16C-025 209 Spring Street Special Permit-ClusterPlanning - DecisionCity of Northampton Hearing No.:PLN-2010-0039Date: May 14, 2010 APPLICATION TYPE:SUBMISSION DATE: PB Special Permit with Intermediate 4/20/2010 Applicant's Name:Owner's Name: NAME: NAME: City of NorthamptonCordi Bean, Laurence Bean, Susan Libby et a ADDRESS:ADDRESS: 210 Main Streetc/o Bob Spence 5 East Pleasant Street TOWN:STATE:ZIP CODE:TOWN:STATE:ZIP CODE: NORTHAMPTONMA01060AMHER5TMA01002 PHONE NO.:FAX NO.: PHONE NO.:FAX NO.: EMAIL ADDRESS: EMAIL ADDRESS: Site Information:Surveyor's Name: STREET NO.:COMPANY NAME: SITE ZONING: 209/0 SPRING ST URA/WSP/WP TOWN:ADDRESS: ACTION TAKEN: NORTHAMPT0N MA 01060 Approved With Conditions MAP:BLOCK:LOT:MAP DATE: SECTION OF BYLAW: 16C025001 Chpt. 350-10.5: Open Space Residential TOWN:STATE:ZIP CODE: Development Book:Page: 2076256 PHONE NO.:FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK: TWO LOT OPEN SPACE RES DEVELOPMENT Other Deed books: 2058/225 4316/51 9119/199 HARDSHIP: CONDITION OF APPROVAL: 1) To comply with the traffic mitigation requirements in 11.6 2B and prior to the issuance of a certificate of occupancy for either of the two new lots, a payment of $2,000 for the one additional lot not allowed by-right shall be made to mitigate traffic impacts for the new lots. 2. )Prior to issuance of a building permit for either of the lots a site plan shall be submitted for review by staff with Planning Board Chair or designee to approve location of common driveway and ensure that the common driveway meets all the criteria in the zoning for width, pull offs, grades etc. Further, the plans must show that runoff from the driveway is directed on site and will not flow into Spring Street. 3.) Prior to issuance of a BUILDING PERMIT, the easements for maintenance of the driveway shall be recorded at the register of deeds. 4. )Prior to issuance of a BUILDING PERMIT or transfer of title of the lots, the owner must dedicate the proposed open space to the city as offered. 5.) If the grades for the driveway are 3% or greater within 100’ of the street , this portion must be paved. FINDINGS: The Planning Board approved the application for a special permit for a two-lot open space cluster to create 2 single family house lots based upon the plans and information submitted with the application. In granting the permit, the Board found that the following required elements had been met: (1) The requested use protects adjoining premises against seriously detrimental uses. If applicable, this shall include provision for surface water drainage, sound and sight buffers and preservation of views, light, and air; and (2) The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets, minimize traffic impacts on the streets and roads in the