity Tracking Sheet
Property: 101 King Street, Sacred Heart Rectory
Map: 31B Parcel: 159 Year Built: 1850
Received in Building Department: June 7, 2010
Referred from Building Department: June 11, 2010
Action Taken/ Northampton Historical Commission
Action Taken Bv : V Entire Commission
Sub - Committee of the Commission
Commission Designee/ Staff
Date Action Taken June 21, 2010
Initial Determination
June 21, 2010
Public Meeting held
July 13, 2010
Public Hearing Held
Determination Made
Property has been determined not to be
Significant according to Ordinance definition.
No further action will be taken. Demolition
Permit may be issued.
Property has been determined to be Significant
according to the Ordinance definition and a
Public Hearing has been /will be scheduled.
Demolition Permit may not be
issued at this time.
Public Hearing has been held, Property was
determined Significant but not Preferably
Preserved. No further action will be taken/
Demolition Permit may be issued.
Photo documentation may be required.
Public Hearing has been held. Property has
been deemed to be Preferably Preserved. The
demolition review period has been initiated. No
demolition permit may be issued until the
Historic Commission approves an alternative plan or the
twelve month period concludes.
Alternate plan has been approved/ delay terminated.
Demolition may or may not be approved as part of plan.
Twelve month time period has expired, demolition
permit may be issued. /
Referred by: Y Date
Rectory
1. Name of Applicant: /-c.V
Address: 3�- �Z %�o v-�i� a -z.► Telephone:
2. Owner of Property: tq �a
Address: lephone: '732
3. - Status of Applicant: Owner Contract Purchaser Lessee Other (explain) R404 , `s
4. Job Location:
5. Existing Use of Structure /Property: v f-cf-d-W 2 .
6. Description of Proposed Use /Work/Project/Occupation: (Use additional sheets if necessary):
.p�€i�o�sff
7. 'Attached Plans: Sketch Plan Site Plan Engineered /Surveyed Plans
t•e' 4 #c.7 7 - 02/C4 4 4P rn�. �S✓ �
8. Has a Special Permit/Variance /Finding ever been issued for /on the site?
NO DONT KNOW YES IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DONT KNOW YES
IF YES: enter Book Page and /or Document #
9.Does the site contain a brook, body of water or wetlands? . NO _ DONT KNOW YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained , date issued: .
(Form Continues On Other Side)
W:\Documents\FORMS \original\ Building - Inspector\ Zoning - Permit- Application - passive .-doc 8/4/2004
t•
Please type or print all information and return this form to the Building
Inspector's Office with the $I5M' Ingfee (check ormoney order) payable to the
City ofNorthampton
IF YES, describe size, type and location:
11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common
plan of development that will disturb over 1 acre? YES NO
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
Tbb 4column reserved
for use by Me Building
Department
�
%1
13. Certification: 1 hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: �° � �6 Applicant's Signature
NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health, Conservation Commission,
Historic and Architectural Boards, Department of Public Works and other applicable permit granting
authorities.
W :\Dor ments\FOAMS\origirW\Building- Inspector\Zoning- Permit - Application- passive.doc . 8/4/2004
EXISTING
PROPOSED
, r� <.Y
.0 '� �wti Kc Fi•
�
Lot Size :.�a•
�} f
`Y�l��i
'
Frontage
i
Setbacks Front
Side
L: R:
L: R:
*_ +� 1 �•
Rear
Building Height
Building Square Footage
% Open Space: (lot area
i
minus building & paved
p arkin g
# of Parking Spades
# of Loading Docks
Fill:
(volume & location)
13. Certification: 1 hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: �° � �6 Applicant's Signature
NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health, Conservation Commission,
Historic and Architectural Boards, Department of Public Works and other applicable permit granting
authorities.
W :\Dor ments\FOAMS\origirW\Building- Inspector\Zoning- Permit - Application- passive.doc . 8/4/2004
July 13, 2010
HAND DELIVERED
Barbara Blumenthal, Chair
Northampton Historic Commission
212 Main Street
Northampton, MA 01060
Re: St. Elizabeth Ann Seaton Parish
- Application under Chapter 61
Dear Ms. Blumenthal:
This letter is to confirm that the applicant, St. Elizabeth Ann Seaton Parish, and
the property owner, Roman Catholic Bishop of Springfield, make this application without
waiving any rights under 42 U.S.C. 2000, et. seq., the Religious Land Use Act and
Massachusetts Declaration of Rights and United States Constitution. See Attorney
General v. Desilets, 418 Mass. 316, 322 (1994).
Very truly yours,
Edward D. Etheredge
EDE/kap
cc: Sarah LaValley
client
Etheredge_ &_Steuer,_ P.C.
