Loading...
23B_013H 125 Locust St Planning and ZoningLanning$oard and Zoning Board Applicatiorj'~~08-12-11 14:05:49 o n \\ __ a. Planning and Zoning Boards Owner First Name 1~Lnssachusetts ' ,.,..., , _„..,~ ..............~.x..~.f * Owner Last Name OR Business Name Corrunonwealth of { * Owner Address 811 North King Street; * Ci Northampton. * State Massachusetts * Zi Code 01060 A licant First Name Ci Northam ton F ~.,.~„~k.,_..,..,.,,,.,..~..,~ *'A ~ licant Last Name Dept;Public Works Business if a licable ....~.v,.-~,~Ya,.~:. ~,.M,,..ti,,.~.,.~:.R,..,~.~. ~~~.,a..~., W,~r~,.~ * A licant Street Address 125 Locust Street * Ci Northam ton P,,..,,.~.w * State Massachusetts ~ * Zi Code 01060 * Phone (413)587 ~1570 N * Email tsmith@nohod w.org 4 * Assessors' Map(s) and Parcel ID(s) 23B / 13 * Parcel Deed Book and Page Book 1131 Page 407 * Work Location n/a~ file://///Smbl/engi~ingf Locust%20Street/State%20Yard/Permits/A... Tanning Board and Zoiung Board Applicati~-~ 2008-12-11 14:05:49 .__,~ '* Post Office for ro erry Northampton 01060 * Zoning/Overlay Districts ,GBN a * What PERMITS or AMENDMENTS are you applying for? file://///Smb 1/en~~ring/Locust%20Street/State%20Yard/Permits/A... `~,_ PLANNING Special Permit w/ INTERMEDIATE Site Plan ($200, except Flag lots $1,000) PLANNING Special Permit w/MAJOR Site Plan ($1,000 plus, unless this is an amendment, $0.05/sq ft of proposed new building) PLANNING Intermediate Site Plan ($200) PLANNING Major Site Plan Approval ($1,000 plus, unless this is an amendment, $0.05/sq ft of proposed new building) X APPROVAL NOT REQUIRED Surveys ($250/plan page) PRELIMINARY SUBDIVISION ($1,000-Type II or $600-Type I PLUS $75 per unit) "DEFINITIVE SUBDIVISION (Greater of $3,000 OR $10/linear foot of new roadway; $4,600 L ~ preliminary; $400 PLUS $10/foot fox one lot minor subdivisions; $500 for Amendments) .~,rs ZONING BOARD Special Permit ($200) ZONING FINDING ($200) APPEAL OF BUILDING COMNIISSIONER-Zoning ($200) COMPREHENSIVE 40B PERMIT ($500 plus $0.05/sq ft of proposed new building) VARIANCE ($1,000 plus $0.05/sq ft of proposed new building) 43D Permit (Any Planned Village commercial project) * Relevant sections of zoning and subdivision regulations Approval Not Re aired * Describe ro'ect and relief/approvals needed Subdivided property ~ ~- ~C~~~.O~ ~• discussed my application with my neighbors (highly recommended) X i I HAVE ~_~~. OR $14/foot if no 1/14/2009 10:10 AM 'lanning hoard and Zoning Board Applicatio'~?008-12-11 14:05:49 . ~_i Finding Request file://///Smb 1 /en~ring/Locust%20 Street/State%20Yard/Permits/A... * How does the project meet the Finding criteria? k The existing property, use, or building is legally preexisting nonconforming ,:~ The project does NOT create a new zoning violation ~~ The project is NOT more detrimental to the neighborhood than the old use * Describe in detail how you meet the Finding Criteria Appeal of Building Commissioner Action * Are you claiming: The Building Commissioner erred in a zoning related matter A UNIQUE injury as a result of such error that meets the standing test '~ Explain in detail l) What the alleged zoning error the Building Commissioner made and 2) What is the unique injury YOU suffer from the alleged error? Comprehensive 40B Permit * Check all that apply for your 40B project We are not requesting any waivers k We are requesting Zoning waivers K We are requesting Subdivision waivers We are requesting waivers of other local rules ~. Attached is our Site Eligibility better i Attached is our Draft Affordability Agreement Attached is our Financial Proforma in compliance with 40B 's Explain WHAT waivers are Variance Criteria WHY, and HOW could you AVOID them? * I meet the following Variance Criteria There are UNIQUE circumstances that effect ONLY this property/structure and not other properties in the neighborhood A literal enforcement of the zoning would create a HARDSHIP, financial or otherwise 0:10 AM latining Board and Zoning Board Application X2008-12-11 14:05:49 ~~ ~ If denied there would be NO reasonable use of the property The hardship is NOT self-imposed Relief cut be granted without detriment to the public good file://///Smb 1/en~rinp~Locust%20Street/State%20Yard/Permits/A... ~n~ ~! The variance would not substantially derogate from the intent of the zoiung The request is for the SMALLEST reliefpossible * You must document how you meet ALL of the Variance criteria. Special Permit and Site Plan Criteria * Will the project PROTECT adjoining premises from seriously detrimental uses * How A * Will the project MITIGATE and MINIMIZE traffic impacts * How * Will the project PROMOTE a harmonious relationship of structures and open space * How * Will the project PROTECT the general welfare * How * Will the project AVOID OVERLOADING and MITIGATE City resources * How ~vm._e,=>,,,.r~.~..,.:.M.x~..~n~.~,.. o,~m~-m~,•.~e~.:gr,~:=..