area. The project will consist of one common driveway to serve both lots. The project will mitigate traffic through payment in lieu of $2,000 (3) The requested use will promote a harmonious relationship of structures and open spaces to the natural landscape, existing buildings GeoTMS® 2010 Des Lauriers Municipal Solutions, Inc. Planning - DecisionCity of Northampton Hearing No.:PLN-2010-0039Date: May 14, 2010 and other community assets in the area. The two new single family house lots will be consistent with the structures along Spring Street and open space at the back will be permanently protected.; and (4) The requested use will not overload, and will mitigate adverse impacts on, the City’s resources including the effect on the City’s water supply and distribution system, sanitary and storm sewage collection and treatment systems, fire protection, streets and schools; and (5) The requested use meets special regulations set forth in; 10.5 Cluster. The project minimizes curb cuts by creation of a common driveway. The Conservation Commission recommended approval of the project. (6) The requested use bears a positive relationship to the public convenience or welfare. The use will not unduly impair the integrity of character of the district or adjoining zones, nor be detrimental to the health, morals, or general welfare. The use shall be in harmony with the general purpose and intent of the ordinance; and (7) If applicable, the requested use will promote City planning objectives to the extent possible and will not adversely effect those objectives, as defined in City master or study plans adopted under MGL c. 41, § 81C and 81D. COULD NOT DEROGATE BECAUSE: FILING DEADLINE:MAILING DATE:HEARING CONTINUED DATE:DECISION DRAFT BY:APPEAL DATE: 4/22/20105/6/20105/27/2010 REFERRALS IN DATE:HEARING DEADLINE DATE:HEARING CLOSE DATE:FINAL SIGNING BY:APPEAL DEADLINE: 4/29/20106/24/20105/13/20105/27/20106/3/2010 FIRST ADVERTISING DATE:HEARING DATE:VOTING DATE:DECISION DATE: 4/29/20105/13/20105/13/20105/14/2010 SECOND ADVERTISING DATE:HEARING TIME:VOTING DEADLINE:DECISION DEADLINE: 5/6/20107:00 PM8/11/20108/11/2010 MEMBERS PRESENT:VOTE: Marilyn Richardsvotes toGrant Katharine G. Bakervotes toGrant Stephen Gilsonvotes toGrant Jennifer Dieringervotes toGrant Mark Sullivanvotes toGrant Francis Johnsonvotes toGrant George Kohoutvotes toGrant MOTION MADE BY:SECONDED BY:VOTE COUNT:DECISION: George KohoutJennifer Dieringer7Approved with Conditions MINUTES OF MEETING: Available in the Office of Planning & Development. I, Carolyn Misch, as agent to the Planning Board, certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on the date shown above. I certify that a copy of this decision has been mailed to the Owner and