ATTORNEYS AT LAW
64 GOTHIC STREET
NORTHAMPTON, MASSACHUSETTS 01060
EDWARD D. ETHEREDGE
(413) 584 -1600
FAX (413) 585 -8406
SHELLEY STEUER
ed@noholaw.com
ss@noholaw.com
WHEATLY R, GULMI- LANDY'
wheatly @noholaw.com
'Also Admitted in New York
Also Admitted in California
July 13, 2010
HAND DELIVERED
Barbara Blumenthal, Chair
Northampton Historic Commission
212 Main Street
Northampton, MA 01060
Re: St. Elizabeth Ann Seaton Parish
- Application under Chapter 61
Dear Ms. Blumenthal:
This letter is to confirm that the applicant, St. Elizabeth Ann Seaton Parish, and
the property owner, Roman Catholic Bishop of Springfield, make this application without
waiving any rights under 42 U.S.C. 2000, et. seq., the Religious Land Use Act and
Massachusetts Declaration of Rights and United States Constitution. See Attorney
General v. Desilets, 418 Mass. 316, 322 (1994).
Very truly yours,
Edward D. Etheredge
EDE/kap
cc: Sarah LaValley
client
PAS NING -AN DEVELOPMEN CITY of 1\ToRTHA i -YrON- -
planning • conservation • zoning • northampton GIs • historic • community preservation • central business architecture
Sarah I. LaValley, Conservation, Preservation, & Land Use Planner • slavalley@NorthamptonMA.gov • 413- 587 -1263
June 30, 2010
Reverend John Connors
Pastor, Saint Elizabeth Ann Seton Parish
3 Elm Street
Northampton MA, 01060
RE: Historical Commission demolition review, 91 and 101 King Street: Menard Center, Rectory,
and Christian Life Center
Dear Reverend Connors:
In accordance with Chapter 161 of the Northampton Ordinance, "Demolition," the Historical
Commission at their June 21 meeting evaluated the three structures for which you filed
demolition applications with the building inspector. Enclosed please find notification of the
Commission's determinations. These were provided to the Building Inspector on June 22.
The Menard Center was not determined to be significant under the Ordinance. No further
action on this structure is required by the Historical Commission.
The Christian Life Center, although of interest to the Historical Commission, is located within
the Central Business District. According to 161 -3 C of the Demolition Ordinance, "Applications
for demolition within the Central Business Architecture District will be reviewed by the Central
Business Architecture Committee." The Central Business Architecture Committee has
scheduled a public hearing regarding the proposed demolition for July 14 at 7:00 PM in Council
Chambers.
The Historical Commission determined that the rectory is a Significant structure in accordance
with the Demolition Ordinance. The Commission will now hold a public hearing to determine
whether the building is "Preferably Preserved." This hearing is set for July 13 at 6:30 pm, in the
JFK Middle School Community Room; an agenda is enclosed. A determination as to whether
the rectory should be Preferably Preserved must be made within fourteen days of the hearing.
Section 161 -5 D of the Ordinance lists some evidence that the Commission might consider when
making its determination of Preferably Preserved status. These includes, but aren't limited to,
the rectory's condition, age, role in the streetscape, and construction elements. It would be
helpful if you could provide any information you think would be useful for the Commission to
review, including structural analyses and site plans. If these can be provided the week prior to
the hearing, they will be included in packets for members to review in advance.
i
I,
Thank you for taking the time to participate in the Commission's site visit last week. Please let
me know if I can provide any assistance prior to the hearing.
l a alley
Conservation, Preservation &Land Use Planner
Enclosures: Demolition Review Application Activity Tracking Sheet, Menard Center
Demolition Review Application Activity Tracking Sheet, Rectory
Historical Commission Agenda, July 13
Cc: Louis Hasbrouck, Northampton Building Commissioner
Ed Skroski
Central Business Architecture Committee
Roman Catholic Bishop of Springfield
— _ -- --
vw:NorthamptorrlVIa:gov• Fax413 =587= 12Ci4 - - - -- --- - - - - --
DEMOLITION REVIEW APPLICATION
Activity Tracking Sheet
Property: 101 icing Street, Sacred Heart Menard Center
Map: 31B Parcel: 159 Year Built: 1900
Received in Building Department: June 7, 2010
Referred from Building Department: June 11, 2010
Action Taken/ Northampton Historical Commission
Action Taken By : V Entire Commission
Sub - Committee of the Commission
Commission Designee/ Staff
Date Action Taken to 0'� l� d� ltd Initial Determination
, o pt o l O Public Meeting held
Public Hearing Held
Determination Made /'
V Property has been determined not to be
Significant according to Ordinance definition.
No further action will be taken. Demolition
Permit may be issued.
Property has been determined to be Significant
according to the Ordinance definition and a
Public Hearing has been /will be scheduled.
Demolition Permit may not be
issued at this time.
Public Hearing has been held, Property was
determined Significant but not Preferably
Preserved. No further action will be taken/
Demolition Permit may be issued.
Photo documentation may be required.
Public Hearing has been held. Property has
been deemed to be Preferably Preserved. The
demolition review period has been initiated. No
demolition permit may be issued until the
Historic Commission approves an alternative plan or the
twelve month period concludes.
Alternate plan has been approved/ delay terminated.
Demolition may or may not be approved as part of plan.