~.u., _~_..~.~-s..~.~.._u....y=e<..N ~.<.•,~..,._.~..~,1~.a..,~...~..,..,~~_-~~,~.~...•....:~.....~~ * Will the project PROMOTE and NOT HARM City planning objectives * How * Will the project • of6 1/14/2009 10:10 AM lanningBoard and Zoning BoardApplicati~` ~ 008-12-11 14:05:49 Meet all zoning requirements file://///Smb 1/en~~;ring/Locust%20Street/State%20Yard/Permits/A... '~ How s Which preferred methods of improved circulation are used Project minimizes curb cuts Project only uses one curb cut Project uses a common driveway or shared service road for access Project uses an existing side street Project uses extra measures to reduce parking need Project separates vehicular traffic from birycle and pedestrian traffic Project is requesting a reduction in required parking spaces as follows: * Describe how meet the improved circulation goals (above). and how you reduce curb cuts and parking demand. * How does project mitigate all traffic impacts? I am providing justification that there will be no increase in traffic from the project; OR I am mitigating ALL off-site incremental traffic ANYWHERE from the project; OR r In lieu of studying and mitigating ALL off-site incremental traffic, I am proposing $2,000 in-lieu of fee per peak hour vehicle ~, ~ trip ($1,000 for projects within 1/2 mile of downtown or Florence Center) ~ I understand that traffic mitigation does NOT replace the need to ensure safe traffic circulation to the site from surrounding ~_ar streets and nearby intersections '~ MAJOR PROJECTS: This project mitigates stormwater impacts by: All catch basins and manholes have 4' sumps All runoff from a 0.4 inch xainstoxm (first flush) will be detatned for an average of 6 hours No increase from PRE to POST-development peak flow during 1, 2, ox 10 year NRCS design storm The impacts are otherwise mitigated (explain) DPW has issued a stormwater permit fox the project * I REQUEST a WAIVER from these Site Plan filing requirements (describe why below) 1. Site Plan at 1" = 40' or greater 2. Name and address of the owner and developer, name of project, and date 3. Existing and proposed buildings, property line setbacks, building elevations, exterior entrances/exits 4. Present and proposed use of the land and buildings 5. Existing and proposed topography using 2' contours 6. Wetlands, streams, water bodies, drainage swales, wetlands, unique land features 7. Location of parking and loading, public and private ways, driveways and walkways, access and egress points, proposed surfacing 8. Location and details of all stormwater drainage, detention and water quality facilities, public and private utilities and ~~,~ easements, sewage disposal faalities, water supply facilities ~. 9. Existing and proposed landscaping, trees, plantings, stone walls, buffers, and fencing Manning Board and Zoning Board Applicati~' -`?008-12-11 14:05:49 file://///Smbl/en~~ring/Locust%20Street/State%20Yard/Permits/A... p ___ n 10. Existing and proposed signs locations, dimensions, and details 11. Provisions for refuse removal and screeiung 12. Lighting/Photometric Plus (maximum 0.5 foot candles at pxoperry boundary) 413. Erosion control plan (MAJOR projects only) 14. Traffic Study (MAJOR projects only) 15. Stormwater Management Plan AND Drainage Calculations(MAJOR projects only) f j 16. Plans stamped by Professional Engineer * Add time and place of hearing as soon as it is available I have ALREADY posted the REQUIRED sign so it is visible from a public way http://tinyuxl.com/23mopt (http://tinyurl.com/23mopt) ANR Applications must include the following in order to be processed:l. A box located on the lower right of each plan showing the following: A. Approval Not Required signature block B. A note that "Plannnig Board Endorsement is not a determination that the lots shown are buildable lots" C. A list of all parcels shown on the plan with a correspondence table to Northampton Assessors Parcel ID2. An electronic copy of the survey in AutoCAD 2000 format with all parcels closing to an accuracy of 1 in 25,0003. Control points when required by the Northampton Subdivision Regulations. http:/ /www.northamptonma.gov/opd/Abutters%5FLists%5FOld%SFPexmits%SFHistoxic%5FInventories/ (http: / /www.northamptonma.gov/opd/Abutters%5FLists%5FOld%SFPexmits%5FHistoxic%5FInventories/) A 43D project (applies to any project with a commeraal or industrial component within the Planned Village District) guaruitees that most applications for city permits will be processed within 180 days.To take advantage of tlus:l. You must apply for all relvent permits at the same time at the start of the process.2. The time clock does not start until the City has determined that the permit applications are complete.Contact Carolyn Misch, Permt Manager/Senior Planner, Office of Planning and Development, fox details. -~-of-6- ~-- ~.. n Date Decision Filed. ~'} City Clerlc (signature) a -