Applicant. ___________________________________ Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt. 40A, Section 17 as amended within twenty (20) days after the date of the filing of the notice of the decision with the City Clerk. The date is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of Northampton. GeoTMS® 2010 Des Lauriers Municipal Solutions, Inc. MEMORANDUM, TO: Stephen Gilson, Chair, Planning Boar FR: James R. Laurila, P.E., City Engineer, BY: David K. Veleta, P.E., Environmental ng' 5rt( DA: April 29, 2010 RE: File: Spring Street — Two -Lot Cluster /open Space Residential Development — Special Permit and Site Plan Map ID: 16C -025 CC: file The Department of Public Works has reviewed the above referenced application for the following items: Traffic: Utilities: • Volume &Impact on City Street x Sanitary Sewer • Roadway Capacity x Water x Adequacy of City Road Construction x Drainage Into City Stormwater System • Site Distances x Capacity of Stormwater Line • Parking x Northampton Stormwater Permit • Driveway Openings NPDES Phase II Compliance Other: The Department of Public Works has the following comments: x No Concerns, project will not have an impact on any items reviewed Traffic Study is required Roadway does not have adequate capacity to handle the additional traffic Roadway is not adequately constructed to handle proposed increase in traffic Site Distances are not adequate for proposed project Parking spaces do not meet minimum requirements Parking spaces are too close to driveway opening Driveway openings are not adequate for proposed use Sanitary Sewer line is not adequately sized for proposed use Sewer line connection is not properly shown Water line is not adequately sized for proposed use Water line connection is not properly shown City stormwater system is not adequate to handle increase in drainage Stormwater system does not meet minimum requirements for reduction of Total Suspended Solids (TSS) Northampton Stormwater Management Permit has not been approved or conditions for approved permit have not been met Other Comments: 0000 Spring Street_ SpPerm_Site_ PB.doc Page 1 of 1 y AREA BETWEEN ' A CENTERLINE OF MILL RIVER AND RIVER BANK = 11,257± S.F. S' 7 9 I' i LEGEN 0 v MONUMENT FOUND y y y y y y TREE LINE AQ� A CALCULATED POINT STONE WALL IRS • IRON ROD SET EASEMENT LINES EDGE OF WATER 4. CLUSTER DEVELOPMENT COMPUTATIONS: AREA BETWEEN RIVER BANK AND A TWO LOT CLUSTER 0EVELOPMENT REQUIRES 160,000 S.F. OF WHICH 80,000 S,F. MUST DIGITIZED 100 YEAR FLOOD LINE BE OPEN SPACE, OF �HICH 60,000 MUST BE DEVELOPABLE. OPEN SPACE LOT B ' PROVIDES 74,894± S.F. = 23, 46 6± S.F. 100 YEAR FLOOD ZONE DIGITIZED - - - . FROM FLOOD INSURANCE RATE ,,' ', ►� MAP COMMUNITY PANEL NUMBER ;' �►'' 250167 0001 A N ! EFFEC11VE DATE APRIL 3, 1978 ! C3 