Twelve month time period has expired, demolition
permit may be issued.
a
Referred by: " I , � � Date
DEMOLITION REVIEW APPLICATION
Activity Tracking Sheet
Property: 101 King Street, Sacred Heart Rectory
Map: 31B Parcel: 159 Year Built: 1850
Received in Building Department: June 7, 2010
Referred from Building Department: June 11, 2010
Action Taken/ Northampton Historical Commission
Action.Taken By : Entire Commission
Sub - Committee of the Commission
Commission Designee/ Staff
Date Action Taken �VKL Ll , X 610 Initial Determination
A t4 V-9 5L (, aDlo Public Meeting held
Public Hearing Held
Determination Made
Property has been determined not to be
Significant according to Ordinance definition.
No further action will be taken. Demolition
Permit may be issued.
Property has been determined to be Significant
according to the Ordinance definition and a
Public Hearing has been /will be scheduled.
Demolition Permit may not be
issued at this time.
Public Hearing has been held, Property was
determined Significant but not Preferably
Preserved. No further action will be taken/
Demolition Permit may be issued.
Photo documentation may be required.
Public Hearing has been held. Property has
been deemed to be Preferably Preserved. The
demolition review period has been initiated. No
demolition permit may be issued until the
Historic Commission approves an alternative plan or the
twelve month period concludes.
Alternate plan has been approved/ delay terminated.
Demolition may or may not be approved as part of plan.
Twelve month time period has expired, demolition
permit may be issued.
Referred by: d l�Gl v� Date a'� c} 'J l o
PLANNING AND DEVELOPMENT • CITY OF NORTHAMPTON
planning • conservation • zoning • northarnpton CIS • historic • community preservation • central business architecture
Sarah I. LaValley, Conservation, Preservation, & Land Use Planner • slnvalle) • 413 -557 -1263
Northampton Historical Commission
Meeting Notice
DATE: Tuesday, July 13, 2010
TIME: 6:30 PM
PLACE: JFK Middle School Community Room, 100 Bridge Road, Florence
For questions contact:
Sarah LaValley, slavalley @northamptonma.gov or
Barbara Blumenthal, bblument @smith.edu
Agenda
1. Public Comments
2. Approval of Minutes of June 21, 2010
3. Public Hearing:
To determine whether the Sacred Heart Rectory, 101 King Street, Map ID 31B -159,
should be determined "Preferably Preserved" pursuant to the Northampton Demolition
Ordinance, Chapter 161 of the General Code.
4. Review of Mail
S. Other business
City Hall • 210 Man1 Street, Room 11 • Northampton, MA 01060 • www.Northampton:Ma.gov • Fax 41.3 - 587 -1264
original printed on recycled paper
F0RX B .___ 7 _ BUILD1NG
MASSACHUSETTS HISTORICAL COMMISSION
Office of the Secretary, State House, Boston
4. Map. . Draw sketch of building location
in relation to nearest cross streets and
other buildings. Indicate north. I
✓t n YLIVI+b V I
yo
t
W
z
D
r�iZrcrH T'
C�
LT
USGS Quadrant
MHC Photo no,
st " John; 'Hopki ng Hou
ent use Rectory
ent owner Oman Cathol c` Iii shad
6f Springfield
ription:
c, 1830
Durce ''visual eyi. dente
Gre R-vrr v
Architect _I saac Damon nr '1 h ma pratt
Exterior wall fabric bri ck
Outbuildings (describe) none.
Other features 2 stories; 5 bays wide;
enclosed pediment; single end
...=-- chimti,ey�_: - de.ta.3.�led- ..entran"cewav .. _ --
es =bri ck, nd
Altered a uminum si cin , Date
Moved no Date
5. Lot size:
Less than one acre Over one acre x
Approximate frontage
Approximate distance of building from street
50 feet
6. Recorded by Co Dubie
Organization Northampton Historical
(�ommission
Date An P OE W E D ,`i
MAY 5 1976
MASS. H1ST. COMM.
a-.
2� D by A ID`
-
_ ---- - - - -
-- -- - - - - -- - - -
R - t t-t•
THIS SPACE
(over)
st " John; 'Hopki ng Hou
ent use Rectory
ent owner Oman Cathol c` Iii shad
6f Springfield
ription:
c, 1830
Durce ''visual eyi. dente
Gre R-vrr v
Architect _I saac Damon nr '1 h ma pratt
Exterior wall fabric bri ck
Outbuildings (describe) none.
Other features 2 stories; 5 bays wide;
enclosed pediment; single end
...=-- chimti,ey�_: - de.ta.3.�led- ..entran"cewav .. _ --
es =bri ck, nd
Altered a uminum si cin , Date
Moved no Date
5. Lot size:
Less than one acre Over one acre x
Approximate frontage
Approximate distance of building from street
50 feet
6. Recorded by Co Dubie
Organization Northampton Historical
(�ommission
Date An P OE W E D ,`i
MAY 5 1976
MASS. H1ST. COMM.
10. Bibliography anal /or references (such as. local histories, deeds, assessor's records,
early maps, etc.) picturesque Hamp shire Forbes Library.
Obituary of Thomas Pratt, 12/8/186&; article on
William Fa Pratt, 12/26/1565; Hampshire Oateti:e
David Oa Merril. a Isaac Damon and the Architecture
of the Federal Period in New England Yale University
dissertation. At Northampton Historical Society,
O
O
O
O
-I
D
2
ZZZZZZ
0
.m.'om
N
-I
D
mmm
O
o00
c
0
A NN
_0
m
--I
D
=
Cn
-I
MmM
vvv
m
-i
- Am
HD
x
;o
m
m
c
D_.
v ow
DDO
a
_____.m_.
-
a)i
Z-no
z
_-i -
D
vcn
°
mmn
o
O P-
m
3
c
D
m
�
O
<
3
m
z
--i
z
m
••
m
70
<
mmmmmm
000000
C m
�r
m
m
N
<n
m
••
<
Hz
o- 1.A
D
D
(/�
X
v
D
z�
mmmmmm
3
W
C710JJ
N
c o
m
ON
-
n
[n
N
T
N
8vZ
0411NW
m
D
O
N
C)
�i
N
\
3
fi7
N
o
r
C
3
D
w
°
D
v
�
0
v
0
DODO
r
0
W
O
O
O
O
m
m m
2
ZZZZZZ
0
N
O
<
v
z
-I
w
.O
cn
0
mmmmmm
OS
Z<
J
m
D
r
D
O
D
A
3
D
vcn
D
o
W
m
c
m
D
3
<
m
Cl
m
••
m
70
<
mmmmmm
000000
C m
r
m
m
••
mmmmmm
Hz
o- 1.A
D
(/�
m
v
D
m
mmmmmm
rn
C710JJ
N
OOrOf
m
-
n
T
8vZ
m
D
m
D MCI
fi7
z
r
-j�0-
m
�
0
v
0
DODO
r
0
W
2
N
1
-r\)--
<
W
O
i
- moo
D
m
0
co
-I -1-1 -I 4141 -I --I
m
�
N
c
m
m
r
;o
;a
rr- -i
00000000
W
D
ZZ -D-I�
rc7vvDD
v\mmr
- N
W.10J
m
CDM-
- w-I
;a
-
I
D
0 0
3
0
m
D 0 0 0
owrn(O
-
w
W(O.1
O
w
o
ZC C)DD
- �O)
W-POO
'O
C
m
m
cn
D
0 <
Z
\
J J J O
m
D
O
T
D-I;0•
A
>
H
z
2
n o
��
O
°
D
f
D
-
Z
m N
-Zi
H
°�
°
0
� r
v
mmmaw
m
v
i;
'
-
Z
<
D
n
(O(O(OJ
L7
°
m m
�
nnn"
Z
-j
-I
-
z
c
A
S
N
3
mmm70C
D
D
T
!D
n
➢
m
D
-
m
z �.,
Oz*km W
I
r
D
_
r
°
cfl
MW
Z
-
D
or
0
WN�m
I I 1
DCD-
rzmr
W
-I
0
J41
r
z
C
m
z
O
a
O
•
mm
m
mmmm
HH v
Z
00
D
C)
- 5
z
C/A
-i
mmm-
-ism-
<Cn -0
m
Z
°
m
x
P N
000 0
<
-
N
H
r
mmm-
O
m
W WVt
O
CL
D
W
OOOZ
� -
D
(
r
-
ornww
(OWrn
C)
c
-I
33307
Cncncn-
D
v
ZZZZ222Z
0000zzzo
S
m
r
c
OWN
-i
0
w
00- -0100
m
m -
zzzz\\\z
D
m
m
;a
o
C (Z7
O0
z
➢
cn
- z
mmmm-cni-cniom
ti
Cl)
W
3 3
n
z
z
m m
m
_
DD D
33 3
0
O
.'o
co
H D
m
D
co -<
Ul
ZZZZCCCz
z v
v E
z
-I
v
v
cm
HD
® - O -
c000zzzo
zzzZ - - -z
D
r
mmmmmm - I - Im
D -
03
D
-mf•_o
0
w
o
m
m m
2
ZZZZZZ
0
N
O
<
v
z
-I
w
.O
cn
0
mmmmmm
OS
Z<
J
m
D
r
D
D
3
mmmmmm
vcn
D
o
W
m
c
m
D
m
Cl
m
••
m
70
<
mmmmmm
000000
C m
NN N
D
m
••
mmmmmm
Hz
o- 1.A
m
mmmmmm
rn
C710JJ
N
OOrOf
T
8vZ
D MCI
z
r
-j�0-
�
m
°
- moo
m
<
c
m
m
D
I
c
ZZ -D-I�
rc7vvDD
v\mmr
- N
W.10J
Z
CDM-
- w-I
;a
-
I
D
m
m
= DMZ
owrn(O
W(O.1
O
w
o
ZC C)DD
- �O)
W-POO
'O
>;
m
cn
H O CI�
000 o
m
C/)
T
D-I;0•
D
r
m
H
z
n o
��
O
D
-
Z
m N
-Zi
� r
v
()I (n Ul-1
i\S
H
0 Z
i;
-N i
-
Z
<
D
(O(O(OJ
L7
°
m m
�
m
ou
r
A
3
N
3
m
n
➢
OlW
D
m
_
r
°
H
MW
Z
-
D
J41
z
410)
O
Z-
•
J M
00
m
C
P N
000 0
<
N -
O
W WVt
D
W
(n (n U
r
-
ornww
(OWrn
C)
c
-I
WO NODOI
°
OWN
A
00- -0100
-I
4101J
m
000
- z
"O
D
0
m
m
r
_w
W
0
I
O
O
O
H
Z
N
r
O
(o
C
7
cF
(n
N
in
m
rn
O
c7
m
a
O
- Ii
Lo
0
rn
\
N
n \_
3 O
3
r'n�
>W
H (O
C 3
A
r t�
r�0
0
m
m
{
Z
C-)
0
U
°
C)
D
iL7
°
Z
0
-
2
D
3
0
O
Z
3
ti
ti
2
C
cn
m
m
m
m
m
H
m
°
D
-I
m
O
D
r
C
m
C�
D
Z _
C
D
-�G
(ov
(OD
Om
1 �
JUN 2 5 2010 1
Conditions Assessment Report
Sacred Heart Church and
Rectory
�1
99 King Street
Northampton, Massachusetts
Prepared For.•
Diocese of Springfield
63 Elliot Street
Springfield, MA 01105
Prepared By.
Engineering Design Associates, Inc.
11 Central.Street
West Springfield, Massachusetts
in association with
Reinhardt Associates, Inc. (Architects)
430 Main Street
Agawam, Massachusetts
Project No. 10 -11
March 22, 2010
INTRODUCTION
The Diocese of Springfield requested that Engineering Design Associates, Inc. (EDA) conduct a field investigation
to assess the physical condition of the Sacred Heart Church and the Rectory located on King Street in
Northampton, Massachusetts. This review is limited in scope and will be conducted to the extent necessary to