f TWO DEVELOPED LOTSOTOTAL AREA = 43560 (1.0 ACRES) THEREFORE TOTAL OP SPACE REQUIRED = 116,440 (142313 PROVIDED) f TOTAL CLUSTER PROJ ' T AREA (EXLUCING LAND UNDER WATER) = 4.267 AC. OPEN SPACE LOT B: r TOTAL LOT AREA = 153,870± S.F. TOTAL LOT AREA = 1'42,313± S.F. (EXCLUDING LAND UNDER THE MILL RIVER) DEVELOPABLE LAND -� S.F. (EXCLUDING LAND BELOW THE 100 YEAR FLOOD ZONE AS DIGITIZED FROM FIRM ) G `262 C1 �y �\ \„'�� _ _ " _ -- — �• — -- — .�- \1 ate. '■— +r — — 1 _ '\ \ = \ �.. / "+ \ _ — ...�- _ �- � r _ —_ `+1 � _— -- _ _ -- � � \. _ � \ \ \ \ � \ \ OPEN SPACE PARCEL B WOODED d '/ /"^ _ _ `_�'' —'"� � — ^" ""- '•.�_�� —'�`� 1 \ `` `` ` \ �``�`` \�`�� ` `'\ `�\�'�. TIZED 1�}0 MARILYN B. EVERETT, CaRD1S L. BEAN AREA BETWEEN DIGI _ & ROGER H. BEAN YEAR; FLOOD LINE AND TOE OF A PORTION OF DEED 2058N225 DATE / ^3 , SLOPE =74 894± S & DANIEL F. STASZ RPLS# 47160 HELEN M. BEAN & SUSAN BEAN FOUNTAIN A PORTION OF DEED 4316M51 I o \ \ \, \ \ \. \ \���, \ \ \ \\\;_\ •, ` WOODED LINDA BEAN N: 2,951,8$8.3 ---- 8' 1 . `` \ \`� \ \` ` ��.�: \ \ \� `. ___--------- t` �,\�.�,��\� \ \ \ \ \``: =__:.\ \ \` , , A PORTION OF DEED 9119199 16A E. 334,047.59" LOTS 1 -15 AREA - 153 SO. FT. 3.532± ACRES FAIRWAY VILLAGE CONDOMINIUM �. o \ `'.� _ _ ^ � � �'�,,�'`�;'�;1 ;;` =\ ��.■ \, �,� � DEED 2539220 I } ---_ -- :•� ����.� \`•� OPEN SPACE ASSOCIATED E J PLAN 131 rj26 \ !' ` \ \� � ' ' WITH LOTS 1 8c 2 ' ��,, ,, \_ _ \ \. • a �� PLAN 13520 \ \1 \\ \_ ` \ \ _ \\ , \ �= -NOT A BUILDING LOT- • \ •'• `. ` ` ` ` ` '` BOTTOM OF SLOPE BASED ON CURRENT TOPOGR - A IC FIELD NO 1. FIELD SURVEY BY EDM TOTAL STATION. 2. THIS PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND IS SUBJECT TO THE MATTERS A TITLE REPORT WOULD DISCLOSE, THE LAND DEPICTED ON THIS PLAN MAY BE SUiBJECT TO AND /OR IN BENEFIT OF RIGHTS AND EASEMENTS THAT ARE NOT SHOWN. 3. THE MERIDIAN OF,THIS PLAN IS THE MASSACHUSETTS COORDINATE SYSTEM, MAINLAND ZONE, NAD 1 983 BASED ON A SINGLE FREQUENCY GPS SURVEY HOLDING CORS MTS NORTHAMPTON AS CONTROL. N/F MARILYN B. E'VERETT, CORDIS L. BEAD & ROGER H. BEAN A PORTION OF DEED 2058225 & HELEN M. BEAN & SUSAN BEAN FOUNTAIN A PORTION OF DEED 4316 -51 W LINDA BEAN A PORTION OF DEED 9119-199 AREA = 21,780 S.F. 0.500± ACRE LOT 2 Q 06 -008 ASSESSOR'S MAP - PARCEL LOCUS PROPERTY LINE � a N/F NOW OR FORMERLY ^ ^ ^ ^ ADJOWERS PROPERTY LINE (f) ^ ^ ^ 0 v MONUMENT FOUND y y y y y y TREE LINE AQ� A CALCULATED POINT STONE WALL IRS • IRON ROD SET EASEMENT LINES EDGE OF WATER 4. CLUSTER DEVELOPMENT COMPUTATIONS: AREA BETWEEN RIVER BANK AND A TWO LOT CLUSTER 0EVELOPMENT REQUIRES 160,000 S.F. OF WHICH 80,000 S,F. MUST DIGITIZED 100 YEAR FLOOD LINE BE OPEN SPACE, OF �HICH 60,000 MUST BE DEVELOPABLE. OPEN SPACE LOT B ' PROVIDES 74,894± S.F. = 23, 46 6± S.F. 100 