render an opinion regarding the structural integrity of the two buildings. At no time shall it be, construed that
Engineering Design Associates, Inc., in providing our services, is attesting to the load carrying capacity of the
structural members used in the construction since no design -check calculations will be performed. EDA
contracted with Reinhardt Associates, Inc. (RAI), architects from Agawam, Massachusetts, to provide their
expertise in evaluating the building envelopes and architectural components.
On the 12"' of March, EDA and RAI visited the property and made visual observations of Church and Rectory.
Photographs were taken to document and record the general condition as well as the distressed areas. All
descriptions of the site conditions present herein accurately reflect the observations as of the latest date of its on-
site visits. For the purposes of this report, the front of the building (cover photograph) will be referred to as the
West Elevation.
Sacred Heart Church and Rectory - - Page 2
EDA Project No. 10 -11
FIELD OBSERVATIONS
FDA's initial field observation was performed on 12 of March. The Church was the first building to be
investigated. There was access to view the roof framing via a catwalk and the first floor framing was also
accessible to view. The Rectory was next to be investigated. The roof framing was viewed from the attic. The
second floor framing was not accessible due to ceiling finishes. The first floor framing was also not accessible due
to a lath and plaster ceiling in the basement. Photographs were used to document the various conditions observed
(Appendix 'A').
The Church
The conditions assessment of the Church began with the roof framing. The framing was viewed from a catwalk that
was constructed above the ceiling within the framing members. The main support system for the roof consists of
steel trusses that support heavy timber wood secondary beams.'The timbers in turn support tongue and grooved
wood planks that is the roof sheathing. Past water infiltration was noted as staining of the timber beams and
planking was evident. Two sections of planking were replaced toward the domed tower, apparently when the
Church was re- roofed. From the catwalk, this reporter proceeded to the lower level of the domed tower by way of
a ladder and an opening in the tower floor. The tower is heavy timber framed with a wood clad interior. The
timber members were in generally good condition and the jointing was tight.
The framing for the main level of the Church could not be observed due to wall and ceiling finishes. The condition
of the walls and ceiling was observed and all were in generally good condition with minimal cracks observed in
the plaster. Peeling paint was observed throughout the arches below the clerestory windows. The plaster
surrounding the column, located to the right of the Sanctuary, appears to have moved. There is an open joint
between the column wrap and wall. Water infiltration has damaged the plaster ceiling to the left of the Sanctuary.
Finally, the basement was investigated. There is a full basement level located beneath the Sanctuary and a crawl
space located beneath the remainder of the Church. Much of the framing beneath the Sanctuary was covered with
plaster ceiling but exposed steel beams were observed. The concrete slab on grade is cracked and uneven. The
floor framing above the crawl space was observed. The framing consists of steel beams supporting wood floor
joists. There were no cracks or checks observed in the floor joists. The steel beams are supported on steel
bearing plates that are anchored to brick piers. There is no concrete slab on grade within the crawl space. The
exposed soil is very fine silt that dusts up when disturbed.
The exterior of the building consists of brick veneer and structural glazed tiles. The roof is covered with asphalt
shingles. There are two free standing entry columns that are clad with structural glazed tile. The tile is also the
ceiling finish of the exterior portion of the entry. The west face of the structural glazed tiles of the columns show
signs of deterioration. Structural glazed the also covers the two side niches. The exterior entry steps are concrete
and appear that they have been repaired several times over the years. The domed tower is wood clad and is in
need of painting. The brick veneer above the clerestory windows needs repointing. The canopies covering the
two side entries show signs of deterioration. The underside of the plywood sheathing is water stained and the
plywood is delaminating. At the rear left corner of the Church there was a diagonal crack observed. The crack
appears to have originated due to some sort of differential settlement. This reporter was informed that a buried oil
tank was removed from this area and this could be the reason for the settlement. The crack does not appear to
have been repaired and does not appear to be active. The downspout located at the northwest corner of the
Church does not extend far enough to allow runoff to flow away from the Church. At this location the runoff has
eroded the soil and has created a large hole. Shrubs to the right and left of the entry are overgrown and need to
be cut back in order to prevent future deterioration of the building envelope.
Sacred Heart Church and Rectory Page 3
EDA Project No. 10 -11
March 22, 2010
The Rectory
The Rectory has a full basement, two framed floors and a walk -up attic. The basement is used for mechanical
equipment and storage and has a concrete floor. The foundation walls are comprised of a combination of stone
and brick. The upper floors are framed with wood floor joists, supported by exterior brick bearing walls, interior
bearing walls, and wood beams where dictated by the floor plan. The roof is framed with wood rafters supported
by a heavy timber framework and supporting the lx sheathing and slate roof.
The foundation walls are constructed with stone and brick. The foundation wall of the storage area in the boiler
room shows signs of water infiltration. The concrete slab on grade has cracks and is uneven. Several of the brick
piers have been replaced with concrete block piers. Several other brick piers have been re- pointed. The framing
for the first floor was hidden from view by a plaster ceiling. The rear portion of the Rectory has a Family/Living
room. The floor framing for this area is in poor condition. Additional support beams and temporary screw jacks
were added at some point in time. One column has since loosened and fell over.
Walking around the first floor, the floor appears uneven throughout the Rectory. The kitchen floor is covered with
ceramic tile and is uneven. There were no cracks observed in the tile or mortar joints. The other rooms in the
Rectory are covered with carpet and appear to slope. The furniture in the Dining Room was observed to be
uneven. As stated above, the framing for the first floor could not be observed so the exact cause could not be
ascertained. The framing for the second floor was also hidden from view by the ceiling finishes.
The roof framing consists of timber frames supporting roof rafters. The jointing of the timbers appeared tight.
There was evidence of a fire at some time in the past. The timber frames, rafters and sheathing all were observed
to be heavily charred. A small section of the sheathing was replaced due to fire damage.
The two story exterior walls of the Rectory are constructed using brick veneer and wood trim that had been clad
with aluminum. This portion of the Rectory has a slate roof. The roof plane is wavy, the ridge line is uneven and the
slates are uneven with broken and missing slates. There are two chimneys penetrating through the roof. The
chimney located in the southeast corner is in need of rebuilding while the chimney at the southwest corner needs
re- pointing. The one story rear section is clad with vinyl siding and the roof is clad with asphalt shingles.. The one
story section has the Family/Living room and a two car garage. There is a one story lean to addition at the east end
of the Rectory. This addition has a dirt floor with board and batten wood siding and an asphalt shingled roof.
There is an overhead garage door on the south side and the space appears to be used for storage. This addition is
in generally poor condition, the base of the siding is rotting and the garage door is buckling and is off the door
tracks.
STRUCTURAL EVALUATION
Overall, the Church is in generally good condition but the Rectory is in generally fair condition. Both buildings
require some remedial work.
The Church
The existing brick veneer is in need of some repointing, especially above the clerestory windows. The diagonal
crack at the southeast corner needs to be repaired in order to eliminate future water infiltration and monitored to
determine whether or not it is actively settling. The structural glazed tiles surrounding the two entry columns need
to be repaired to prevent water infiltration. Both canopies at the side doors need to be rebuilt and the plywood
sheathing needs to be replaced. Downspout extensions should be installed in order to drain the rain water away
from the Church. Re- grading of the perimeter of the Church should also be done, again to provide positive
drainage away from the Church. As for the issue with the dust created within the crawl space, this can be resolved
by either installing a new concrete slab on grade or attaching a damp - proofing material (system) to the underside
of the floor framing. Typically, the concrete slab, 2 to 3 inch thick, would be placed on a vapor retarding material.
The front concrete entry stairs need to be repaired in order to prevent tripping hazards. The mortar joints in the
exterior brick veneer, especially the joints above the clerestory windows, need to be re- pointed. The main roof
and each of the low roofs need to be stripped and re- shingled.