YEAR FLOOD ZONE DIGITIZED - - - . FROM FLOOD INSURANCE RATE ,,' ', ►� MAP COMMUNITY PANEL NUMBER ;' �►'' 250167 0001 A N ! EFFEC11VE DATE APRIL 3, 1978 ! C3 f TWO DEVELOPED LOTSOTOTAL AREA = 43560 (1.0 ACRES) THEREFORE TOTAL OP SPACE REQUIRED = 116,440 (142313 PROVIDED) f TOTAL CLUSTER PROJ ' T AREA (EXLUCING LAND UNDER WATER) = 4.267 AC. OPEN SPACE LOT B: r TOTAL LOT AREA = 153,870± S.F. TOTAL LOT AREA = 1'42,313± S.F. (EXCLUDING LAND UNDER THE MILL RIVER) DEVELOPABLE LAND -� S.F. (EXCLUDING LAND BELOW THE 100 YEAR FLOOD ZONE AS DIGITIZED FROM FIRM ) G `262 C1 �y �\ \„'�� _ _ " _ -- — �• — -- — .�- \1 ate. '■— +r — — 1 _ '\ \ = \ �.. / "+ \ _ — ...�- _ �- � r _ —_ `+1 � _— -- _ _ -- � � \. _ � \ \ \ \ � \ \ OPEN SPACE PARCEL B WOODED d '/ /"^ _ _ `_�'' —'"� � — ^" ""- '•.�_�� —'�`� 1 \ `` `` ` \ �``�`` \�`�� ` `'\ `�\�'�. TIZED 1�}0 MARILYN B. EVERETT, CaRD1S L. BEAN AREA BETWEEN DIGI _ & ROGER H. BEAN YEAR; FLOOD LINE AND TOE OF A PORTION OF DEED 2058N225 DATE / ^3 , SLOPE =74 894± S & DANIEL F. STASZ RPLS# 47160 HELEN M. BEAN & SUSAN BEAN FOUNTAIN A PORTION OF DEED 4316M51 I o \ \ \, \ \ \. \ \���, \ \ \ \\\;_\ •, ` WOODED LINDA BEAN N: 2,951,8$8.3 ---- 8' 1 . `` \ \`� \ \` ` ��.�: \ \ \� `. ___--------- t` �,\�.�,��\� \ \ \ \ \``: =__:.\ \ \` , , A PORTION OF DEED 9119199 16A E. 334,047.59" LOTS 1 -15 AREA - 153 SO. FT. 3.532± ACRES FAIRWAY VILLAGE CONDOMINIUM �. o \ `'.� _ _ ^ � � �'�,,�'`�;'�;1 ;;` =\ ��.■ \, �,� � DEED 2539220 I } ---_ -- :•� ����.� \`•� OPEN SPACE ASSOCIATED E J PLAN 131 rj26 \ !' ` \ \� � ' ' WITH LOTS 1 8c 2 ' ��,, ,, \_ _ \ \. • a �� PLAN 13520 \ \1 \\ \_ ` \ \ _ \\ , \ �= -NOT A BUILDING LOT- • \ •'• `. ` ` ` ` ` '` BOTTOM OF SLOPE BASED ON CURRENT TOPOGR - A IC FIELD NO 1. FIELD SURVEY BY EDM TOTAL STATION. 2. THIS PLAN WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND IS SUBJECT TO THE MATTERS A TITLE REPORT WOULD DISCLOSE, THE LAND DEPICTED ON THIS PLAN MAY BE SUiBJECT TO AND /OR IN BENEFIT OF RIGHTS AND EASEMENTS THAT ARE NOT SHOWN. 3. THE MERIDIAN OF,THIS PLAN IS THE MASSACHUSETTS COORDINATE SYSTEM, MAINLAND ZONE, NAD 1 983 BASED ON A SINGLE FREQUENCY GPS SURVEY HOLDING CORS MTS NORTHAMPTON AS CONTROL. N/F MARILYN B. E'VERETT, CORDIS L. BEAD & ROGER H. BEAN A PORTION OF DEED 2058225 & HELEN M. BEAN & SUSAN BEAN FOUNTAIN A PORTION OF DEED 4316 -51 W LINDA BEAN A PORTION OF DEED 9119-199 AREA = 21,780 S.F. 0.500± ACRE LOT 2 N/F MARK A. & ANN - MARIE MOGGIO DEED 7038322 S. PLAN 57103 TI T �1 vv v DAWN G. M ETZGER DEED 3974240 PLAN 152"53 Cu��T ►J 111�L� 1 16A-023 N/F RICHARD J. TACY n n XArK.l r' AA F'T7r-F•R V► 1 T T I 1 V. DEED 8211r- PLAN 15253 ' 16C -03'O N /F I RICHARD & DAWN G. f ACY DEED 8794 137 PLAN 152 53 16C -026 & 031 N/F DOROTHY A. & DAR COTE - HOUGHTON DEED 4869 "46 