Sacred Heart Church and Rectory Page 4
EDA Project No. 10 -11
March 22, 2010
The Rectory
The Family/Living room floor framing needs to be re- supported with new permanent columns and concrete
footings. Positive connections between the beams and columns and between the floor joists and beams will also
be required. A new concrete slab on grade will need to be installed in this area of the basement. Since the reason
for the uneven first floor could not be determined the extent of the remedial work can not be addressed without
conducting some selective demolition. The roof framing timber frames and rafters that are charred from the fire
need to be cleaned and sealed. The slate roofing is in fair condition but broken and loose slate need to be
removed and replaced. Also, any missing slates need to be replaced. The two chimneys need to be rebuilt above
the roof line. The lean to addition on the east side of the Rectory needs to either be re -built or removed.
As part of the Assessment for the Rectory, we were asked to evaluate the feasibility of converting the existing
Rectory into offices. This change in use will trigger several aspects of the Commonwealth of Massachusetts State
Building Code. The first Code issue is changing from a single family residence which is governed by the One and
Two Family Residential Code to office which is governed by the Commercial Code. The next issue will be the
change in minimum floor loads. In addition, the building's lateral bracing system will need to be idenitified and
evaluated for compliance with the minimum loads per Code. The final issue that will be required for the structural
aspect to change the use of the building is the lateral force resisting system. Lateral loads are generated due to
wind and seismic.
BUILDING ENVELOPE STUDY
Introduction
Sacred Heart Church and Rectory are located at 101 King St., Northampton, MA. Reinhardt Associates, Inc.
(R.AI), architects of Agawam, MA was retained by Engineering Design Associates, Inc. (EDA), structural
engineers of West Springfield, MA to assist them in preparing a building condition assessment of the church
and rectory. On March 12, 2010, My -Ron Hatchett of RAI accompanied Andrew Pavlica, Jr. of EDA to conduct
an inspection of the building's exterior and interior existing conditions, took photographs and notations
describing the findings which became a part of this report.
Sacred Heart Church and Rectory Page 5
EDA Project No. 10 -11
March 22, 2010
EXTERIOR OBSERVATIONS
The Church
The Sacred Heart Church is a classical style building built in 1916. The main body of the building mass has of a
large gable roof with a large steeple on top, flanked by lower projecting wings on both sides covered by shed
roofs. The church has a large portico in the front, supported by two round glazed tile columns. The pitched roof is
covered with asphalt shingles with built -in gutters and copper and aluminum downspouts. The gable is trimmed
with glazes tile as well as the entablature and the trim around the eaves. The exterior walls are brick masonry laid
in a Flemish pattern with glazed tile belt courses. Clearstory wood windows occupy the upper portion of the
building and large stained glass arched windows dominate the main walls of the church. The front stairs are cast
in place concrete, a concrete handicapped ramp and stair are located at the south side entrance, and concrete
stair are at a north side door. Three pairs of double wood paneled doors serve the entry, a newer metal door is at
the south entrance and a wood door is at the north side entrance.
The roof was replaced with asphalt shingles in 1997. The choir loft was inaccessible at the time of inspection.
There are reported leaks to the roof in the northwest and southeast corners. There is also staining to the ceiling in
the southwest corner of the sanctuary. The roof is 13 years old and is approaching the end of its service life. The
brick work is also in good condition. There is a minimal amount of re- pointing required to the exterior walls,
given the age of the building. The majority of the re- pointing work is needed at the joints of the glazed tile trim at
the roof eaves, behind a few downspouts, the belt course, and at a few windows. There is an isolated crack in the
masonry in the lower wall of the southeast corner. The windows are painted fixed wood windows. The arched
windows have a small operable vent in the lower section. The windows are protected by Plexiglas panels that
have faded with time.
The steeple needs painting, yet appears to be weather -tight. Canopy roofs cover the two side entrances that are in
need of repair due to deterioration of the underside soffits probably caused by water leaks. The rear of the church
has a one story bump -out with a slate roof and copper flashing, which seems to be in serviceable condition.
Shrubs in front of the building should be trimmed back to avoid the build -up of mold and any moisture infiltration.
The exterior grade around the building should be regarded to direct water away from the building, again to
prevent water /moisture infiltration to the interior. Interior of the church is in overall good condition with no
apparent deficiencies, except as mentioned above.
Sacred Heart Church and Rectory Page 6
EDA Project No. 10 -11
March 22, 2010
The Rectory
The rectory is comprised of a two story brick and wood framed structure in the front of the building and a one
story wood framed structure in the rear. The one story portion apparently is the original section, has a stone
foundation, crawl space, vinyl and wood siding, a pitched asphalt shingled roof, wood casement windows, two
overhead garage wood doors and a small shed addition to its rear, also with an overhead garage door. The two
story section has a brick fagade, vinyl sided gable ends, slate pitched roof, aluminum corner boards, front entry
porch with square wood columns, concrete stairs, iron railings, side and rear entry enclosed porches and
concrete stairs, aluminum window trim and vinyl double -hung replacement windows. Gutters and downspouts
connect to an underground drainage system which is concealed from view.
Sacred Heart Church and Rectory P age 7
EDA Project No. 10 -11
March 22, 2010
The building exterior is in fairly good condition. The oldest section's wood siding and windows require painting
as well as the wood trim at the roof eaves of the two story building. The brickwork is in good condition. The roofs
appear serviceable with no apparent evidence of recent leaks on the interior. The remaining interior spaces are
also in fairly good condition. Some minor peeling paint and cracked wall plaster were found that should be
repaired/painted. The attic has signs of a small fire on top of a storage platform. The damage is not extensive, and
seems limited to the platform and roof joists and decking above. The damage has not been repaired. The
basement concrete floor slab is cracked and broken in a few places.
This report also addresses the conversion of the rectory to office use. The change in use from what is considered a
residence to an office or business use will trigger the requirement for accessibility and building code updates. A
full code review would be required to determine the extent of all of the code implications. The entrance and
second floors are not presently accessible, nor any toilet rooms. An exterior ramp or lift must be added to gain
entry to the building. The side or rear doors would be recommended as entry points due to their . proximity to the
parking areas. A limited use elevator would be recommended to serve access to the second floor. Locating the lift
on the exterior of the building would provide the advantage of not having to take away valuable interior space
and allow the majority of the construction to be on the outside. Further investigation may be warranted regarding
available electrical service requirements for the lift. Office program requirements and spatial needs would have
to be provided prior to a final interior office design could be completed.
Sacred Heart Church and Rectory Page 8
EDA Project No. 10 -11
Mar 22, 20
OPINION OF PROBABLE. CONSTRUCTION COST
The Church
1. Church Re -Roof approximately 9,675 sf of roof area x $8.00 /sf = $77,400.
Complete strip and replacement of asphalt shingles and sheet metal work.
2. Church Re- Pointing approximately 10,290 sf of masonry wall area x 8% requiring re- pointing = 823 sf.
823 sf x $13 /sf = $10,699.
3. Church Steeple and Window Painting Budget $35,000.
4. Church Site Work Budget $5,000.
5. Concrete Slab in Crawl Space: $4,790.
6. Canopy Re -Build $1,670.
7. Entry Stair Repair $1,750.
The Rectory
1. Rectory Repairs/Painting Budget $8,000.
2. Rectory Accessibility
(Exterior Limited Access Lift with Enclosure, Exterior Ramp, (2) Bathroom Renovations)
3. , Structural Repairs to Framing in Family/Living Room (Columns, Footings, Concrete Slab)
4. Demo East Storage Addition $4,800.
5. Slate Roof Repair $1,200.
6. Chimney Rebuild $2,750.
7. Chimney Repointing $ 890
8. Roof Framing Fire Damage Repair Budget: $3,500.
General Conditions
$65,000.
$5,175.
1. Bonding, Insurance, Cutting, Patching, Temporary Facilities, Project Cleaning, Contract Close -Out, and
Overhead & Profit (OH&P)
30% of Construction Cost = 0.30 x $ 227,624. = $ 68,287. 20
Contingency
1. Hidden and Unforeseen Conditions
15% of Construction Cost = 0.15 x $ 227,624. = $ 34,143. 60
Total Cost of Repairs, Reinforcement, and Rehabilitation of the Church & Rectory
1. Church = $136,309.
2. Rectory= $91,315.
3. General Conditions and Contingency = $102,430.
4. Grand Total = $330,054.
Sacred Heart Church and Rectory page 9
EDA Project No. 10 -11
March 22, 2010
Appendix `A'
PHOTOGRAPHS
(Structural)
Sacred Heart Church and Rectory Page 10
EDA Project No. 10 -11
March 22, 2010
Sacred Heart Church
Photo No. 1- One of Two Entry Columns - Deteriorated Tile
Sacred Heart Church and Rectory Page 11
EDA Project No. 10 -11
March 22, 2010
Photo No. 2 - Column Base - Deteriorated Tile
Sacred Heart Church and Rectory Page 12
EDA Project No. 10 -11
March 22, 2010
Photo No. 3 - Tower Base Requiring Painting. and New Flashing
Photo No. 4 - Typical Condition Requiring Brick Joint Re- Pointing
Sacred Heart Church and Rectory Page 13
EDA Project No. 10 -11
March 22, 2010
Photo No. 5 - Side Entry Canopy
Photo No. 6 - Diagonal Veneer Crack
Sacred Heart Church and Rectory Page 14
EDA Project No. 10 -11
March 22. 20 10
Photo No. 7 - Column Wrap Separation
Photo No. 8 - Typical Crawl Space Showing Dirt Floor
I
f
q t
"
r
Sacred Heart Rectory
Photo No. 11- One of Two Chimneys Requiring Rebuilding.
Sacred Heart Church and Rectory Page 16
EDA Project No. 10 -11
..Mar_ch_22,201.0
Photo No. 10 - Wavy Roof Plane and Poor Slate Condition.