PLAN 152-53 16C -021 DAR OL W. 8c MARTHA J. BISHOP DEED 7992x121 PLAN 134r-64 16C -020 N /F SCOTT J. M ESSI NGER & JANICE M. SZYMASZEK nc'r7n C21 n� ' �.7za VLLV V 1 9 Ea!V ► PLAN 58-41 1" IPF FLUSH SPRINT' LAWRENCE H. & LINDA BEAN DEED 2891 PLAN 13464 EPLP IN 5x5 CONC. BD. FD N: 2,950,647.63' E 334,241.869, STREET \ t T 2 1 LOT 1 1" CAPPED 4aF U P 0.3' IRS IRS O M � f�1 � � o 0 w z a Q SURVEY. J -' --- O � a Z d a 3: 0 0 0 0 O PEN SPACE PARCEL A Q � Ln Li E) C) CD z CITY OF NORTHAMPTON N 1= rn 0-` DEED XXXNXX\ 0 Q i.� -, .., .... \ \ \ f 0 AREA = 51,574± SQ. FT. ' C > \ \___ _ �'`\ - -- ------- — - -_ -- _ ------- ,,,�s _�,'_ -_ _ 1.184± ACRES > � -.'� . \;__ \_ - \_�; \ \ -\ _ II d' ��� - ---- _-___ � - 1.+. d' 0 d ` \ ~ ` \ \ \ \ ` \ \ �` \ ■ \ ti`. ,_ _ +.. ��,\ \\ -___ / f ___ - I /i ce - - OPEN SPACE ASSOCIATED WITH \ \� \ \;,�, ,. __,__ -,� • 3- - -=-- SPECIAL PERMIT ISSUED 03 -26 -2010 �; \ \�� - \� , \ -, - -- __-= _ i ____ -�,_� -_ __- _ =_ =_- _ -= =_ __________ " -_ -_ - -- _ _- :�' - BUILDING LOT- NOT A \ �'! ~' \ = - ___ = '-�_ -- ____= `"�____— _^ �` = =�_= =�- ' "� - -- - - - -- -- 70- -'- = --" --_ -_' ' "- _- _ " " - r �" " __- _ r----- �•-- _ - - - - -- _- - -r -_ _ - __. -- -.- __- ' \ -_ -------- \_ - - -_ - - ---- - = - - -- 250 -- - - - - -- - -� -i - - - -- - - _ _ -__ _ -_- _ ----------- ��,��.�'r� !- .-'-. __ . ' -"- _. r /= // t \__---- - - - -_ _ - _ - -_ •- 290 - .... j '/'J - .-_ - -••- r '�'' ✓_J I- �_�� :__ _____--- =__-- �--`= _ - __, ___�____ ,_ J , l � 300 1 ------------------ _ - =��. 300 16A -021 AREA BETWEE BOTTOM OF - - \ w 1 6C - 028 N/F SLOPE AND PROPERTY LINE N/F 16A -031 r RICHARD J. TACY r' 44 S.F. ROBERT G. HELEN M. N/F MARK A. & ANN - MARIE MOGGIO DEED 7038322 S. PLAN 57103 TI T �1 vv v DAWN G. M ETZGER DEED 3974240 PLAN 152"53 Cu��T ►J 111�L� 1 16A-023 N/F RICHARD J. TACY n n XArK.l r' AA F'T7r-F•R V► 1 T T I 1 V. DEED 8211r- PLAN 15253 ' 16C -03'O N /F I RICHARD & DAWN G. f ACY DEED 8794 137 PLAN 152 53 16C -026 & 031 N/F DOROTHY A. & DAR COTE - HOUGHTON DEED 4869 "46 PLAN 152-53 16C -021 DAR OL W. 8c MARTHA J. BISHOP DEED 7992x121 PLAN 134r-64 16C -020 N /F SCOTT J. M ESSI NGER & JANICE M. SZYMASZEK nc'r7n C21 n� ' �.7za VLLV V 1 9 Ea!V ► PLAN 58-41 1" IPF FLUSH SPRINT' LAWRENCE H. & LINDA BEAN DEED 2891 PLAN 13464 EPLP IN 5x5 CONC. BD. FD N: 2,950,647.63' E 334,241.869, STREET \ t T 2 1 LOT 1 1" CAPPED 4aF U P 0.3' IRS IRS O M � f�1 � � o 0 w z a Q L�J 't O � a Z d a 3: 0 0 V I I I Ln I F l o AA cn Cn L�J 't 0 � Q o Ln 3: 0 0 0 0 Q � Ln Li E) C) CD z N 1= rn 0-` 0 Q = - 0 Lij C > 0 cn Cn m 't 0 � Q o Ln 3: 0 0 0 0 Q � Ln E) C) CD z rn � 0 z o H �z� zo��x z x � �Z, v SHEET N0. 1 °F1 e q l l g � d z z � Q 'O - 0 z U z_ > � c d' 0 d z o H �z� zo��x z x � �Z, v SHEET N0. 1 °F1 e